Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| County Highway Solar 2 (CSG) | AES Clean Energy | Johnstown, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Jun 2025 | Dec 2025 | Solar |
| Geer Road Solar 1 CSG | AES Clean Energy | Hudson Falls, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Jul 2025 | Dec 2025 | Solar |
| Wolcott Hill (Camden) (CSG) | Nautilus Solar Solutions | Camden, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2024 | Dec 2025 | Solar |
| North Woods (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2025 | Dec 2025 | Solar |
| Peterboro (CSG) | Nautilus Solar Solutions | Vernon, NY | New York Independent System Operator (NYIS) | 6.8 GWh | May 2024 | Dec 2025 | Solar |
| Gowans (CSG) | Nautilus Solar Solutions | Angola, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Jun 2025 | Dec 2025 | Solar |
| 700 Binnewater | Madison Energy Investments LLC | Rosendale, NY | ISO New England (ISNE) | 1.5 GWh | Aug 2022 | Dec 2025 | Solar |
| GSPP 7024 Fox Rd, LLC | Green Street Power Partners | Marcy, NY | ISO New England (ISNE) | 5.9 GWh | Apr 2023 | Dec 2025 | Solar |
| GSPP 4643 Twelve Corners Road, LLC | Green Street Power Partners | Auburn, NY | ISO New England (ISNE) | 8.0 GWh | May 2023 | Dec 2025 | Solar |
| GSPP 126 Little Bow Rd N, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 6.7 GWh | Nov 2023 | Dec 2025 | Solar |
| GSPP 126 Little Bow Rd S, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 6.5 GWh | Nov 2023 | Dec 2025 | Solar |
| Saratoga Solar III, LLC | Green Street Power Partners | Middle Grove, NY | ISO New England (ISNE) | 5.4 GWh | Nov 2023 | Dec 2025 | Solar |
| Saratoga Solar IV, LLC | Green Street Power Partners | Rock City Falls, NY | ISO New England (ISNE) | 4.6 GWh | Sep 2023 | Dec 2025 | Solar |
| Portland SP | Solar Planet Power | BROCTON, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Dec 2022 | Dec 2025 | Solar |
| NY Finchville Tpke CSG | Finchville Tpke LLC | Otisville, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| NY Lower Road II CSG | Lower Road II, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 4.3 GWh | Nov 2023 | Dec 2025 | Solar |
| NY Lower Road III CSG | Lower Road III, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Nov 2023 | Dec 2025 | Solar |
| State Route 5 | AETS OpCo Holdings LLC | Vernon, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2023 | Dec 2025 | Solar |
| NY Newark St Rt 31 - Environomics S1 | Catalyze Newark Solar Farm 1 Microgrid, LLC | Newark, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Sunnyside 2 Solar | Solar DG NY Sunnyside 2, LLC | Scotia, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Feb 2023 | Dec 2025 | Solar |
| Oneida East | Azimuth 180 Solar Electric, LLC | Holland Patent, NY | New York Independent System Operator (NYIS) | 891.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Ny Frankfort Bleecker St - Frankfort -NG | Frankfort Solar Farm LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 5.4 GWh | May 2024 | Dec 2025 | Solar |
| NY Newark ST RT 31 - Environomics S2 | Catalyze Newark Solar Farm 2 Microgrid, LLC | Newark, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| NY Evans 7690 SW Blvd - SL Evans Array 1 | SL Evans, LLC | Evans, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2025 | Dec 2025 | Solar |
| NY Evans 7690 SW Blvd - SL Evans Array 2 | SL Evans, LLC | Evans, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Apr 2025 | Dec 2025 | Solar |
| NSF Aurelius Site 1 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 2, LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.7 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 3 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 4 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 6.7 GWh | May 2024 | Dec 2025 | Solar |
| NY ALTONA MAYOTT - Environomics P1 | Catalyze Pombrio Solar Farm 1 Microgrid, LLC | Altona, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2024 | Dec 2025 | Solar |
| NY ALTONA MAYOTT - Environomics P2 | Catalyze Pombrio Solar Farm 2 Microgrid, LLC | Altona, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2024 | Dec 2025 | Solar |
| NSF Torrey Site 3 | NSF Torrey Site 3, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Oct 2023 | Dec 2025 | Solar |
| NSF Torrey Site 2 | NSF Torrey Site 2, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Oct 2023 | Dec 2025 | Solar |
