Electrolyte BESS
16027 25th Ave, Lemoore, CA 93245Plant Summary Information
Electrolyte BESS is ranked #1 out of 6 electricity used for energy storage power plants nationwide in terms of total annual net electricity generation.
Electrolyte BESS generated -512.0 MWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Electrolyte BESS |
|---|---|
| Utility Name | Henrietta BESS LLC |
| Location | Kings County, CA |
| Initial Operation Date | Not Available |
| Last Update | Oct 2025 |
| Annual Generation | 5.6 GWh |
| Annual Consumption | 0 MMBtu |
| Ranked #7,820 out of 12,553 Power Plants Nationwide | |
| Ranked #1 out of 6 Electricity Used For Energy Storage Power Plants Nationwide | |
| Ranked #1,060 out of 1,601 California Power Plants | |
| Ranked #1 out of 1 California Electricity Used For Energy Storage Power Plants | |
| Fuel Types | Electricity used for energy storage |
Map of Electrolyte BESS
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Electrolyte BESS.
Monthly Net Generation for Electrolyte BESS
Electrolyte BESS Details
| Summary Information | |
|---|---|
| Plant Name | Electrolyte BESS (66661) |
| Plant Address | 16027 25th Ave, Lemoore, CA 93245 |
| Utility | Henrietta BESS LLC (65681) |
| Latitude, Longitude | 36.24016, -119.90441 |
| Generation Dates on File | May 2025 to Oct 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 5.6 GWh |
| Fuel Types | Electricity used for energy storage |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | Yes |
Electrolyte BESS Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Electricity used for energy storage.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2 | GMP Solar/Storage-Ferrisburgh Hybrid | Ferrisburgh, VT | 8.4 GWh |
| #3 | GMP Solar/Storage-Milton Hybrid | Milton, VT | 7.4 GWh |
| #4 | GMP Solar/Storage-Essex Hybrid | Essex, VT | 7.0 GWh |
| #5 | GMP Solar - Panton Hybrid | Panton, VT | 8.8 GWh |
| #6 | Grant County | Town of Potosi, WI | 369.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Electrolyte BESS.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond | Lemoore, CA | 39.2 GWh | 2 mi |
| American Kings Solar, LLC | Lemoore, CA | 335.3 GWh | 0.4 mi |
| Aquamarine | Lemoore, CA | 683.9 GWh | 3.5 mi |
| Chestnut | Lemoore, CA | 393.3 GWh | 5.5 mi |
| Henrietta Peaker | Lemoore, CA | 4.2 GWh | 0 mi |
| Henrietta Solar Project | Lemoore, CA | 218.0 GWh | 5.7 mi |
| Huron Solar Station | Huron, CA | 28.8 GWh | 8.1 mi |
| Java Solar, LLC | Lemoore, CA | 27.2 GWh | 4.9 mi |
| Lemoore 1 | Lemoore, CA | 1.4 GWh | 6 mi |
| Lemoore West | Lemoore, CA | 14.4 GWh | 6.2 mi |
| Mustang Two | Lemoore, CA | 408.4 GWh | 1.7 mi |
| RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh | 4 mi |
| RE Kansas South LLC | Lemoore, CA | 49.2 GWh | 4 mi |
| RE Kent South, LLC | Lemoore, CA | 44.3 GWh | 1 mi |
| RE Mustang LLC | Lemoore, CA | 220.6 GWh | 1.3 mi |
| Slate Hybrid | Stratford, CA | 747.1 GWh | 1.1 mi |
| Solar Blue | Lemoore, CA | 666.8 GWh | 4.6 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 7.5 mi |
| Westlands Solar PV Farm | Huron, CA | 33.9 GWh | 11.9 mi |
| Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 1.5 mi |