Waste Management Crossroads LFGTE

357 Mercer Road, Norridgewock, ME 4957

Plant Summary Information

Waste Management Crossroads LFGTE is ranked #1 out of 1 landfill gas power plants in Maine in terms of total annual net electricity generation.

Waste Management Crossroads LFGTE is comprised of 2 generators and generated 4.4 GWh during the 3-month period between September 2024 to December 2024.

Plant NameWaste Management Crossroads LFGTE
Utility NameWM Renewable Energy LLC
LocationSomerset County, ME
Initial Operation DateMarch 2009
Last Update Dec 2024
Annual Generation 18.4 GWh
Annual Consumption 227.0 k MMBtu
Ranked #5,324 out of 12,327 Power Plants Nationwide
Ranked #160 out of 292 Landfill Gas Power Plants Nationwide
Ranked #66 out of 204 Maine Power Plants
Ranked #1 out of 1 Maine Landfill Gas Power Plants
Fuel Types Landfill Gas

Map of Waste Management Crossroads LFGTE

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waste Management Crossroads LFGTE.

Create Your Account Today

Monthly Net Generation for Waste Management Crossroads LFGTE

3k3k2k2k1k1k7007000020092009201020102011201120122012201320132014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Waste Management Crossroads LFGTE Details

Summary Information
Plant NameWaste Management Crossroads LFGTE (57016)
Plant Address357 Mercer Road, Norridgewock, ME 4957
UtilityWM Renewable Energy LLC (54842)
Latitude, Longitude44.7014, -69.8319
Generation Dates on FileMar 2009 to Dec 2024
Initial Operation DateMarch 2009
Annual Generation 18.4 GWh
Fuel Types Landfill Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number09-217-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerTown of Madison - (ME) (11477) ME
Grid Voltage 12.50 kV
Energy StorageNo

Generator GEN1 Details Operating March 2009

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationLD.MADISON 115 (4136)
RTO ISO Location Designation For Reporting Wholesale Sales DataLD.MADISON 115 (4136)
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN2 Details Operating March 2009

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationLD.MADISON 115 (4136)
RTO ISO Location Designation For Reporting Wholesale Sales DataLD.MADISON 115 (4136)
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Waste Management Crossroads LFGTE Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#150Ameresco Keller CanyonBay Point, CA19.1 GWh
#151Dry Creek LFG to Energy ProjectEagle Point, OR19.0 GWh
#152Union Renewable Energy FacilityEnoree, SC19.0 GWh
#153Timberline Trail Gas RecoveryWeyerhaeser, WI18.9 GWh
#154DADS Gas RecoveryAurora, CO18.8 GWh
#155Green Valley LFGTEAshland, KY18.8 GWh
#156Rochelle Energy CenterRochelle, IL18.7 GWh
#157Lanchester Generating StationNarvon, PA18.6 GWh
#158Front Range ProjectErie, CO18.6 GWh
#159Millersville LFGSevern, MD18.4 GWh
#161Blue Water Renewables IncKimball Township, MI18.4 GWh
#162Hidden Hollow EnergyBoise, ID18.1 GWh
#163ADS Renewable Energy-Wolf Creek LLCDry Branch, GA18.1 GWh
#164Flathead Landfill to Gas Energy FacilityKalispell, MT17.8 GWh
#165Archbald Power StationArchbald, PA77.6 GWh
#166Tulsa LFG LLCSand Springs, OK17.2 GWh
#167Fulton LFGTE FacilityJohnstown, NY17.2 GWh
#168Peoples Generating StationAnn Arbor, MI17.1 GWh
#169MM Yolo PowerWoodland, CA16.9 GWh
#170Greater New Bedford LFG Utiliz. FacilityNew Bedford, MA16.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Waste Management Crossroads LFGTE.

Plant NamePlant LocationAnnual GenerationDistance
15 Glen Harris RDNew Sharon, ME1.8 GWh8 mi
Anson Abenaki HydrosMadison, ME116.3 GWh7.2 mi
Barefoot SolarFairfiled, ME6.7 GWh13.3 mi
BNRG Norridgewock (CSG)Norridgewock, ME171.0 MWh1.4 mi
BNRG North Anson (CSG)North Anson, ME143.0 MWh11.2 mi
Cenergy - Richards (CSG)Fairfield, ME1.8 GWh11.7 mi
Dairy FarmAnson, ME542.0 MWh9.7 mi
Dynamic - Norridgewock Martin Stream (CSG)Norridgewock, ME206.0 MWh2.3 mi
Dynamic Madison (CSG)Madison, ME9.9 GWh7.8 mi
Fairfield PV - BD Solar Fairfield LLCFairfield, ME8.2 GWh12.4 mi
IOS - MEW Phase 1Madison, ME1.0 GWh7.1 mi
ME Novel Lighthouse - Front St. Solar CSSkowhegan, ME3.9 GWh5.3 mi
Messalonskee 2 (Oakland)Oakland, ME10.8 GWh12.1 mi
Messalonskee 3Oakland, ME6.5 GWh11.7 mi
OaklandOakland, ME9.0 GWh11.3 mi
River RoadNorridgewock, ME8.1 GWh4.4 mi
ShawmutShawmut, ME17.0 GWh13.2 mi
Solar Mule, LLCOakland, ME2.0 GWh12.7 mi
Somerset PlantSkowhegan, ME574.0 GWh9.1 mi
Weston HydroSkowhegan, ME57.4 GWh7.1 mi