WED Green Hill, LLC
26 Green Hill Road, Johnston, RI 2919Plant Summary Information
WED Green Hill, LLC is ranked #38 out of 96 power plants in Rhode Island in terms of total annual net electricity generation.
WED Green Hill, LLC generated 2.3 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | WED Green Hill, LLC |
---|---|
Utility Name | WED Green Hill, LLC |
Location | Providence County, RI |
Initial Operation Date | January 2019 |
Last Update | Mar 2025 |
Annual Generation | 6.6 GWh |
Annual Consumption | 25.1 k MMBtu |
Ranked #7,282 out of 12,288 Power Plants Nationwide | |
Ranked #1,178 out of 1,353 Wind Power Plants Nationwide | |
Ranked #38 out of 96 Rhode Island Power Plants | |
Ranked #6 out of 19 Rhode Island Wind Power Plants | |
Fuel Types | Wind |
Map of WED Green Hill, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for WED Green Hill, LLC.
Monthly Net Generation for WED Green Hill, LLC
WED Green Hill, LLC Details
Summary Information | |
---|---|
Plant Name | WED Green Hill, LLC (62106) |
Plant Address | 26 Green Hill Road, Johnston, RI 2919 |
Utility | WED Green Hill, LLC (61648) |
Latitude, Longitude | 41.79785, -71.52974 |
Generation Dates on File | Jan 2019 to Mar 2025 |
Initial Operation Date | January 2019 |
Annual Generation | 6.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-88-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | The Narragansett Electric Co (13214) RI |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator GHILL Details Operating January 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | VENSYS |
Predominant Turbine Model Number | VENSYS120 |
Design Wind Speed | 12.3 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 295.3 |
WED Green Hill, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1168 | Com Adam 1WF-1 | Sublette, IL | 7.2 GWh |
#1169 | Martin Marietta Wind Project | Woodville, OH | 7.2 GWh |
#1170 | Birch | Clearfield, IA | 6.9 GWh |
#1171 | Shane's Wind Machine | Ruthton, MN | 6.8 GWh |
#1172 | WED Shun I, LLC | Johnston, RI | 6.7 GWh |
#1173 | Green Energy Machine | Anita, IA | 6.7 GWh |
#1174 | Zephyr Wind | Findlay, OH | 6.7 GWh |
#1175 | Lincoln Heights II | Lake Benton, MN | 6.6 GWh |
#1176 | WED Shun III, LLC | Johnston, RI | 6.6 GWh |
#1177 | CCC Hastings Wind Turbine | Hastings, NE | 6.6 GWh |
#1179 | Loess Hills | Rock Port, MO | 6.6 GWh |
#1180 | Waverly Community Wind Project | Waverly, IA | 6.5 GWh |
#1181 | GL Wind | Lewiston, MN | 6.5 GWh |
#1182 | August Wind Farm | Clearfield, IA | 6.5 GWh |
#1183 | WED Shun II, LLC | Johnston, RI | 6.5 GWh |
#1184 | NBC Field's Point Wind Farm | Providence, RI | 6.4 GWh |
#1185 | Marshall Wind 2 LLC | Marshall, MN | 6.4 GWh |
#1186 | Whirlpool Corp-Greenville Wind Farm | Greenville, OH | 6.4 GWh |
#1187 | Geneseo | Geneseo, IL | 7.9 GWh |
#1188 | Tri-Tip Wind (9) LLC | Sunray, TX | 6.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding WED Green Hill, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A Street 1 | Johnston, RI | 1.9 GWh | 0.9 mi |
A Street 2 | Johnston, RI | 2.8 GWh | 0.8 mi |
Central Power Plant | Cranston, RI | 19.2 GWh | 5.2 mi |
GD Johnson Scituate I, LLC | Cranston, RI | 5.7 GWh | 1.4 mi |
Gold Meadow Farms | Cranston, RI | 28.0 GWh | 4.4 mi |
Hope Farm Solar, LLC | Cranston, RI | 16.0 GWh | 3.5 mi |
ISM Solar Cranston CSG | Cranston, RI | 4.1 GWh | 5.5 mi |
Johnston LFG Turbine Plant | Johnston, RI | 187.3 GWh | 0.5 mi |
Johnston Solar | Town of Johnston, RI | 1.7 GWh | 1.5 mi |
Little Bay | Providence, RI | 1.6 GWh | 4.8 mi |
Pine Hill | Johnston, RI | 7.8 GWh | 2.3 mi |
Plainfield Pike | Johnston, RI | 3.7 GWh | 1.3 mi |
Rhode Island State Energy Center | Johnston, RI | 3.4 TWh | 0.6 mi |
Ridgewood Providence Power | Johnston, RI | 1.5 GWh | 0.6 mi |
WED Plainfield II, LLC | Johnston, RI | 5.9 GWh | 0.6 mi |
WED Plainfield III, LLC | Johnston, RI | 6.1 GWh | 0.3 mi |
WED Plainfield, LLC | Johnston, RI | 6.0 GWh | 0.3 mi |
WED Shun I, LLC | Johnston, RI | 6.7 GWh | 0.6 mi |
WED Shun II, LLC | Johnston, RI | 6.5 GWh | 0.4 mi |
WED Shun III, LLC | Johnston, RI | 6.6 GWh | 1 mi |