Maple Solar
2363 Maple Avenue, Vineland, NJ 8361Plant Summary Information
Maple Solar is ranked #127 out of 325 solar farms in New Jersey in terms of total annual net electricity generation.
Maple Solar generated 887.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Maple Solar |
|---|---|
| Utility Name | NFI Solar LLC |
| Location | Cumberland County, NJ |
| Initial Operation Date | May 2011 |
| Last Update | Dec 2024 |
| Annual Generation | 4.0 GWh |
| Annual Consumption | 14.2 k MMBtu |
| Ranked #8,560 out of 12,539 Power Plants Nationwide | |
| Ranked #3,591 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #184 out of 387 New Jersey Power Plants | |
| Ranked #127 out of 325 New Jersey Solar Power Plants | |
| Fuel Types | Solar |
Map of Maple Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maple Solar.
Monthly Net Generation for Maple Solar
Maple Solar Details
| Summary Information | |
|---|---|
| Plant Name | Maple Solar (57750) |
| Plant Address | 2363 Maple Avenue, Vineland, NJ 8361 |
| Utility | NFI Solar LLC (57049) |
| Latitude, Longitude | 39.4875, -74.98083 |
| Generation Dates on File | May 2011 to Dec 2024 |
| Initial Operation Date | May 2011 |
| Annual Generation | 4.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | ER10-904 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator P1 Details Operating May 2011
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 27 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator P2 Details Operating September 2011
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 27 |
| DC Net Capacity | 1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Maple Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3581 | Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 4.0 GWh |
| #3582 | Redmon Solar Farm LLC | Cleveland, NC | 4.0 GWh |
| #3583 | Lon Wright | Fremont, NE | 515.7 GWh |
| #3584 | Expressway Solar B | Victorville, CA | 4.0 GWh |
| #3585 | Industry Solar Power Generation Station | Adelanto, CA | 4.0 GWh |
| #3586 | Wolfcastle | Dekalb, IL | 4.0 GWh |
| #3587 | Kish CSG | Cherry Valley, IL | 4.0 GWh |
| #3588 | ESCA-LL-COLTON, LLC | Colton, CA | 4.0 GWh |
| #3589 | IMPA Washington Solar Park | Washington, IN | 4.0 GWh |
| #3590 | Eddy | Williamson, NY | 4.0 GWh |
| #3592 | SSD Marion 3, LLC | Salem, OR | 4.0 GWh |
| #3593 | Kinston | Kinston, NC | 4.0 GWh |
| #3594 | Norton LLC | Norton, MA | 4.0 GWh |
| #3595 | DG Harlem Solar | Freeport, IL | 4.0 GWh |
| #3596 | Hazel Solar, LLC | Howard City, MI | 4.0 GWh |
| #3597 | Berkley | Berkley, MA | 4.0 GWh |
| #3598 | Ohio Northern University Solar Site | Ada, OH | 4.0 GWh |
| #3599 | Bunker Hill Solar | Lyndon, IL | 4.0 GWh |
| #3600 | Blue Goose Solar CSG | Morrison, IL | 4.0 GWh |
| #3601 | CA Dept of Public Health at Richmond | Richmond, CA | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maple Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.1 GWh | 3.4 mi |
| Calpine Vineland Solar LLC | Vineland, NJ | 5.4 GWh | 4.9 mi |
| Carlls Corner | Upper Deerfield Twp, NJ | 5.9 GWh | 12 mi |
| Cedar Branch | Buena Vista Township, NJ | 9.6 GWh | 1.4 mi |
| Clayville | Vineland, NJ | 62.4 GWh | 4.8 mi |
| Cornerstone Power Vineland I LLC | Vineland, NJ | 4.9 GWh | 4.7 mi |
| Corning Pharmaceutical Glass | Vineland, NJ | 2.7 GWh | 2.1 mi |
| Cumberland (NJ) | Millville, NJ | 59.9 GWh | 7.8 mi |
| Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh | 6.5 mi |
| DG New Jersey Solar RLS Logistics | Newfield, NJ | 3.4 GWh | 6.3 mi |
| Howard Down | Vineland, NJ | 60.1 GWh | 2.9 mi |
| Love Lane Solar | Upper Deerfield Towns, NJ | 2.4 GWh | 12.7 mi |
| Millville City Sewer Auth WTP | Millville, NJ | 1.2 GWh | 8.2 mi |
| Pittsgrove Solar | Elmer, NJ | 2.4 GWh | 11.2 mi |
| Seabrook Solar Plant | Seabrook, NJ | 6.6 GWh | 12.5 mi |
| Sherman Avenue | Vineland, NJ | 25.7 GWh | 4.8 mi |
| The City of Vineland at North Vineland | Vineland, NJ | 4.1 GWh | 1.5 mi |
| The City of Vineland at West Vineland | Vineland, NJ | 3.3 GWh | 5.1 mi |
| Vineland Headquarters | Vineland, NJ | 1.2 GWh | 3 mi |
| Vineland Mays Landing Solar | Millville, NJ | 6.8 GWh | 4.9 mi |