Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Avon Solar Farm LLC | Avon Solar Farm LLC | Avon, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Aug 2021 | Dec 2024 | Solar |
| Sweden 1 | Helios Energy New York 3 LLC | Sweden, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2021 | Dec 2024 | Solar |
| Hamlin 1 | Helios Energy New York 2 LLC | Hamlin, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2021 | Dec 2024 | Solar |
| NY Ridgeway I CSG | DG Empire Shine, LLC | Lyndonville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2023 | Dec 2024 | Solar |
| Broadway CDG Solar LLC | Broadway CDG Solar LLC | Depew, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Source Power NY III - Remsen | Distributed Solar Development, LLC | Remsen, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2023 | Dec 2024 | Solar |
| The Source at White Plains (UBS) | Distributed Solar Development, LLC | White Plains, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Mar 2022 | Dec 2024 | Solar |
| White Plains_RFP-Gedney Way Landfill | Distributed Solar Development, LLC | White Plains, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Mar 2022 | Dec 2024 | Solar |
| FFP - NY Urbanski | FFP NY Goshen Project1, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Mar 2024 | Dec 2024 | Solar : 99.9% |
| FFP - NY Varano | FFP NY Goshen Project2, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Mar 2024 | Dec 2024 | Solar |
| EDF - Liberty NY - Real Term CSG | ESNY-RT-ELMSFORD, LLC | Elmsford, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Jul 2023 | Dec 2024 | Solar |
| Source Power NY II - Locust 1 | Locust Solar LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2023 | Dec 2024 | Solar |
| Sheesley (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tiffany | Nautilus Solar Solutions | Norwich, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Nov 2022 | Dec 2024 | Solar |
| Smith Creek | LSE Pisces LLC | Nichols, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Mar 2021 | Dec 2024 | Solar |
| Altamont (NY) (CSG) | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 12.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Comfort CSG | Nautilus Solar Solutions | Grand Island, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Aug 2024 | Dec 2024 | Solar |
| Clemons Road Solar | RPNY Solar 4, LLC | Minoa, NY | ISO New England (ISNE) | 1.0 GWh | Jun 2024 | Dec 2024 | Solar |
| Pike Road Solar (NY) | RPNY Solar 6, LLC | Batavia, NY | ISO New England (ISNE) | 1.5 GWh | Jun 2024 | Dec 2024 | Solar |
| Alexander Road Solar | RPNY Solar 7, LLC | Batavia, NY | ISO New England (ISNE) | 943.0 MWh | Jun 2024 | Dec 2024 | Solar |
| Princetown Solar 1 | AES Clean Energy | Duanesburg, NY | New York Independent System Operator (NYIS) | 221.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Wolcott Hill (Camden) (CSG) | Nautilus Solar Solutions | Camden, NY | New York Independent System Operator (NYIS) | 35.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Peterboro (CSG) | Nautilus Solar Solutions | Vernon, NY | New York Independent System Operator (NYIS) | 2.7 GWh | May 2024 | Dec 2024 | Solar |
| 700 Binnewater | Madison Energy Investments LLC | Rosendale, NY | ISO New England (ISNE) | 1.6 GWh | Aug 2022 | Dec 2024 | Solar |
| GSPP 7024 Fox Rd, LLC | Green Street Power Partners | Marcy, NY | ISO New England (ISNE) | 7.6 GWh | Apr 2023 | Dec 2024 | Solar |
| GSPP 4643 Twelve Corners Road, LLC | Green Street Power Partners | Auburn, NY | ISO New England (ISNE) | 8.0 GWh | May 2023 | Dec 2024 | Solar |
| GSPP 126 Little Bow Rd N, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 3.2 GWh | Nov 2023 | Dec 2024 | Solar |
| GSPP 126 Little Bow Rd S, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 4.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Saratoga Solar III, LLC | Green Street Power Partners | Middle Grove, NY | ISO New England (ISNE) | 5.7 GWh | Nov 2023 | Dec 2024 | Solar |
| Saratoga Solar IV, LLC | Green Street Power Partners | Rock City Falls, NY | ISO New England (ISNE) | 4.2 GWh | Sep 2023 | Dec 2024 | Solar |
| Portland SP | Solar Planet Power | BROCTON, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Dec 2022 | Dec 2024 | Solar |
| NY Lower Road II CSG | Lower Road II, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| NY Lower Road III CSG | Lower Road III, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2023 | Dec 2024 | Solar |
| State Route 5 | AETS OpCo Holdings LLC | Vernon, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2023 | Dec 2024 | Solar |
