Goose Prairie Solar
12935 SR 24, Moxee, WA 98936Plant Summary Information
Goose Prairie Solar is ranked #2 out of 9 solar farms in Washington in terms of total annual net electricity generation.
Goose Prairie Solar generated 64.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Goose Prairie Solar |
|---|---|
| Utility Name | Goose Prairie Solar LLC |
| Location | Yakima County, WA |
| Initial Operation Date | December 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 161.7 GWh |
| Annual Consumption | 552.3 k MMBtu |
| Ranked #2,759 out of 12,539 Power Plants Nationwide | |
| Ranked #522 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #70 out of 133 Washington Power Plants | |
| Ranked #2 out of 9 Washington Solar Power Plants | |
| Fuel Types | Solar |
Map of Goose Prairie Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Goose Prairie Solar.
Monthly Net Generation for Goose Prairie Solar
Goose Prairie Solar Details
| Summary Information | |
|---|---|
| Plant Name | Goose Prairie Solar (67261) |
| Plant Address | 12935 SR 24, Moxee, WA 98936 |
| Utility | Goose Prairie Solar LLC (66142) |
| Latitude, Longitude | 46.52923, -120.23953 |
| Generation Dates on File | Aug 2024 to Sep 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 161.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Bonneville Power Administration (BPAT) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator GOOSE Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 102.45 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Goose Prairie Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #512 | Wilkinson Solar LLC | Pantego, NC | 163.2 GWh |
| #513 | Lily Solar | Martin, SC | 163.2 GWh |
| #514 | Ellis Solar LLC | Midlothian, TX | 163.0 GWh |
| #515 | Terrill Creek | Green Cove Springs, FL | 162.5 GWh |
| #516 | High Springs Solar Power Plant | High Springs, FL | 162.5 GWh |
| #517 | Ivanpah 1 | Nipton, CA | 167.9 GWh |
| #518 | Appaloosa Solar I | Cedar City, UT | 162.4 GWh |
| #519 | G.S.E. One LLC | Bonham, TX | 162.1 GWh |
| #520 | Fort Green Solar Power Plant | Bowling Green, FL | 161.8 GWh |
| #521 | Hawthorne Creek | TBD, FL | 161.8 GWh |
| #523 | Norton Creek | TBD, FL | 161.3 GWh |
| #524 | Misenheimer Solar LLC | Gold Hill, NC | 161.0 GWh |
| #525 | Mitchell Creek | TBD, FL | 160.4 GWh |
| #526 | Blake Solar Plant | Charles Town, WV | 160.2 GWh |
| #527 | Bay Trail Solar Power Plant | Crystal River, FL | 160.2 GWh |
| #528 | Cedar Trail | Glen St Mary, FL | 160.1 GWh |
| #529 | Big Juniper Solar | TBD, FL | 160.0 GWh |
| #530 | Altavista Solar | Lynch Station, VA | 159.8 GWh |
| #531 | Storey Bend Solar | Saint Cloud, FL | 159.6 GWh |
| #532 | Columbia Solar Power Plant | Fort White, FL | 159.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Goose Prairie Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Horn Wind II | Bickleton, WA | 97.5 GWh | 42.3 mi |
| Big Horn Wind Project | Bickelton, WA | 443.5 GWh | 44.4 mi |
| Camas Solar Project | Ellensburg, WA | 9.7 GWh | 32.3 mi |
| Chandler | Benton City, WA | 31.4 GWh | 35.9 mi |
| Columbia Generating Station | Richland, WA | 7.7 TWh | 43.3 mi |
| Cowiche | Tieton, WA | 2.7 GWh | 26.2 mi |
| Horn Rapids Solar, Storage and Training | Richland, WA | 5.2 GWh | 45.3 mi |
| Juniper Canyon I Wind Project | Bickleton, WA | 212.2 GWh | 42 mi |
| Lund Hill Solar | Bickleton, WA | 367.4 GWh | 44.6 mi |
| Orchard Avenue 1 | Yakima, WA | 2.5 GWh | 21.3 mi |
| PEC Headworks | Moses Lake, WA | 17.8 GWh | 46.5 mi |
| Penstemon Solar Project | Ellensburg, WA | 10.7 GWh | 32.3 mi |
| Priest Rapids | Mattawa, WA | 4.0 TWh | 17.7 mi |
| Roza | Yakima, WA | 47.7 GWh | 12.9 mi |
| Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh | 46.9 mi |
| Tieton Dam Hydro Electric Project | Rimrock, WA | 19.5 GWh | 43.1 mi |
| Urtica Solar Project | Ellensburg, WA | 10.6 GWh | 45.3 mi |
| Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh | 29.5 mi |
| Wanapum | Beverly, WA | 4.3 TWh | 27 mi |
| Wild Horse | Ellensburg, WA | 571.1 GWh | 35.1 mi |