Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Mohonasen Central School District | Tesla Inc. | Schenectady, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Aug 2019 | Dec 2024 | Solar |
| Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1998 | Dec 2024 | Distillate Fuel Oil |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 13.6 GWh | Apr 2018 | Dec 2024 | Natural Gas |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| SWM Fuel Cell | Yaphank Fuel Cell Park, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 55.6 GWh | Nov 2021 | Dec 2024 | Natural Gas |
| St. Mary's Hospital For Children | St. Mary's Hospital For Children | Bayside, NY | New York Independent System Operator (NYIS) | 54.0 MWh | Dec 2010 | Dec 2024 | Distillate Fuel Oil |
| MSAP 13 | MSAP 13, LLC | Troy, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2024 | Solar |
| CES Marbletown Solar | Consolidated Edison Solutions Inc. | Marbletown, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Feb 2021 | Dec 2024 | Solar |
| Fogarty CSG | Fogarty Solar LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Feb 2021 | Dec 2024 | Solar |
| Mount Hope West | Mount Hope Solar 2 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Mar 2020 | Dec 2024 | Solar |
| Mount Hope East | Mount Hope Solar 1 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Sep 2019 | Dec 2024 | Solar |
| Bluestone | Bluestone Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2019 | Dec 2024 | Solar |
| Underhill | Underhill Solar LLC | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2019 | Dec 2024 | Solar |
| Adirondack Solar | Cypress Creek Renewables | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Mount Kisco Landfill Solar & Storage CSG | BQ Energy LLC | Mount Kisco, NY | New York Independent System Operator (NYIS) | 756.0 MWh | Nov 2020 | Dec 2024 | Solar |
| NY- CSG- Johnstown 2 | NY- CSG- Johnstown 2 | New York, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Feb 2020 | Dec 2024 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2020 | Dec 2024 | Solar |
| NY - CSG - Ellsworth II | Nautilus Solar Solutions | Halfmoon, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Aug 2019 | Dec 2024 | Solar |
| Medusa NY 1 | Medusa NY 1, LLC | Medusa, NY | New York Independent System Operator (NYIS) | 3.3 GWh | May 2020 | Dec 2024 | Solar |
| Walden NY 1 | Walden NY 1, LLC | Walden, NY | New York Independent System Operator (NYIS) | 2.9 GWh | May 2020 | Dec 2024 | Solar |
| Westtown NY 2 | Westtown NY 2, LLC | Westtown, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2020 | Dec 2024 | Solar |
| Middletown NY 1 | Middletown NY 1, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Feb 2020 | Dec 2024 | Solar |
| Westerlo NY 1 | Westerlo NY 1, LLC | South Westerlo, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Dec 2019 | Dec 2024 | Solar |
| Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Aug 2019 | Dec 2024 | Solar |
| Landau Solar | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
| NY - PANYNJ - LaGuardia - Rooftop | Forefront Power, LLC | Queens, NY | New York Independent System Operator (NYIS) | 999.0 MWh | Jun 2022 | Dec 2024 | Solar |
| OYA Church Road | OYA Church Road A LLC | Baldwinsville, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2022 | Dec 2024 | Solar |
| Washington Avenue Solar, LLC | Green Street Power Partners | Glenville, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Nov 2020 | Dec 2024 | Solar |
| RT32 Westerlo Solar 1 | RT32 Westerlo Solar 1, LLC | Westerlo, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Feb 2020 | Dec 2024 | Solar |
| JB-Tobin 2 | AES Clean Energy | La Grange, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Nov 2021 | Dec 2024 | Solar |
| 100 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Apr 2020 | Dec 2024 | Solar |
| 456 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Sep 2020 | Dec 2024 | Solar |
| Union Springs 40 | EF NY CDG 011, LLC | Union Spring, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Jan 2022 | Dec 2024 | Solar |
| Union Springs 963 | EF NY CDG 003, LLC | Union Spring, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Dec 2021 | Dec 2024 | Solar |
| North Eagle Village Solar | EF NY CDG 001, LLC | Manilus, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Dec 2021 | Dec 2024 | Solar |
| Green Lakes Solar | EF NY CDG 002, LLC | Manilus, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Feb 2022 | Dec 2024 | Solar |
| Judd Road Solar | EF NY CDG 007, LLC | Oriskany, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Castleton | Altus Power America Management, LLC | Castleton on Hudson, NY | New York Independent System Operator (NYIS) | 8.1 GWh | May 2021 | Dec 2024 | Solar |