| Sunnyside 2 Solar | Solar DG NY Sunnyside 2, LLC | Scotia, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Feb 2023 | Dec 2024 | Solar |
| Ny Frankfort Bleecker St - Frankfort -NG | Frankfort Solar Farm LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 2.3 GWh | May 2024 | Dec 2024 | Solar |
| NSF Aurelius Site 1 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 4.5 GWh | May 2024 | Dec 2024 | Solar |
| NSF Aurelius Site 2, LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 4.0 GWh | May 2024 | Dec 2024 | Solar |
| NSF Aurelius Site 3 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 5.5 GWh | May 2024 | Dec 2024 | Solar |
| NSF Aurelius Site 4 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 5.2 GWh | May 2024 | Dec 2024 | Solar |
| NSF Torrey Site 3 | NSF Torrey Site 3, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
| NSF Torrey Site 2 | NSF Torrey Site 2, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
| NSF Torrey Site 1 | NSF Torrey Site 1, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
| Glen Mary 1 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Glen Mary 2 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Barone | Generate Capital | Wurtsboro, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Krumkill Road Solar North, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jul 2024 | Dec 2024 | Solar |
| Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2024 | Dec 2024 | Solar |
| Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Eddy | Generate Capital | Williamson, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Sep 2023 | Dec 2024 | Solar |
| Janiak | Generate Capital | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Oct 2023 | Dec 2024 | Solar |
| Ridgeway 1 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Oct 2023 | Dec 2024 | Solar |
| Rivard 2 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
| County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Apr 2024 | Dec 2024 | Solar |
| Acer | Cypress Creek Renewables | Madrid, NY | New York Independent System Operator (NYIS) | 68.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Buck Run | Cypress Creek Renewables | Clarkson, NY | New York Independent System Operator (NYIS) | 114.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Grass River | Cypress Creek Renewables | Canton, NY | New York Independent System Operator (NYIS) | 1.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Meltwater | Cypress Creek Renewables | Manlius, NY | New York Independent System Operator (NYIS) | 7.0 MWh | Nov 2024 | Dec 2024 | Solar |
| White Plains RFP Shapham Place | Shapham Place Solar Project 2020 LLC | White Plains, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Apr 2022 | Dec 2024 | Solar |
| Richmond (NY) | Solar Planet Power | Honeoye, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Dec 2022 | Dec 2024 | Solar |
| Catskill Solar | Catskill View Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Jan 2023 | Dec 2024 | Solar |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 895.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Bodhi Solar | Bodhi Solar, LLC | Wheatfield, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2024 | Dec 2024 | Solar |
| Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 238.0 MWh | Jun 2024 | Dec 2024 | Solar |
| Niagara Solar Project | DG Niagara, LLC | Randomville, NY | New York Independent System Operator (NYIS) | 701.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 26.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 371.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Ticon Solar | Ticon Solar, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 198.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Guilderland Solar | Helios Energy New York 13 LLC | Altamont, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2023 | Dec 2024 | Solar |
| Enfield Solar Site 2 | NSF Enfield Site 2, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 90.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Enfield Solar Site 3 | NSF Enfield Site 3, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 287.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Enfield Solar Site 1 | NSF Enfield Site 1, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 309.0 MWh | Oct 2024 | Dec 2024 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.0 GWh | Sep 2024 | Dec 2024 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Sep 2024 | Dec 2024 | Solar |
