Standing Bear Lake
11401 Military RD, Omaha, NE 68164Plant Summary Information
Standing Bear Lake is ranked #49 out of 124 power plants in Nebraska in terms of total annual net electricity generation.
Standing Bear Lake is comprised of 9 generators and generated 38.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Standing Bear Lake |
|---|---|
| Utility Name | Omaha Public Power District |
| Location | Douglas County, NE |
| Initial Operation Date | November 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 38.8 GWh |
| Annual Consumption | 266.3 k MMBtu |
| Ranked #4,568 out of 13,285 Power Plants Nationwide | |
| Ranked #1,306 out of 2,215 Natural Gas Power Plants Nationwide | |
| Ranked #49 out of 124 Nebraska Power Plants | |
| Ranked #10 out of 36 Nebraska Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 69.2% Distillate Fuel Oil : 30.8% |
Map of Standing Bear Lake
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Standing Bear Lake.
Monthly Net Generation for Standing Bear Lake
Monthly Plant Fuel Consumption for Standing Bear Lake
Standing Bear Lake Details
| Summary Information | |
|---|---|
| Plant Name | Standing Bear Lake (64548) |
| Plant Address | 11401 Military RD, Omaha, NE 68164 |
| Utility | Omaha Public Power District (14127) |
| Latitude, Longitude | 41.31581, -96.09392 |
| Generation Dates on File | Nov 2025 to Dec 2025 |
| Initial Operation Date | November 2025 |
| Annual Generation | 38.8 GWh |
| Fuel Types | Natural Gas : 69.2% Distillate Fuel Oil : 30.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Omaha Public Power District (14127) NE |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | METROPOLITAN UTILITIES DIST OF OMAHA |
| Natural Gas Storage | No |
Generator 1 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 2 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 3 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 4 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 5 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 6 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 7 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 8 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator 9 Details Operating November 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 16.8 MW |
| Winter Capacity | 16.8 MW |
| Minimum Load | 8.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 16.8 MW |
| Net Winter Capacity With Natural Gas | 16.8 MW |
| Net Summer Capacity With Oil | 16.8 MW |
| Net Winter Capacity With Oil | 16.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Standing Bear Lake Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1296 | HSCo CHP | Hartford, CT | 27.7 GWh |
| #1297 | Germantown | Germantown, WI | 33.3 GWh |
| #1298 | Illumina Way SD | San Diego, CA | 27.5 GWh |
| #1299 | King City Power Plant | King City, CA | 27.5 GWh |
| #1300 | Louisa | Muscatine, IA | 4.3 TWh |
| #1301 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 28.7 GWh |
| #1302 | Yankee Street | Centerville, OH | 29.0 GWh |
| #1303 | Hoag Hospital Cogen Plant | Newport Beach, CA | 27.2 GWh |
| #1304 | Sowega Power | Baconton, GA | 29.3 GWh |
| #1305 | CSUF Trigeneration | Fullerton, CA | 33.6 GWh |
| #1307 | Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 26.8 GWh |
| #1308 | University of Rochester | Rochester, NY | 26.8 GWh |
| #1309 | Little Dixie | Centrahoma, OK | 26.8 GWh |
| #1310 | Mosinee Mill | Mosinee, WI | 94.6 GWh |
| #1311 | Doyle Energy Facility | Monroe, GA | 26.7 GWh |
| #1312 | Weston | Rothschild, WI | 4.1 TWh |
| #1313 | Cymric 6Z Cogen | McKittrick, CA | 26.6 GWh |
| #1314 | Herbert A Wagner | Baltimore, MD | 392.3 GWh |
| #1315 | Danskammer Generating Station | Newburgh, NY | 26.6 GWh |
| #1316 | Georgia-Pacific Big Island | Big Island, VA | 40.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Standing Bear Lake.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Archer Daniels Midland Lincoln | Lincoln, NE | 44.9 GWh | 41.2 mi |
| Burt County Solar Hybrid | Tekamah, NE | 1.5 GWh | 38.5 mi |
| Cass County | Plattsmouth, NE | 154.7 GWh | 26.3 mi |
| Dodge County Solar Hybrid | Scribner, NE | 1.4 GWh | 39.7 mi |
| Elk City Station | Bennington, NE | 39.2 GWh | 9.6 mi |
| Fort Calhoun Community Solar | Fort Calhoun, NE | 9.3 GWh | 10.8 mi |
| Harlan | Harlan, IA | 1.0 MWh | 46.3 mi |
| Jones Street | Omaha, NE | 9.9 GWh | 9.9 mi |
| Lon Wright | Fremont, NE | 465.8 GWh | 20.6 mi |
| Missouri River Wastewater Treatment | Omaha, NE | 11.1 GWh | 11.6 mi |
| North Omaha | Omaha, NE | 1.6 TWh | 7.8 mi |
| Papillion Creek Wastewater | Bellevue, NE | 2.7 GWh | 20.2 mi |
| Platteview Solar LLC | Ashland, NE | 150.8 GWh | 17.2 mi |
| Sarpy County | Bellevue, NE | 179.3 GWh | 11.9 mi |
| Scribner Diesel Generation Facility | Scribner, NE | 68.0 MWh | 38.5 mi |
| Terry Bundy Generating Station | Lincoln, NE | 131.3 GWh | 39 mi |
| Turtle Creek | Springfield, NE | 539.1 GWh | 15.9 mi |
| Wahoo | Wahoo, NE | 42.0 MWh | 27.8 mi |
| Walnut Wind Farm | Walnut, IA | 558.3 GWh | 45.3 mi |
| Walter Scott Jr Energy Center | Council Bluffs, IA | 7.3 TWh | 16.2 mi |