Directory of Power Plants in Minnesota
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Carstensen Wind | Carstensen Wind, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2004 | Dec 2024 | Wind |
Skalbeck Solar | Cascade Solar LLC | Sacred Heart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
Centaurus Community Solar | Centaurus Community Solar | Maynard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 2017 | Dec 2024 | Solar |
CG Windfarm LLC | CG Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 144.0 MWh | Nov 2003 | Dec 2024 | Wind |
Florence Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Hadley Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
Hope Creek LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Ruthton Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Soliloquoy Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Spartan Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Twin Lake Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
Winters Spawn LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
Autumn Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Jack River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Jessica Mills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Julia Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Sun River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Tsar Nicholas LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Agassiz Beach LLC | CHI Operations Inc | Averill, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2001 | Dec 2024 | Wind |
Chisago Community Solar | Chisago Community Solar | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2016 | Dec 2024 | Solar |
Chisago Holdco LLC, CSG | Chisago Holdco LLC | Center City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Apr 2019 | Dec 2024 | Solar |
Chub Garden Solar | Chub Garden LLC | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2024 | Solar |
Alexandria | City of Alexandria - (MN) | Alexandria, MN | Midcontinent Independent System Operator, Inc. (MISO) | 43.0 MWh | Dec 1947 | Dec 2024 | Distillate Fuel Oil |
Benson City of | City of Benson - (MN) | Benson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.0 MWh | Apr 2002 | Dec 2024 | Distillate Fuel Oil |
Blooming Prairie | City of Blooming Prairie - (MN) | Blooming Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 234.0 MWh | Apr 1937 | Dec 2024 | Distillate Fuel Oil |
Detroit Lakes | City of Detroit Lakes - (MN) | Detroit Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Jun 1968 | Dec 2024 | Distillate Fuel Oil |
Elk River City of | City of Elk River | Elk River, MN | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | Feb 1948 | Dec 2023 | Distillate Fuel Oil |
Fairfax | City of Fairfax - (MN) | Fairfax, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Jul 2001 | Dec 2024 | Distillate Fuel Oil |
Grand Marais | City of Grand Marais - (MN) | Grand Marais, MN | Midcontinent Independent System Operator, Inc. (MISO) | 204.0 MWh | Jan 2004 | Dec 2024 | Distillate Fuel Oil |
Granite Falls | City of Granite Falls - (MN) | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jul 1932 | Dec 2024 | Water |
Halstad | City of Halstad - (MN) | Halstad, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.0 MWh | Aug 2007 | Dec 2024 | Distillate Fuel Oil |
Janesville | City of Janesville - (MN) | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.0 MWh | Apr 1955 | Dec 2024 | Distillate Fuel Oil : 97.0% Natural Gas : 3.0% |
Lake Crystal | City of Lake Crystal - (MN) | Lake Crystal, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.0 MWh | Apr 1952 | Dec 2024 | Distillate Fuel Oil |
Lakefield Utilities | City of Lakefield - (MN) | Lakefield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Jan 1985 | Dec 2024 | Distillate Fuel Oil |
Luverne | City of Luverne - (MN) | Luverne, MN | Southwest Power Pool (SWPP) | 165.0 MWh | Apr 1967 | Dec 2024 | Distillate Fuel Oil |
Marshall (MN) | City of Marshall - (MN) | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 59.8 MWh | Jun 1969 | Dec 2024 | Distillate Fuel Oil |
Moorhead Wind Turbine | City of Moorhead - (MN) | Moorhead, MN | Southwest Power Pool (SWPP) | 1.2 GWh | Apr 1999 | Dec 2024 | Wind |
Mountain Lake | City of Mountain Lake - (MN) | Mountain Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 1954 | Dec 2024 | Wind : 97.7% Natural Gas : 1.8% |
Owatonna | City of Owatonna - (MN) | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Mar 1982 | Dec 2023 | Natural Gas |
Water Reclamation Plant | City of Rochester | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Feb 2003 | Dec 2024 | Other Biomass Gas |
St. Charles Power Plant | City of St Charles - (MN) | St. Charles, MN | Midcontinent Independent System Operator, Inc. (MISO) | 71.0 MWh | Nov 2004 | Dec 2024 | Distillate Fuel Oil |
St James | City of St James - (MN) | St James, MN | Midcontinent Independent System Operator, Inc. (MISO) | 36.0 MWh | Jun 2002 | Dec 2024 | Distillate Fuel Oil |
Thief River Falls | City of Thief River Falls | Thief River Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 285.0 MWh | Jul 1927 | Dec 2024 | Water : 96.1% Distillate Fuel Oil : 3.9% |
Truman | City of Truman | Truman, MN | Midcontinent Independent System Operator, Inc. (MISO) | 39.0 MWh | Aug 1938 | Dec 2024 | Distillate Fuel Oil |
Wells IC | City of Wells - (MN) | Wells, MN | Midcontinent Independent System Operator, Inc. (MISO) | 180.0 MWh | Oct 1950 | Dec 2024 | Natural Gas : 64.3% Distillate Fuel Oil : 35.7% |
Westbrook | City of Westbrook | Westbrook, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Sep 2003 | Dec 2024 | Distillate Fuel Oil |
Windom | City of Windom | Windom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 MWh | May 1980 | Dec 2024 | Distillate Fuel Oil |
Worthington | City of Worthington - (MN) | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Jan 2002 | Dec 2024 | Wind : 98.9% Distillate Fuel Oil : 1.1% |
Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
Clara City Solar | Clara City Solar LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2019 | Dec 2024 | Solar |
Clear Garden CSG | Clear Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2024 | Solar |