| NSF Torrey Site 1 | NSF Torrey Site 1, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Oct 2023 | Dec 2025 | Solar |
| NY PAVILION 6464 SHEPARD RD - Genesee 4 | NY CDG Genesee 4 LLC | Pavilion, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Dec 2024 | Dec 2025 | Solar |
| Glen Mary 1 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Glen Mary 2 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2025 | Solar |
| Barone | Generate Capital | Wurtsboro, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Mar 2024 | Dec 2025 | Solar |
| Krumkill Road Solar North, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Jul 2024 | Dec 2025 | Solar |
| Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 5.4 GWh | Jul 2024 | Dec 2025 | Solar |
| Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2023 | Dec 2025 | Solar |
| Eddy | Generate Capital | Williamson, NY | New York Independent System Operator (NYIS) | 4.3 GWh | Sep 2023 | Dec 2025 | Solar |
| Janiak | Generate Capital | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2023 | Dec 2025 | Solar |
| Ridgeway 1 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 10.0 GWh | Oct 2023 | Dec 2025 | Solar |
| Rivard 2 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2023 | Dec 2025 | Solar |
| County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 9.0 GWh | Apr 2024 | Dec 2025 | Solar |
| NY FONDA 182 BOSHART RD - Montgomery 1 | NY CDG Montgomery 1 LLC | Fonda, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Jun 2025 | Dec 2025 | Solar |
| Tubolino CSG | AES Clean Energy | Adams, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Jan 2025 | Dec 2025 | Solar |
| White Plains RFP Shapham Place | Shapham Place Solar Project 2020 LLC | White Plains, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Apr 2022 | Dec 2025 | Solar |
| Richmond (NY) | Solar Planet Power | Honeoye, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Dec 2022 | Dec 2025 | Solar |
| Catskill Solar | Catskill View Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Jan 2023 | Dec 2025 | Solar |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Sep 2024 | Dec 2025 | Solar |
| Bodhi Solar | Bodhi Solar, LLC | Wheatfield, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Jul 2024 | Dec 2025 | Solar |
| AES Laubacher Solar CSG | AES Clean Energy | Albion, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Jan 2025 | Dec 2025 | Solar |
| AES Baird Solar CSG | AES Clean Energy | Albion, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Apr 2025 | Dec 2025 | Solar |
| Brookhaven Landfill Solar Farm 1 | Brookhaven 1 | Brookhaven, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Oct 2025 | Dec 2025 | Solar |
| NY Breesport 625 Breesport Rd | Catalyze Breesport Road Microgrid, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 1.9 GWh | May 2025 | Dec 2025 | Solar |
| Ontario 2 CDG | NY CDG Ontario 2, LLC | Phelps, NY | New York Independent System Operator (NYIS) | 4.5 GWh | May 2025 | Dec 2025 | Solar |
| Johnson City Solar | Above Grid Binghamton Solar LLC | Johnson City, NY | New York Independent System Operator (NYIS) | 196.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jun 2024 | Dec 2025 | Solar |
| SL JAMESTOWN ARRAY 1 | SL Jamestown, LLC | Jamestown, NY | New York Independent System Operator (NYIS) | 337.0 MWh | Sep 2025 | Dec 2025 | Solar |
| SL JAMESTOWN ARRAY 2 | SL Jamestown II, LLC | Jamestown, NY | New York Independent System Operator (NYIS) | 234.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Niagara Solar Project | DG Niagara, LLC | Randomville, NY | New York Independent System Operator (NYIS) | 4.9 GWh | Sep 2024 | Dec 2025 | Solar |
| Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2024 | Dec 2025 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Ticon Solar | Ticon Solar, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Oct 2024 | Dec 2025 | Solar |
| Guilderland Solar | Helios Energy New York 13 LLC | Altamont, NY | New York Independent System Operator (NYIS) | 4.6 GWh | Nov 2023 | Dec 2025 | Solar |
| Enfield Solar Site 2 | NSF Enfield Site 2, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Enfield Solar Site 3 | NSF Enfield Site 3, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Enfield Solar Site 1 | NSF Enfield Site 1, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2024 | Dec 2025 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Warrior Solar Partners | Warrior Solar Partners, LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Jul 2023 | Dec 2025 | Solar |
