Iron Horse Solar 4, LLC
146 Pond Street, North Billerica, MA 1862Plant Summary Information
Iron Horse Solar 4, LLC is ranked #53 out of 503 solar farms in Massachusetts in terms of total annual net electricity generation.
Iron Horse Solar 4, LLC generated 1.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Iron Horse Solar 4, LLC |
---|---|
Utility Name | Iron Horse Solar 4, LLC |
Location | Middlesex County, MA |
Initial Operation Date | June 2017 |
Last Update | Dec 2023 |
Annual Generation | 7.4 GWh |
Annual Consumption | 26.2 k MMBtu |
Ranked #7,041 out of 12,299 Power Plants Nationwide | |
Ranked #2,472 out of 6,182 Solar Power Plants Nationwide | |
Ranked #114 out of 609 Massachusetts Power Plants | |
Ranked #53 out of 503 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Iron Horse Solar 4, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iron Horse Solar 4, LLC.
Monthly Net Generation for Iron Horse Solar 4, LLC
Iron Horse Solar 4, LLC Details
Summary Information | |
---|---|
Plant Name | Iron Horse Solar 4, LLC (60799) |
Plant Address | 146 Pond Street, North Billerica, MA 1862 |
Utility | Iron Horse Solar 4, LLC (60479) |
Latitude, Longitude | 42.58005, -71.26033 |
Generation Dates on File | Jun 2017 to Dec 2023 |
Initial Operation Date | June 2017 |
Annual Generation | 7.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator PV1 Details Operating June 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 5.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 5.9 MW |
Iron Horse Solar 4, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2462 | Church Road Solar LLC | Angier, NC | 7.4 GWh |
#2463 | USS Fruita Solar LLC CSG | Fruita, CO | 7.4 GWh |
#2464 | Melinda Solar | Henderson, NC | 7.4 GWh |
#2465 | Church Hill | Church Hill, MD | 7.4 GWh |
#2466 | Porter Solar | New Bern, NC | 7.4 GWh |
#2467 | East Brookfield Adams Road Solar LLC CSG | East Brookfield, MA | 7.4 GWh |
#2468 | Foreman's Hill Community Solar | Red Wing, MN | 7.4 GWh |
#2469 | Rollingstone Holdco CSG | Rollingstone, MN | 7.4 GWh |
#2470 | SR Jonesborough | Jonesborough, TN | 7.4 GWh |
#2471 | Syncarpha Palmer, LLC | Palmer, MA | 7.4 GWh |
#2473 | Webster Holdco Solar CSG | Webster, MN | 7.4 GWh |
#2474 | Elizabeth Mines Solar 1 | So. Strafford, VT | 7.4 GWh |
#2475 | White Rock Road LLC | Westerly, RI | 7.4 GWh |
#2476 | Knapp East (CSG) | Akron, NY | 7.4 GWh |
#2477 | South Milford Solar Plant | Milford, UT | 7.4 GWh |
#2478 | North Run | Wrightstown, NJ | 7.3 GWh |
#2479 | Kirkwall Holdings | Warsaw, NC | 7.3 GWh |
#2480 | SCS Harpswell 012903 Brunswick, LLC | Brunswick, ME | 7.3 GWh |
#2481 | Herbert Farm Solar | Hughesville, MD | 7.3 GWh |
#2482 | Tamworth Holdings | Garland, NC | 7.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iron Horse Solar 4, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acton Solar Landfill | Acton, MA | 1.9 GWh | 11.4 mi |
Aegean Drive Solar | Methuen, MA | 2.6 GWh | 10.7 mi |
Blodgett Solar CSG | Tyngsboro, MA | 9.8 GWh | 11.6 mi |
Boott Hydropower | Lowell, MA | 27.5 GWh | 5.9 mi |
BWC Stony Brook, LLC Hybrid | Chelmsford, MA | 1.9 GWh | 8.3 mi |
Concord Solar Farm | Concord, MA | 2.0 GWh | 10.1 mi |
Equinix - Billerica | Billerica, MA | 15.0 GWh | 3.1 mi |
Hewlett-Packard (HP) - Andover, MA | Andover, MA | 2.3 GWh | 5 mi |
Iron Horse Solar I CSG | North Billerica, MA | 4.3 GWh | 0.7 mi |
Kearsarge Wilmington | Wilmington, MA | 2.3 GWh | 6.4 mi |
Lawrence Hydroelectric Associates | Lawrence, MA | 65.1 GWh | 9.6 mi |
Leominster (MA)-South Street-R&D | Tewksbury, MA | 3.2 GWh | 4.6 mi |
Lowell Solar Landfill | Lowell, MA | 1.4 GWh | 5.7 mi |
Shaffer | Billerica, MA | 6.7 GWh | 1.1 mi |
Syncarpha Tewksbury Hybrid CSG | Tewksbury, MA | 4.1 GWh | 4.3 mi |
Town of Lexington Solar | Lexington, MA | 2.6 GWh | 7.7 mi |
Tyngsborough Solar | Tyngsborough, MA | 4.0 GWh | 11.3 mi |
Westford Solar Park | Westford, MA | 4.6 GWh | 9 mi |
Wilmington Solar | Wilmington, MA | 2.6 GWh | 4.9 mi |
Woburn | Woburn, MA | 2.1 GWh | 7.8 mi |