Wagon Trail LLC
28821 Madison Road, Echo, OR 97826Plant Summary Information
Wagon Trail LLC is ranked #47 out of 50 wind farms in Oregon in terms of total annual net electricity generation.
Wagon Trail LLC generated 1.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wagon Trail LLC |
|---|---|
| Utility Name | CR51 Inc. |
| Location | Morrow County, OR |
| Initial Operation Date | June 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 5.9 GWh |
| Annual Consumption | 21.2 k MMBtu |
| Ranked #7,896 out of 13,081 Power Plants Nationwide | |
| Ranked #1,210 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #179 out of 275 Oregon Power Plants | |
| Ranked #47 out of 50 Oregon Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Echo 3 (2013 to 2021) Odessa Energy Services LLC (2022 to 2024) CR51 Inc. (2025 to 2025) |
Map of Wagon Trail LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wagon Trail LLC.
Monthly Net Generation for Wagon Trail LLC
Monthly Plant Fuel Consumption for Wagon Trail LLC
Wagon Trail LLC Details
| Summary Information | |
|---|---|
| Plant Name | Wagon Trail LLC (56974) |
| Plant Address | 28821 Madison Road, Echo, OR 97826 |
| Utility | CR51 Inc. (67701) |
| Latitude, Longitude | 45.6531, -119.4625 |
| Generation Dates on File | Jun 2009 to Dec 2025 |
| Initial Operation Date | June 2009 |
| Annual Generation | 5.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 08-537-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - West (PACW) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (1738) OR |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating June 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HINKLE_NODET |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HINKLE_NODET |
| Nameplate Capacity | 3.3 MW |
| Summer Capacity | 3.3 MW |
| Winter Capacity | 3.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 2 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 2 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 14 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Wagon Trail LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Wagon Trail, LLC | 77252 Mader-Rust Lane, Echo, OR 97826 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1200 | Seward Wind Farm | Seward, NE | 6.3 GWh |
| #1201 | Tri-Tip Wind (9) LLC | Sunray, TX | 6.3 GWh |
| #1202 | Cape Cod Air Force Station - 6 SWS | Sagamore, MA | 6.2 GWh |
| #1203 | August Wind Farm | Clearfield, IA | 6.2 GWh |
| #1204 | Windshare LLC | Chandler, MN | 6.0 GWh |
| #1205 | WED Green Hill, LLC | Johnston, RI | 6.0 GWh |
| #1206 | Green Energy Machine | Anita, IA | 6.0 GWh |
| #1207 | Ribeye Wind (11) LLC | Dumas, TX | 5.9 GWh |
| #1208 | Geneseo | Geneseo, IL | 7.8 GWh |
| #1209 | Brisket Wind (8) LLC | Sunray, TX | 5.9 GWh |
| #1211 | Foundation Mann Packing | Gonzales, CA | 5.8 GWh |
| #1212 | Foundation California Training Facility | Soledad, CA | 5.7 GWh |
| #1213 | K-Brink Windfarm LLC | Woodstock, MN | 5.7 GWh |
| #1214 | Whirlpool Corporation - Marion Wind Farm | Marion, OH | 5.7 GWh |
| #1215 | LafargeHolcim - Paulding Wind Project | Paulding, OH | 5.7 GWh |
| #1216 | Traer Wind Project | Traer, IA | 5.6 GWh |
| #1217 | Springfield Wind | Springfield, CO | 5.4 GWh |
| #1218 | Lime Wind | Huntington, OR | 5.4 GWh |
| #1219 | T-Bone Wind (10) LLC | Dumas, TX | 5.3 GWh |
| #1220 | Marshall Wind 2 LLC | Marshall, MN | 5.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wagon Trail LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Top LLC | Echo, OR | 3.4 GWh | 0.2 mi |
| Butter Creek Power LLC | Echo, OR | 9.7 GWh | 3.9 mi |
| Carty Generating Station | Boardman, OR | 3.3 TWh | 17.2 mi |
| Coyote Springs | Boardman, OR | 2.0 TWh | 16.9 mi |
| Coyote Springs II | Boardman, OR | 2.0 TWh | 16.9 mi |
| Finley Buttes Landfill Gas | Boardman, OR | 13.0 GWh | 7.6 mi |
| Four Corners Windfarm LLC | Echo, OR | 19.5 GWh | 5.6 mi |
| Four Mile Canyon Windfarm LLC | Echo, OR | 20.4 GWh | 0.7 mi |
| Hermiston Generating Plant | Hermiston, OR | 3.0 TWh | 11.4 mi |
| Hermiston Power Partnership | Hermiston, OR | 3.5 TWh | 12.1 mi |
| NorWest Energy 9 LLC | Pendleton, OR | 12.2 GWh | 19.1 mi |
| Orchard Windfarm 1, LLC | Lexington, OR | 18.6 GWh | 19.9 mi |
| Orchard Windfarm 4, LLC | Lexington, OR | 17.3 GWh | 19.9 mi |
| Oregon Trail Windfarm LLC | Echo, OR | 22.3 GWh | 5 mi |
| Pacific Canyon Windfarm LLC | Echo, OR | 16.8 GWh | 1.2 mi |
| Sand Ranch Windfarm LLC | Echo, OR | 18.9 GWh | 0.9 mi |
| Ward Butte Windfarm LLC | Echo, OR | 14.9 GWh | 3.9 mi |
| Wheatridge 1 | Lexington, OR | 243.0 GWh | 10.5 mi |
| Wheatridge East Wind | Lexington, OR | 511.1 GWh | 8.6 mi |
| Wheatridge Hybrid | Morrow, OR | 655.7 GWh | 10.5 mi |