Tuolumne Wind Project
S-14 and Hwy 97, Goldendale, WA 98620Plant Summary Information
Tuolumne Wind Project is ranked #44 out of 131 power plants in Washington in terms of total annual net electricity generation.
Tuolumne Wind Project generated 75.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Tuolumne Wind Project |
---|---|
Utility Name | Turlock Irrigation District |
Location | Klickitat County, WA |
Initial Operation Date | May 2009 |
Last Update | Dec 2024 |
Annual Generation | 399.7 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,540 out of 12,288 Power Plants Nationwide | |
Ranked #449 out of 1,353 Wind Power Plants Nationwide | |
Ranked #44 out of 131 Washington Power Plants | |
Ranked #11 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Tuolumne Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tuolumne Wind Project.
Monthly Net Generation for Tuolumne Wind Project
Tuolumne Wind Project Details
Summary Information | |
---|---|
Plant Name | Tuolumne Wind Project (56702) |
Plant Address | S-14 and Hwy 97, Goldendale, WA 98620 |
Utility | Turlock Irrigation District (19281) |
Latitude, Longitude | 45.8797, -120.8072 |
Generation Dates on File | Jun 2009 to Dec 2024 |
Initial Operation Date | May 2009 |
Annual Generation | 399.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator WPT1 Details Operating May 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TIDS-MALIN_5_N101-MALIN500 |
Nameplate Capacity | 136.3 MW |
Summer Capacity | 136.3 MW |
Winter Capacity | 136.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 62 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 62 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 16.5 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Tuolumne Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#439 | Camp Grove Wind Farm | Wyoming, IL | 406.4 GWh |
#440 | Hopkins Ridge Wind | Dayton, WA | 405.8 GWh |
#441 | Wildhorse Mountain Wind Facility | Clayton, OK | 403.4 GWh |
#442 | Prairie Rose Wind Farm | Hardwick, MN | 402.5 GWh |
#443 | Panther Creek Wind Farm II | Big Spring, TX | 402.1 GWh |
#444 | Coyote Ridge | White, SD | 402.1 GWh |
#445 | Timber Road IV | Payne, OH | 401.2 GWh |
#446 | Glenrock | Glenrock, WY | 400.8 GWh |
#447 | Pegasus Wind | Reese, MI | 400.2 GWh |
#448 | Seven Mile Hill | Medicine Bow, WY | 399.8 GWh |
#450 | Voyager Wind I | Mojave, CA | 399.1 GWh |
#451 | Willow Creek Wind Power LLC | Newell, SD | 398.9 GWh |
#452 | Vienna Wind Farm | Marshalltown, IA | 397.6 GWh |
#453 | Reloj del Sol Wind Farm | San Ygnacio, TX | 397.3 GWh |
#454 | Tatanka Wind Power LLC | Ashley, ND | 396.6 GWh |
#455 | Boswell Wind | Rock River, WY | 395.5 GWh |
#456 | Roundhouse Renewable Energy II | Granite, WY | 393.1 GWh |
#457 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 393.1 GWh |
#458 | Northern Wind | Lake Wilson, MN | 391.8 GWh |
#459 | Milford Wind Corridor I LLC | Milford, UT | 391.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tuolumne Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Horn Wind II | Bickleton, WA | 108.7 GWh | 24.4 mi |
Big Horn Wind Project | Bickelton, WA | 483.8 GWh | 24.9 mi |
Biglow Canyon Wind Farm | Wasco, OR | 975.0 GWh | 18.4 mi |
Dalles Dam North Fishway Project | The Dalles, OR | 44.3 GWh | 24.3 mi |
Golden Hill Wind | Wasco, OR | 603.5 GWh | 22.4 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 4.9 mi |
Goodnoe Hills | Goldendale, WA | 275.5 GWh | 15.3 mi |
Harvest Wind Project | Roosevelt, WA | 263.7 GWh | 22.6 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh | 27.3 mi |
John Day | Rufus, OR | 7.2 TWh | 12.5 mi |
Klondike Wind Power | Wasco, OR | 17.8 GWh | 25.5 mi |
Klondike Windpower II | Wasco, OR | 245.8 GWh | 23.7 mi |
Klondike Windpower III | Wasco, OR | 711.9 GWh | 25.1 mi |
Linden Wind Energy Project | Goldendale, WA | 96.5 GWh | 9.4 mi |
Lund Hill Solar | Bickleton, WA | 352.8 GWh | 21.8 mi |
PaTu Wind Farm LLC | Wasco, OR | 29.9 GWh | 20.6 mi |
The Dalles | The Dalles, OR | 5.6 TWh | 24.2 mi |
White Creek Wind Farm | Roosevelt, WA | 563.7 GWh | 22.8 mi |
Windy Flats Wind Project | Centerville, WA | 671.6 GWh | 10.6 mi |
WyEast Solar | Wasco, OR | 21.1 GWh | 22.7 mi |