| Croton Solar | Croton Solar LLC | Cortlandt, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Calverton Solar Energy Center | LI Solar Generation, LLC | Calverton, NY | New York Independent System Operator (NYIS) | 43.7 GWh | Jul 2022 | Dec 2024 | Solar |
| RT405 Westerlo Solar 2 | RT405 Westerlo Solar 2, LLC | Albany, NY | ISO New England (ISNE) | 8.2 GWh | Feb 2020 | Dec 2024 | Solar |
| LR Wheatfield Solar 1 | LR Wheatfield Solar 1, LLC | Wheatfield, NY | ISO New England (ISNE) | 8.4 GWh | Sep 2020 | Dec 2024 | Solar |
| Pendleton Solar 1 | Pendleton Solar 1, LLC | Lockport, NY | ISO New England (ISNE) | 7.5 GWh | Sep 2020 | Dec 2024 | Solar |
| East Fishkill CSG | Altus Power America Management, LLC | East Fishkill, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2019 | Dec 2024 | Solar |
| ELP Greenport CSG | Altus Power America Management, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.7 GWh | May 2020 | Dec 2024 | Solar |
| ELP Kinderhook CSG | Altus Power America Management, LLC | Valatie, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2020 | Dec 2024 | Solar |
| ELP Myer CSG | Altus Power America Management, LLC | Ulster, NY | New York Independent System Operator (NYIS) | 3.5 GWh | May 2021 | Dec 2024 | Solar |
| ELP Saugerties CSG | Altus Power America Management, LLC | Saugerties, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2024 | Solar |
| Cream Street Solar | Cream Street Solar, LLC | Hyde Park, NY | ISO New England (ISNE) | 3.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Little Falls Solar | Little Falls Solar | Little Falls, NY | ISO New England (ISNE) | 3.5 GWh | Sep 2020 | Dec 2024 | Solar |
| Little Falls Solar 1 | Little Falls Solar 1, LLC | Little Falls, NY | ISO New England (ISNE) | 3.5 GWh | Aug 2020 | Dec 2024 | Solar |
| 1639 RT 29 Solar 1 | 1639 RT 29 Solar 1, LLC | Gloversville, NY | ISO New England (ISNE) | 7.5 GWh | Nov 2020 | Dec 2024 | Solar |
| 1639 RT 29 Solar 2 | 1639 RT 29 Solar 2, LLC | Gloversville, NY | ISO New England (ISNE) | 4.7 GWh | Nov 2020 | Dec 2024 | Solar |
| NY - Mines Press | NY - Mines Press | Cortlandt, NY | New York Independent System Operator (NYIS) | 27.0 MWh | Nov 2021 | Dec 2024 | Solar |
| Day Hollow Road Community Solar | Delaware River Solar, LLC | Owego, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Dec 2023 | Dec 2024 | Solar |
| NY8 - Darby Solar | MN8 Energy LLC | Schaghticoke, NY | New York Independent System Operator (NYIS) | 32.4 GWh | May 2023 | Dec 2024 | Solar |
| NY8 - Teichos Pattersonville | MN8 Energy LLC | Pattersonville, NY | New York Independent System Operator (NYIS) | 33.7 GWh | Jan 2024 | Dec 2024 | Solar |
| NY8 - ELP Stillwater Solar | MN8 Energy LLC | Mechanicville, NY | New York Independent System Operator (NYIS) | 34.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Sugar Hill Solar 1 | Sugar Hill Solar 1, LLC | Clifton Park, NY | ISO New England (ISNE) | 8.4 GWh | Nov 2020 | Dec 2024 | Solar |
| 3104 Batavia Solar | 3104 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 5.1 GWh | Feb 2021 | Dec 2024 | Solar |
| 3232 Batavia Solar | 3232 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 6.9 GWh | Feb 2021 | Dec 2024 | Solar |
| Niagara Depot Solar | Niagara Depot Solar, LLC | Niagara Falls, NY | ISO New England (ISNE) | 5.0 GWh | Jun 2023 | Dec 2024 | Solar |
| Angelica Solar Site 1 | NSF Angelica Site 1, LLC | Angelica, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Angelica Solar Site 2 | NSF Angelica Site 2, LLC | Belfast, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Angelica Solar Site 3 | NSF Angelica Site 3, LLC | Belfast, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Angelica Solar Site 4 | NSF Angelica Site 4, LLC | Angelica, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Apr 2022 | Dec 2024 | Solar |
| West Valley Solar | West Valley Solar, LLC | West Valley, NY | New York Independent System Operator (NYIS) | 15.7 GWh | May 2022 | Dec 2024 | Solar |
| Marlborough Solar | Marlborough Solar, LLC | Milton, NY | ISO New England (ISNE) | 3.4 GWh | Feb 2021 | Dec 2024 | Solar |
| Lenox Renewables | Lenox Renewables, LLC | Canastota, NY | ISO New England (ISNE) | 5.4 GWh | Aug 2021 | Dec 2024 | Solar |
| Bizer Creek | Greenbacker Renewable Energy Corporation | Getzville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Mar 2023 | Dec 2024 | Solar |
| Hecate Energy Albany 2 LLC | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 24.7 GWh | Mar 2024 | Dec 2024 | Solar |
| Equinix - Elmsford | Bloom Energy | Elmsford, NY | New York Independent System Operator (NYIS) | 13.0 GWh | Aug 2020 | Dec 2024 | Natural Gas |
