3960 Tjossem Road, Ellensburg, WA 98926Plant Summary Information
Penstemon Solar Project is ranked #4 out of 9 solar farms in Washington in terms of total annual net electricity generation.
Penstemon Solar Project generated 1.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Penstemon Solar Project |
|---|---|
| Utility Name | Greenbacker Renewable Energy Corporation |
| Location | Kittitas County, WA |
| Initial Operation Date | January 2022 |
| Last Update | Dec 2024 |
| Annual Generation | 10.7 GWh |
| Annual Consumption | 37.0 k MMBtu |
| Ranked #5,995 out of 12,539 Power Plants Nationwide | |
| Ranked #1,712 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #109 out of 133 Washington Power Plants | |
| Ranked #4 out of 9 Washington Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
TUUSSO Energy, LLC (2018 to 2020) Greenbacker Renewable Energy Corporation (2021 to 2024) |
Map of Penstemon Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Penstemon Solar Project.
Monthly Net Generation for Penstemon Solar Project
Penstemon Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Penstemon Solar Project (62069) |
| Plant Address | 3960 Tjossem Road, Ellensburg, WA 98926 |
| Utility | Greenbacker Renewable Energy Corporation (60025) |
| Latitude, Longitude | 46.95931, -120.50905 |
| Generation Dates on File | Jan 2022 to Dec 2024 |
| Initial Operation Date | January 2022 |
| Annual Generation | 10.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF17-342 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Puget Sound Energy (PSEI) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Puget Sound Energy Inc (15500) WA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator PENST Details Operating January 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 6.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Penstemon Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1702 | Pohatcong Solar Farm | Pohatcong, NJ | 10.9 GWh |
| #1703 | AFA Solar Farm | Colorado Springs, CO | 10.9 GWh |
| #1704 | Wedge | Goldsboro, NC | 10.9 GWh |
| #1705 | Napoleon Solar I | Napoleon, OH | 10.8 GWh |
| #1706 | Starr | Clinton, NC | 10.8 GWh |
| #1707 | Lane II Solar, LLC | Goldsboro, NC | 10.8 GWh |
| #1708 | Gladstone Farm | West End, NC | 10.8 GWh |
| #1709 | Tyto Solar | Fitchburg, WI | 10.8 GWh |
| #1710 | NorWest Energy 9 LLC | Pendleton, OR | 10.7 GWh |
| #1711 | CBEP Solar 1, LLC | Sterling, CO | 10.7 GWh |
| #1713 | Wyandot Solar Farm | Upper Sandusky, OH | 10.7 GWh |
| #1714 | Munro Valley Solar | Olancha, CA | 10.7 GWh |
| #1715 | Eastwood Solar | Mankato, MN | 10.7 GWh |
| #1716 | Overman Solar | Goldsboro, NC | 10.7 GWh |
| #1717 | Spectrum Solar Hybrid | Oxon Hill, MD | 10.7 GWh |
| #1718 | IBM Solar | Boulder, CO | 10.6 GWh |
| #1719 | Badger | Maysville, NC | 10.6 GWh |
| #1720 | Saw Solar | China Grove, NC | 10.6 GWh |
| #1721 | Urtica Solar Project | Ellensburg, WA | 10.6 GWh |
| #1722 | Jamesville Road Solar, LLC | Jamesville, NC | 10.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Penstemon Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Camas Solar Project | Ellensburg, WA | 9.7 GWh | 0 mi |
| Cowiche | Tieton, WA | 2.7 GWh | 21.4 mi |
| Crystal Mountain | Greenwater, WA | 492.0 MWh | 45.6 mi |
| Goose Prairie Solar | Moxee, WA | 161.7 GWh | 32.3 mi |
| Orchard Avenue 1 | Yakima, WA | 2.5 GWh | 26.3 mi |
| Packwood | Packwood, WA | 63.0 GWh | 56.1 mi |
| PEC Headworks | Moses Lake, WA | 17.8 GWh | 32 mi |
| Priest Rapids | Mattawa, WA | 4.0 TWh | 35.8 mi |
| Quincy Chute | Quincy, WA | 30.9 GWh | 59 mi |
| Rock Island | Wenatchee, WA | 2.2 TWh | 33.1 mi |
| Rocky Reach | Wenatchee, WA | 5.1 TWh | 40.9 mi |
| Roza | Yakima, WA | 47.7 GWh | 23.6 mi |
| Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh | 14.8 mi |
| Swauk Wind LLC | Thorp, WA | 2.4 GWh | 16.9 mi |
| Tieton Dam Hydro Electric Project | Rimrock, WA | 19.5 GWh | 35.9 mi |
| Urtica Solar Project | Ellensburg, WA | 10.6 GWh | 13.3 mi |
| Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh | 15.4 mi |
| Wanapum | Beverly, WA | 4.3 TWh | 26.1 mi |
| Weeks Falls | North Bend, WA | 13.1 GWh | 62.7 mi |
| Wild Horse | Ellensburg, WA | 571.1 GWh | 15.2 mi |