| TJA-NY- Dix Solar Farm LLC | Dimension Energy LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Chestnut Ridge Rd Moravia, LLC | Dimension Energy LLC | Moravia, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-1454 CR 15 Oswegatchie, LLC | Dimension Energy LLC | Oswegatchie, NY | New York Independent System Operator (NYIS) | 7.3 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Canton Solar Farm LLC | Dimension Energy LLC | Canton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Barrett Rd New Woodstock, LLC | Dimension Energy LLC | New Woodstock, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Caledonia CSG LLC | Dimension Energy LLC | Caledonia, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Martinsburg CSG LLC | Dimension Energy LLC | Lowville, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Richland North | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Richland South | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Ellisburg | AETS OpCo Holdings LLC | Adams, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Old Route 17 | NY Thompson III, LLC | Harris, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Mar 2025 | Dec 2025 | Solar |
| Eden Dowmont Road | Dowmont Solar, LLC | Argyle, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Feb 2024 | Dec 2025 | Solar |
| Eden Hidden Meadows | Hidden Meadows Solar, LLC | Fort Meadow, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Feb 2024 | Dec 2025 | Solar |
| CES Heuvelton | Heuvelton Solar, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Aug 2024 | Dec 2025 | Solar |
| GSPP 409 Ferris Road | Green Street Power Partners | Lawrence, NY | ISO New England (ISNE) | 7.7 GWh | Nov 2024 | Dec 2025 | Solar |
| GSPP 641 Ferris Road West | Green Street Power Partners | Lawrence, NY | ISO New England (ISNE) | 4.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Randall Road Solar I | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 5.2 GWh | Jun 2024 | Dec 2025 | Solar |
| Randall Road Solar II | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 3.0 GWh | Jun 2024 | Dec 2025 | Solar |
| Swaggertown Solar I | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 3.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Belair | CVE US EI7 Belair LLC | Troy, NY | New York Independent System Operator (NYIS) | 6.2 GWh | May 2024 | Dec 2025 | Solar |
| Kilmer | Kilmer Solar LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius East | CVE US EI5 Manlius East LLC | Manlius, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius North | CVE US EI4 Manlius North LLC | Manlius, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius West | CVE US EI5 Manlius West LLC | Manlius, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Mantisi | Mantisi Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Feb 2024 | Dec 2025 | Solar |
| Quaker | CVE US EI8 Quaker LLC | Queensbury, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Rak 1 | Rak 1 Solar LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Nov 2023 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Franklin County, NY | # 28 | 17 | 421.3 GWh |
| Westchester County, NY | # 27 | 32 | 437.8 GWh |
| Bronx County, NY | # 26 | 15 | 456.6 GWh |
| Monroe County, NY | # 25 | 42 | 586.4 GWh |
| Onondaga County, NY | # 24 | 46 | 622.8 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 863.4 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 28 | 1.6 TWh |
| Saratoga County, NY | # 17 | 43 | 1.7 TWh |
| Richmond County, NY | # 16 | 19 | 1.8 TWh |
| Rockland County, NY | # 15 | 10 | 2.1 TWh |
| Nassau County, NY | # 14 | 24 | 2.4 TWh |
| Kings County, NY | # 13 | 31 | 2.6 TWh |
| New York County, NY | # 12 | 19 | 2.6 TWh |
| Greene County, NY | # 11 | 14 | 2.6 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.1 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.7 TWh |
| Dutchess County, NY | # 6 | 22 | 6.6 TWh |
| St. Lawrence County, NY | # 5 | 69 | 7.8 TWh |
| Suffolk County, NY | # 4 | 69 | 9.3 TWh |
| Queens County, NY | # 3 | 23 | 13.9 TWh |
| Niagara County, NY | # 2 | 26 | 15.0 TWh |
| Oswego County, NY | # 1 | 36 | 30.2 TWh |