Dakota Range III Wind Project
TBD, Summit, SD 57266Plant Summary Information
Dakota Range III Wind Project is ranked #15 out of 49 power plants in South Dakota in terms of total annual net electricity generation.
Dakota Range III Wind Project generated 110.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Dakota Range III Wind Project |
|---|---|
| Utility Name | Engie North America |
| Location | Grant County, SD |
| Initial Operation Date | May 2021 |
| Last Update | Sep 2025 |
| Annual Generation | 604.2 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,124 out of 12,539 Power Plants Nationwide | |
| Ranked #268 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #15 out of 49 South Dakota Power Plants | |
| Ranked #10 out of 25 South Dakota Wind Power Plants | |
| Fuel Types | Wind |
Map of Dakota Range III Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dakota Range III Wind Project.
Monthly Net Generation for Dakota Range III Wind Project
Dakota Range III Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Dakota Range III Wind Project (63102) |
| Plant Address | TBD, Summit, SD 57266 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 45.26762, -97.10398 |
| Generation Dates on File | May 2021 to Sep 2025 |
| Initial Operation Date | May 2021 |
| Annual Generation | 604.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Otter Tail Power Co (14232) SD |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WTG Details Operating May 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 153.6 MW |
| Summer Capacity | 153.6 MW |
| Winter Capacity | 153.6 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 32 |
| Turbine Details | |
| Number Of Turbines | 32 |
|---|---|
| Predominant Turbine Manufacturer | Nordex |
| Predominant Turbine Model Number | N149/4.0-4.5 |
| Design Wind Speed | 20.6 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 351 |
Dakota Range III Wind Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Dakota Range III, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #258 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #259 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
| #260 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 613.9 GWh |
| #261 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
| #262 | Cedar Springs II | Douglas, WY | 611.5 GWh |
| #263 | Bloom Wind | Minneola, KS | 610.0 GWh |
| #264 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
| #265 | Foxtail Wind, LLC | Forbes, ND | 606.6 GWh |
| #266 | White Rock East Wind Project | Anadarko, OK | 605.9 GWh |
| #267 | Oliver Wind IV | Hannover, ND | 604.8 GWh |
| #269 | Merricourt Wind Energy Center | Kulm, ND | 602.7 GWh |
| #270 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
| #271 | Mesteno | Rio Grande City, TX | 602.4 GWh |
| #272 | Jumbo Hill Wind Project | Andrews, TX | 595.9 GWh |
| #273 | Prairie Breeze | Elgin, NE | 595.7 GWh |
| #274 | Tatanka Ridge | Toronto, SD | 595.4 GWh |
| #275 | Cedar Creek II | New Raymer, CO | 595.1 GWh |
| #276 | Colorado Green Holdings LLC | Lamar, CO | 594.9 GWh |
| #277 | Golden Hill Wind | Wasco, OR | 594.4 GWh |
| #278 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 594.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dakota Range III Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Astoria Station | Astoria, SD | 459.0 GWh | 54.8 mi |
| Big Stone | Big Stone City, SD | 2.0 TWh | 29 mi |
| Blazing Star Wind Farm 1 | Hendricks, MN | 836.1 GWh | 61.6 mi |
| Buffalo Ridge II LLC | Elkton, SD | 454.3 GWh | 56.2 mi |
| Coyote Ridge | White, SD | 382.5 GWh | 62.7 mi |
| Crocker Wind Farm | Conde, SD | 767.2 GWh | 38.2 mi |
| Crowned Ridge Wind Energy Center | Watertown, SD | 820.3 GWh | 15.2 mi |
| Crowned Ridge Wind II Energy Center | Watertown, SD | 860.3 GWh | 20 mi |
| Dakota Range Wind | Marvin, SD | 896.5 GWh | 5 mi |
| Day County Wind LLC | Conde, SD | 436.1 GWh | 39.2 mi |
| Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.1 TWh | 39.4 mi |
| Groton Generation Station | Groton, SD | 180.5 GWh | 48.9 mi |
| Lake Preston | Lake Preston, SD | 86.0 MWh | 63.8 mi |
| Oak Tree Energy | Clark, SD | 69.4 GWh | 38.7 mi |
| Stevens Community Medical Center | Morris, MN | 8.0 MWh | 62.2 mi |
| Tatanka Ridge | Toronto, SD | 595.4 GWh | 53.3 mi |
| UMM Wind Turbine | Morris, MN | 4.0 GWh | 63.5 mi |
| Valley Queen Cheese | Milbank, SD | 24.0 MWh | 22.9 mi |
| Watertown Power Plant | Watertown, SD | 4.9 GWh | 25.3 mi |
| WCROC Wind Farm | Morris, MN | 4.0 GWh | 63.5 mi |