Back River Waste Water Treatment
8201 Eastern Ave, Baltimore, MD 21224Plant Summary Information
Back River Waste Water Treatment is ranked #181 out of 184 solar farms in Maryland in terms of total annual net electricity generation.
Back River Waste Water Treatment generated 172.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Back River Waste Water Treatment |
|---|---|
| Utility Name | Mayor and City Council of Baltimore City - (MD) |
| Location | Baltimore County, MD |
| Initial Operation Date | January 2009 |
| Last Update | Dec 2024 |
| Annual Generation | 594.0 MWh |
| Annual Consumption | 2.2 k MMBtu |
| Ranked #12,188 out of 13,081 Power Plants Nationwide | |
| Ranked #6,833 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #219 out of 226 Maryland Power Plants | |
| Ranked #181 out of 184 Maryland Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
City Council of Baltimore City (2013 to 2018) Mayor and City Council of Baltimore City (2019 to 2024) Mayor and City Council of Baltimore City - (MD) (2025 to 2025) |
Map of Back River Waste Water Treatment
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Back River Waste Water Treatment.
Monthly Net Generation for Back River Waste Water Treatment
Monthly Plant Fuel Consumption for Back River Waste Water Treatment
Back River Waste Water Treatment Details
| Summary Information | |
|---|---|
| Plant Name | Back River Waste Water Treatment (59026) |
| Plant Address | 8201 Eastern Ave, Baltimore, MD 21224 |
| Utility | Mayor and City Council of Baltimore City - (MD) (58870) |
| Latitude, Longitude | 39.29972, -76.49417 |
| Generation Dates on File | Jan 2013 to Dec 2024 |
| Initial Operation Date | January 2009 |
| Annual Generation | 594.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Baltimore Gas & Electric Co (1167) MD |
| Grid Voltage | 32.00 kV |
| Energy Storage | No |
Generator CHP 1 Details Out of Service January 2009
| Technology | Other Waste Biomass |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | January 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Other Biomass Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CHP 2 Details Out of Service January 2009
| Technology | Other Waste Biomass |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | January 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Other Biomass Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator SOLAR Details Operating March 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Back River Waste Water Treatment Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6823 | Lakewood Cheddar School | Lakewood, NJ | 629.0 MWh |
| #6824 | Boyd Soccerplex | Boyds, MD | 627.0 MWh |
| #6825 | 1 Commercial | Sharon, MA | 622.0 MWh |
| #6826 | Highland Park Borough Solar | Highland Park, NJ | 550.0 MWh |
| #6827 | Community Foodbank of NJ | Hillside, NJ | 621.0 MWh |
| #6828 | West Village Solar - Array 2 Community S | Davis, CA | 619.0 MWh |
| #6829 | Denver Braswell PV | Moultrie, GA | 614.0 MWh |
| #6830 | AES Bend Solar II, LLC CSG | Rockford, IL | 609.0 MWh |
| #6831 | TX Houston 7080 Express Lane | Houston, TX | 600.0 MWh |
| #6832 | SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 599.0 MWh |
| #6834 | Bancroft (MN) | Albert Lea, MN | 589.0 MWh |
| #6835 | Mariani Packing Vacaville Solar | Vacaville, CA | 586.0 MWh |
| #6836 | Deer Island Treatment Plant | Winthrop, MA | 33.2 GWh |
| #6837 | Waterloo Solar, LLC | Waterloo, IN | 584.0 MWh |
| #6838 | LaSalle Solar 6 | Ottawa, IL | 582.0 MWh |
| #6839 | Speedway North Bldg 1-sllas701 | Las Vegas, NV | 582.0 MWh |
| #6840 | Jefferson Solar Park | Jefferson, WI | 577.0 MWh |
| #6841 | MN CSG 2019-79 | Granite Falls, MN | 573.0 MWh |
| #6842 | ETS Ewing Solar Facility | Ewing, NJ | 558.0 MWh |
| #6843 | Rush Solar | Rush, NY | 556.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Back River Waste Water Treatment.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon Maryland DCA1 | Sparrows Point, MD | 2.3 GWh | 5.5 mi |
| Brandon Shores | Baltimore, MD | 3.0 TWh | 8.4 mi |
| CCBC Essex | Essex, MD | 1.7 GWh | 3.6 mi |
| CPG - Duke 5300A Holabird | Baltimore, MD | 2.4 GWh | 3.6 mi |
| CPG - Duke 5300B Holabird | Baltimore, MD | 1.9 GWh | 3.7 mi |
| CPG - Duke 5900 Holabird | Baltimore, MD | 2.1 GWh | 3.3 mi |
| CPG - Duke 6000 Holabird | Baltimore, MD | 2.1 GWh | 3.3 mi |
| Domino Sugar Baltimore | Baltimore, MD | 49.4 GWh | 5.7 mi |
| Eastern Landfill Gas LLC | White Marsh, MD | 19.3 GWh | 8.3 mi |
| IGS Solar I - BWI2 | Baltimore, MD | 2.3 GWh | 3.7 mi |
| IGS Solar I - BWI5 | Baltimore, MD | 2.0 GWh | 3.5 mi |
| Kelso Community Solar I | Essex, MD | 747.0 MWh | 1.9 mi |
| Kelso Community Solar II | Essex, MD | 901.0 MWh | 1.9 mi |
| MD BALTIMORE 4851 HOLABIRD AVE | Baltimore, MD | 825.0 MWh | 3.8 mi |
| Philadelphia | Baltimore, MD | 9.3 GWh | 3.7 mi |
| THD Baltimore DC - 5830 Project Tiger | Edgemere, MD | 2.0 GWh | 5.3 mi |
| THD Baltimore DCs - 5829 Project Lion | Edgemere, MD | 6.1 GWh | 5.4 mi |
| Wheelabrator Baltimore Refuse | Baltimore, MD | 313.4 GWh | 7.6 mi |
| White CSG | Baltimore, MD | 2.9 GWh | 6.5 mi |
| White Marsh Mall | Baltimore, MD | 1.0 GWh | 5.5 mi |