MMWEC Simple Cycle Gas Turbine
58 Rear Pulaski Street, Peabody, MA 1960Plant Summary Information
MMWEC Simple Cycle Gas Turbine is ranked #7 out of 32 distillate fuel oil power plants in Massachusetts in terms of total annual net electricity generation.
MMWEC Simple Cycle Gas Turbine is comprised of 1 generator and generated 2.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | MMWEC Simple Cycle Gas Turbine |
|---|---|
| Utility Name | Massachusetts Mun Wholes Electric Co |
| Location | Essex County, MA |
| Initial Operation Date | July 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 8.3 GWh |
| Annual Consumption | 113.6 k MMBtu |
| Ranked #6,825 out of 13,081 Power Plants Nationwide | |
| Ranked #223 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #86 out of 648 Massachusetts Power Plants | |
| Ranked #7 out of 32 Massachusetts Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil : 69.0% Natural Gas : 31.0% |
Map of MMWEC Simple Cycle Gas Turbine
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MMWEC Simple Cycle Gas Turbine.
Monthly Net Generation for MMWEC Simple Cycle Gas Turbine
Monthly Plant Fuel Consumption for MMWEC Simple Cycle Gas Turbine
MMWEC Simple Cycle Gas Turbine Details
| Summary Information | |
|---|---|
| Plant Name | MMWEC Simple Cycle Gas Turbine (63559) |
| Plant Address | 58 Rear Pulaski Street, Peabody, MA 1960 |
| Utility | Massachusetts Mun Wholes Electric Co (11806) |
| Latitude, Longitude | 42.54342, -70.92797 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | July 2024 |
| Annual Generation | 8.3 GWh |
| Fuel Types | Distillate Fuel Oil : 69.0% Natural Gas : 31.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | New England Power Company (13433) |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | BOSTON GAS CO DBA NATIONAL GRID |
| Natural Gas Storage | No |
Generator GT1 Details Operating July 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 65 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 63 MW |
| Winter Capacity | 67 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 63 MW |
| Net Winter Capacity With Natural Gas | 70 MW |
| Net Summer Capacity With Oil | 59 MW |
| Net Winter Capacity With Oil | 67 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
MMWEC Simple Cycle Gas Turbine Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #213 | Wilson | Waynesboro, GA | 6.3 GWh |
| #214 | Waimea | Kamuela, HI | 6.2 GWh |
| #215 | French Island | La Cross, WI | 65.3 GWh |
| #216 | Lake Road (MO) | St Joseph, MO | 51.9 GWh |
| #217 | Dania Beach 7 | Ft. Lauderdale, FL | 6.8 TWh |
| #218 | Coleto Creek | Fannin, TX | 2.9 TWh |
| #219 | GCF US Holdings LLC Columbus Mill | Columbus, MS | 522.0 GWh |
| #220 | Emmonak | Emmonak, AK | 5.8 GWh |
| #221 | H Power | Kapolei, HI | 270.4 GWh |
| #222 | Richmond Generating Station | Phila., PA | 5.8 GWh |
| #224 | Coyote | Beulah, ND | 2.5 TWh |
| #225 | Covanta Stanislaus Energy | Crows Landing, CA | 61.9 GWh |
| #226 | Germantown | Germantown, WI | 33.3 GWh |
| #227 | St Marys IC | St. Mary's, AK | 5.6 GWh |
| #228 | Newton | Newton, IL | 3.4 TWh |
| #229 | John P Madgett | Alma, WI | 1.1 TWh |
| #230 | West Tisbury Generating Facility | West Tisbury, MA | 5.4 GWh |
| #231 | UCONN Cogen Facility | Storrs, CT | 112.1 GWh |
| #232 | Medical Area Total Energy Plant | Boston, MA | 318.1 GWh |
| #233 | Port Jefferson | Port Jefferson, NY | 416.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MMWEC Simple Cycle Gas Turbine.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 515 Main Saugus | Saugus, MA | 1.9 GWh | 7.2 mi |
| Beverly | Beverly, MA | 3.3 GWh | 3.3 mi |
| BWC Rams Horn Channel LLC | Beverly, MA | 5.6 GWh | 3.3 mi |
| Charlestown Wind Turbine | Charlestown, MA | 1.3 GWh | 12.8 mi |
| CoreSite - Somerville | Somerville, MA | 27.8 GWh | 13.9 mi |
| Deer Island Treatment Plant | Winthrop, MA | 33.2 GWh | 13.3 mi |
| General Electric Aircraft Engines | Lynn, MA | 2.5 GWh | 6.9 mi |
| High Street Station | Ipswich, MA | 153.0 MWh | 11.1 mi |
| Ipswich Wind Turbine | Ipswich, MA | 2.1 GWh | 12.7 mi |
| Kearsarge 100 Sohier Rd | Beverly, MA | 2.9 GWh | 2.8 mi |
| Kearsarge Wilmington | Wilmington, MA | 2.1 GWh | 10.7 mi |
| Leominster (MA)-South Street-R&D | Tewksbury, MA | 3.4 GWh | 13.4 mi |
| Middleton Solar Park | Middleton, MA | 6.8 GWh | 4.5 mi |
| Salem Harbor Power Development LP | Salem, MA | 1.6 TWh | 2.8 mi |
| Syncarpha Tewksbury Hybrid CSG | Tewksbury, MA | 3.9 GWh | 13.2 mi |
| Waters River | Peabody, MA | 5.5 GWh | 0 mi |
| Wheelabrator Saugus | Saugus, MA | 180.5 GWh | 7.2 mi |
| Wilkins Station | Marblehead, MA | 32.0 MWh | 4.1 mi |
| Wilmington Solar | Wilmington, MA | 2.0 GWh | 12.6 mi |
| Woburn | Woburn, MA | 2.0 GWh | 11 mi |