| Salt Point Solar (Hybrid) | Generate Capital | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Dec 2020 | Dec 2024 | Solar : 99.9% |
| ELP Claverack Solar | ELP Claverack Solar, LLC | Claverack, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Dec 2022 | Dec 2024 | Solar |
| ELP Livingston Solar | ELP Livingston Solar, LLC | Livingston, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Dec 2022 | Dec 2024 | Solar |
| NY USLE Rome-Oriskany | NY USLE Rome Rome-Oriskany LLC | Rome, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Jun 2023 | Dec 2024 | Solar |
| Oswego | NY USLE Oswego SR104 LLC | Oswego, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Aug 2023 | Dec 2024 | Solar |
| SCS Penfield One 010750 Penfield, LLC | Arevon Energy, Inc. | Penfield, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Aug 2022 | Dec 2024 | Solar |
| Royal Solar Partners (CSG) | Royal Solar Partners, LLC | Oswegatchie, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Jul 2023 | Dec 2024 | Solar |
| Ruler Solar Partners (CSG) | Ruler Solar Partners, LLC | Oswegatchie, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Jul 2023 | Dec 2024 | Solar |
| Summit - Scriba CSG | MN8 Energy LLC | Scriba, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2023 | Dec 2024 | Solar |
| Summit - Oswego | MN8 Energy LLC | Oswego, NY | New York Independent System Operator (NYIS) | 4.0 GWh | May 2023 | Dec 2024 | Solar |
| Summit - Lysander (CSG) | MN8 Energy LLC | Lysander, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Jul 2023 | Dec 2024 | Solar |
| Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
| RIC - Hanover (CSG) | MN8 Energy LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Jul 2023 | Dec 2024 | Solar |
| Source Power NY III - Medina II (CSG) | TJA-NY-11202 Ridge Rd Medina, LLC | Medina, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
| Source Power NY II - Whaling | Whaling Solar, LLC | Utica, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Aug 2023 | Dec 2024 | Solar |
| Source Power Company - Aldrich | Morristown Solar II, LLC | Brier Hill, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Feb 2022 | Dec 2024 | Solar |
| Wildflower Way Solar | Generate Capital | Bath, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Jun 2021 | Dec 2024 | Solar |
| Wheatland 2B Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Wheatland 2A Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2021 | Dec 2024 | Solar |
| West Creek Solar | Generate Capital | Newark Valley, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Svenski Solar (Hybrid) | Generate Capital | Crawford, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Mar 2022 | Dec 2024 | Solar |
| State Highway 17B Solar | Generate Capital | Bethel, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2021 | Dec 2024 | Solar |
| State Route 14A Solar | Generate Capital | Benton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Sangolqui Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Aug 2021 | Dec 2024 | Solar |
| Costanza Solar | Generate Capital | Westerlo, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Brickchurch Solar | Generate Capital | North Rose, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2020 | Dec 2024 | Solar |
| Canoga Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Jun 2021 | Dec 2024 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2024 generation numbers.| County | State Rank | Active Plants | Dec 2024 Generation |
|---|---|---|---|
| Westchester County, NY | # 29 | 31 | 425.9 GWh |
| Bronx County, NY | # 28 | 15 | 438.8 GWh |
| Franklin County, NY | # 27 | 15 | 449.8 GWh |
| Onondaga County, NY | # 26 | 37 | 476.3 GWh |
| Jefferson County, NY | # 25 | 38 | 505.3 GWh |
| Monroe County, NY | # 24 | 41 | 583.9 GWh |
| Yates County, NY | # 23 | 6 | 713.2 GWh |
| Chautauqua County, NY | # 22 | 27 | 882.1 GWh |
| Wyoming County, NY | # 21 | 15 | 906.5 GWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 28 | 1.5 TWh |
| Lewis County, NY | # 18 | 28 | 1.8 TWh |
| Rockland County, NY | # 17 | 10 | 2.0 TWh |
| Saratoga County, NY | # 16 | 37 | 2.0 TWh |
| Kings County, NY | # 15 | 31 | 2.2 TWh |
| Richmond County, NY | # 14 | 19 | 2.3 TWh |
| New York County, NY | # 13 | 18 | 2.5 TWh |
| Nassau County, NY | # 12 | 24 | 2.6 TWh |
| Greene County, NY | # 11 | 13 | 3.1 TWh |
| Rensselaer County, NY | # 10 | 22 | 3.2 TWh |
| Albany County, NY | # 9 | 30 | 4.1 TWh |
| Dutchess County, NY | # 8 | 21 | 4.3 TWh |
| Wayne County, NY | # 7 | 12 | 5.1 TWh |
| Orange County, NY | # 6 | 53 | 5.6 TWh |
| St. Lawrence County, NY | # 5 | 69 | 8.0 TWh |
| Suffolk County, NY | # 4 | 67 | 8.8 TWh |
| Queens County, NY | # 3 | 22 | 13.8 TWh |
| Niagara County, NY | # 2 | 26 | 14.7 TWh |
| Oswego County, NY | # 1 | 33 | 29.7 TWh |