| Warrior Solar Partners | Warrior Solar Partners, LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Jul 2023 | Dec 2024 | Solar |
| Martinsburg CSG LLC | Dimension Energy LLC | Lowville, NY | New York Independent System Operator (NYIS) | 39.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Eden Dowmont Road | Dowmont Solar, LLC | Argyle, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Feb 2024 | Dec 2024 | Solar |
| Eden Hidden Meadows | Hidden Meadows Solar, LLC | Fort Meadow, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Feb 2024 | Dec 2024 | Solar |
| CES Heuvelton | Heuvelton Solar, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Aug 2024 | Dec 2024 | Solar |
| Randall Road Solar I | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 2.0 GWh | Jun 2024 | Dec 2024 | Solar |
| Randall Road Solar II | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 1.2 GWh | Jun 2024 | Dec 2024 | Solar |
| Swaggertown Solar I | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 122.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Belair | CVE US EI7 Belair LLC | Troy, NY | New York Independent System Operator (NYIS) | 5.5 GWh | May 2024 | Dec 2024 | Solar |
| Kilmer | Kilmer Solar LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Sep 2024 | Dec 2024 | Solar |
| Manlius East | CVE US EI5 Manlius East LLC | Manlius, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Sep 2024 | Dec 2024 | Solar |
| Manlius North | CVE US EI4 Manlius North LLC | Manlius, NY | New York Independent System Operator (NYIS) | 317.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Manlius West | CVE US EI5 Manlius West LLC | Manlius, NY | New York Independent System Operator (NYIS) | 848.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Mantisi | Mantisi Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Feb 2024 | Dec 2024 | Solar |
| Quaker | CVE US EI8 Quaker LLC | Queensbury, NY | New York Independent System Operator (NYIS) | 125.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Rak 1 | Rak 1 Solar LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Wheatfield | CVE US EI3 Wheatfield LLC | Sanborn, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Wolf | Wolf Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 5.7 GWh | Jan 2024 | Dec 2024 | Solar |
| Swaggertown Solar II | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 1.3 GWh | Aug 2024 | Dec 2024 | Solar |
| Manilus | Solar Planet Power | Manilus, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2023 | Dec 2024 | Solar |
| North Troy | Onyx Asset Services Group | Troy, NY | New York Independent System Operator (NYIS) | 507.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Rak 2 | Rak 2 Solar LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Rivard 1 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Ridgeway 2 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Nov 2023 | Dec 2024 | Solar |
| Catskill | Generate Capital | Triangle, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2023 | Dec 2024 | Solar |
| Pivot Solar NY 1 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 7.5 GWh | Feb 2024 | Dec 2024 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2024 generation numbers.| County | State Rank | Active Plants | Dec 2024 Generation |
|---|---|---|---|
| Westchester County, NY | # 29 | 31 | 428.7 GWh |
| Bronx County, NY | # 28 | 15 | 438.8 GWh |
| Franklin County, NY | # 27 | 15 | 459.9 GWh |
| Onondaga County, NY | # 26 | 37 | 480.9 GWh |
| Jefferson County, NY | # 25 | 38 | 505.3 GWh |
| Monroe County, NY | # 24 | 41 | 580.6 GWh |
| Yates County, NY | # 23 | 6 | 713.2 GWh |
| Chautauqua County, NY | # 22 | 27 | 873.3 GWh |
| Wyoming County, NY | # 21 | 15 | 906.5 GWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 28 | 1.5 TWh |
| Lewis County, NY | # 18 | 28 | 1.8 TWh |
| Rockland County, NY | # 17 | 10 | 2.0 TWh |
| Saratoga County, NY | # 16 | 37 | 2.0 TWh |
| Kings County, NY | # 15 | 31 | 2.2 TWh |
| Richmond County, NY | # 14 | 19 | 2.3 TWh |
| New York County, NY | # 13 | 18 | 2.5 TWh |
| Nassau County, NY | # 12 | 24 | 2.6 TWh |
| Rensselaer County, NY | # 11 | 22 | 3.1 TWh |
| Greene County, NY | # 10 | 13 | 3.4 TWh |
| Albany County, NY | # 9 | 30 | 4.0 TWh |
| Dutchess County, NY | # 8 | 21 | 4.1 TWh |
| Wayne County, NY | # 7 | 12 | 4.8 TWh |
| Orange County, NY | # 6 | 53 | 5.6 TWh |
| St. Lawrence County, NY | # 5 | 69 | 8.0 TWh |
| Suffolk County, NY | # 4 | 67 | 8.8 TWh |
| Queens County, NY | # 3 | 22 | 14.0 TWh |
| Niagara County, NY | # 2 | 26 | 15.0 TWh |
| Oswego County, NY | # 1 | 33 | 29.8 TWh |