Cokato CSG | Cokato Holdco LLC | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Jul 2021 | Dec 2023 | Solar |
Minwind | Community Renewables, LLC | Luverne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 276.0 MWh | Sep 2002 | Dec 2024 | Wind |
Valley View Transmission LLC | Consolidated Edison Development Inc. | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Jun 2011 | Dec 2024 | Wind |
Adams Wind Farm | Consolidated Edison Development Inc. | Adams, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.2 GWh | Aug 2003 | Dec 2024 | Wind |
Red Lake Falls Community Hybrid | Consolidated Edison Development Inc. | Red Lake Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 GWh | Nov 2020 | Dec 2024 | Wind : 95.1% Solar : 4.9% |
Woodstock Windfarm | Consolidated Edison Development Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 28.5 GWh | Apr 1999 | Dec 2024 | Wind |
Cornillie 2 Community (CSG) | Cornillie 2 Community Solar LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
Corvus Community Solar | Corvus Community Solar | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Sep 2018 | Dec 2024 | Solar |
LSP-Cottage Grove LP | Cottage Grove Operating Services LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Sep 1997 | Dec 2024 | Natural Gas |
Covanta Hennepin Energy | Covanta Energy Co | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 213.7 GWh | Sep 1989 | Mar 2025 | Non-biogenic Municipal Solid Waste : 54.7% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.6% |
Crane Garden | Crane Garden LLC | Lester Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2023 | Dec 2024 | Solar |
Crater Community Solar | Crater Community Solar | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
CF Novel Solar CSG Gardens Eleven, LLC | Cypress Creek Renewables | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2017 | Dec 2024 | Solar |
CF Novel Solar CSG Gardens Two, LLC | Cypress Creek Renewables | Minnesota Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2017 | Dec 2024 | Solar |
Empire Solar | Cypress Creek Renewables | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2016 | Dec 2024 | Solar |
PopeSun CSG, LLC | Cypress Creek Renewables | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
Blue Lake Solar | Cypress Creek Renewables | Shakopee, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2016 | Dec 2024 | Solar |
CF Novel Solar CSG Gardens Seven, LLC | Cypress Creek Renewables | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
WrightSun CSG, LLC | Cypress Creek Renewables | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Dec 2017 | Dec 2024 | Solar |
CGSun, LLC Community Solar | Cypress Creek Renewables | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2017 | Dec 2024 | Solar |
LeSun CSG, LLC | Cypress Creek Renewables | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Dec 2017 | Dec 2024 | Solar |
CF Novel Solar CSG Gardens Five, LLC | Cypress Creek Renewables | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Nov 2017 | Dec 2024 | Solar |
Delano | Delano Municipal Utilities | Delano, MN | Midcontinent Independent System Operator, Inc. (MISO) | 51.9 MWh | Sep 1946 | Dec 2024 | Distillate Fuel Oil |
Delphinus Community Solar | Delphinus Community Solar | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2018 | Dec 2024 | Solar |
Hormel CSG Solar | DG Central 1, LLC | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
Grand Casino Hinckley Solar | DG Central 1, LLC | Hinckley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Apr 2022 | Dec 2024 | Solar |
Cottage Grove Project CSG | DG Minnesota CSG, LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Sep 2018 | Dec 2024 | Solar |
Scandia CSG | DG Minnesota CSG, LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Dec 2017 | Dec 2024 | Solar |
Haven Solar Project CSG | DG Minnesota CSG, LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jun 2019 | Dec 2024 | Solar |
Hammer CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2024 | Solar |
Monticello Project CSG | DG Minnesota CSG, LLC | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Oct 2018 | Dec 2024 | Solar |
Tiller CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
Held Solar Project | DG Minnesota CSG, LLC | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Feb 2019 | Dec 2024 | Solar |
Schultz CSG | DG Minnesota CSG, LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Oct 2018 | Dec 2024 | Solar |
Big Lake Project CSG | DG Minnesota CSG, LLC | Big Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | May 2018 | Dec 2024 | Solar |
Dodge Holdco Solar CSG | Dodge Holdco LLC | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Jun 2017 | Dec 2023 | Solar |
Dodge Renewables 1 | Dodge Renewables 1, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2022 | Dec 2024 | Solar |
Dodge Renewables 2 | Dodge Renewables 2, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Aug 2022 | Dec 2024 | Solar |
DSI Don Solar | DSI Don Solar LLC | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 579.0 MWh | Jun 2024 | Dec 2024 | Solar |
E. Goenner Project CSG | E. Goenner Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2019 | Dec 2024 | Solar |
Sartell Dam | Eagle Creek Renewable Energy, LLC | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 29.1 GWh | Feb 1985 | Dec 2024 | Water |
Eastridge Wind Project | Eastridge Wind Project | Porter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Mar 2006 | Dec 2024 | Wind |
SunE Feely 1 CSG, LLC | Ecoplexus, Inc | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Aug 2018 | Dec 2024 | Solar |
Fox CSG, LLC | Ecoplexus, Inc | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Feb 2018 | Dec 2024 | Solar |
Wyoming 2 CSG, LLC | Ecoplexus, Inc | Wyoming, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Feb 2018 | Dec 2024 | Solar |
Cottage Grove CSG, LLC | Ecoplexus, Inc | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Feb 2018 | Dec 2024 | Solar |
Randolph CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | May 2019 | Dec 2024 | Solar |
Felton CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | May 2019 | Dec 2024 | Solar |
SunE Stolee CSG, LLC | Ecoplexus, Inc | Kenyon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Feb 2018 | Dec 2024 | Solar |