Bakeoven Solar
90664 Bakeoven Market Rd, Maupin, OR 97037Plant Summary Information
Bakeoven Solar is ranked #9 out of 130 solar farms in Oregon in terms of total annual net electricity generation.
Bakeoven Solar generated 13.8 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Bakeoven Solar |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Wasco County, OR |
| Initial Operation Date | Not Available |
| Last Update | Feb 2026 |
| Annual Generation | 81.6 GWh |
| Annual Consumption | 278.4 k MMBtu |
| Ranked #3,680 out of 12,637 Power Plants Nationwide | |
| Ranked #914 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #71 out of 274 Oregon Power Plants | |
| Ranked #9 out of 130 Oregon Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Avangrid Renewables LLC (2019 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Bakeoven Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bakeoven Solar.
Monthly Net Generation for Bakeoven Solar
Monthly Plant Fuel Consumption for Bakeoven Solar
Bakeoven Solar Details
| Summary Information | |
|---|---|
| Plant Name | Bakeoven Solar (63507) |
| Plant Address | 90664 Bakeoven Market Rd, Maupin, OR 97037 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 45.13179, -120.88066 |
| Generation Dates on File | Jul 2025 to Feb 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 81.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG22-150-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Avangrid Renewables LLC (AVRN) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Bakeoven Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #904 | Jones Farm Solar | Millington, MD | 85.2 GWh |
| #905 | Alpaugh 50 | Alpaugh, CA | 84.7 GWh |
| #906 | Spectrum Solar PV Power Project | Las Vegas, NV | 84.0 GWh |
| #907 | OCI Alamo Solar I Hybrid | San Antonio, TX | 84.0 GWh |
| #908 | Fox Creek Solar | Louisburg, NC | 83.9 GWh |
| #909 | Moody Air Force Base Solar | Valdosta, GA | 83.9 GWh |
| #910 | Fillmore County Solar Project | Spring Valley, MN | 83.0 GWh |
| #911 | Coldwater River Solar | Coldwater, MI | 82.3 GWh |
| #912 | Eden Solar LLC | Ellerbe, NC | 81.8 GWh |
| #913 | Bronson Solar | Bronson, FL | 81.6 GWh |
| #915 | Swift Air Solar II | Odessa, TX | 81.5 GWh |
| #916 | Edwards Sanborn 1C | Mojave, CA | 81.3 GWh |
| #917 | Sonny Solar LLC | Elberton, GA | 81.3 GWh |
| #918 | RATTS 1 | Petersburg, IN | 80.9 GWh |
| #919 | Bluestone Solar | Chase City, VA | 80.7 GWh |
| #920 | Lost Hills/Blackwell | Lost Hills, CA | 80.6 GWh |
| #921 | Gulf Coast Solar Center II | Navarre, FL | 80.6 GWh |
| #922 | Pavant Solar II LLC | Fillmore, UT | 80.3 GWh |
| #923 | Whitehorn Solar | Gretna, VA | 79.6 GWh |
| #924 | OE_AZ1 | Salome, AZ | 79.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bakeoven Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Solar Center | Madras, OR | 20.1 GWh | 33.7 mi |
| Biglow Canyon Wind Farm | Wasco, OR | 885.7 GWh | 38.5 mi |
| Condon Windpower LLC | Condon, OR | 77.0 GWh | 30.9 mi |
| Dalles Dam North Fishway Project | The Dalles, OR | 44.3 GWh | 35.6 mi |
| Daybreak Solar | Maupin, OR | 337.2 GWh | 0 mi |
| Elbe Solar Center | Madras, OR | 21.8 GWh | 38.9 mi |
| Golden Hill Wind | Wasco, OR | 599.2 GWh | 30.9 mi |
| Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh | 30.7 mi |
| John Day | Rufus, OR | 8.2 TWh | 41.4 mi |
| Klondike Wind Power | Wasco, OR | 17.8 GWh | 33.4 mi |
| Klondike Windpower II | Wasco, OR | 245.8 GWh | 33.4 mi |
| Klondike Windpower III | Wasco, OR | 698.4 GWh | 36.2 mi |
| PaTu Wind Farm LLC | Wasco, OR | 29.9 GWh | 35.6 mi |
| Pelton | Madras, OR | 361.8 GWh | 34.8 mi |
| Round Butte | Madras, OR | 794.4 GWh | 41.2 mi |
| Star Point Wind Project LLC | Wasco, OR | 217.8 GWh | 32.6 mi |
| The Dalles | The Dalles, OR | 6.4 TWh | 35.5 mi |
| Warm Springs Power Enterprises | Warm Springs, OR | 60.5 GWh | 33.4 mi |
| Windy Flats Wind Project | Centerville, WA | 671.6 GWh | 41.2 mi |
| WyEast Solar | Wasco, OR | 21.1 GWh | 34.1 mi |