Riverview Solar
15778 County Road 370, Sterling, CO 80751Plant Summary Information
Riverview Solar is ranked #97 out of 153 solar farms in Colorado in terms of total annual net electricity generation.
Riverview Solar generated 597.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Riverview Solar |
---|---|
Utility Name | Highline Services, LLC |
Location | Logan County, CO |
Initial Operation Date | November 2019 |
Last Update | Dec 2024 |
Annual Generation | 3.5 GWh |
Annual Consumption | 12.5 k MMBtu |
Ranked #8,878 out of 12,312 Power Plants Nationwide | |
Ranked #3,857 out of 6,191 Solar Power Plants Nationwide | |
Ranked #208 out of 283 Colorado Power Plants | |
Ranked #97 out of 153 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Riverview Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverview Solar.
Monthly Net Generation for Riverview Solar
Riverview Solar Details
Summary Information | |
---|---|
Plant Name | Riverview Solar (63092) |
Plant Address | 15778 County Road 370, Sterling, CO 80751 |
Utility | Highline Services, LLC (62902) |
Latitude, Longitude | 40.66583, -103.13244 |
Generation Dates on File | Nov 2019 to Dec 2024 |
Initial Operation Date | November 2019 |
Annual Generation | 3.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Highline Electric Assn (8570) CO |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator RIVER Details Operating November 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Other Combustion Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 135 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Riverview Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Farm Credit Leasing Services Corporation | 600 Highway 169 South, Minneapolis, MN 55426 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3847 | Victor Mesa Linda B2 | Victorville, CA | 3.5 GWh |
#3848 | Willis Solar | Pamplico, SC | 3.5 GWh |
#3849 | Rockford Solar Farm | Rockford, IL | 3.5 GWh |
#3850 | DG AMP Rittman Rd | Wadsworth, OH | 3.5 GWh |
#3851 | Logan 1 Community Solar Array | Sterling, CO | 3.5 GWh |
#3852 | ELP Myer CSG | Ulster, NY | 3.5 GWh |
#3853 | Landau II Solar (Hybrid) | Kingston, NY | 3.5 GWh |
#3854 | Long John CSG | Sandwich, IL | 3.5 GWh |
#3855 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.5 GWh |
#3856 | Gary Solar | Bishopville, SC | 3.5 GWh |
#3858 | Bear One | Hancock, MD | 3.5 GWh |
#3859 | ATI | Cudahy, WI | 3.5 GWh |
#3860 | POM Plant 2 | Del Rey, CA | 3.5 GWh |
#3861 | SV CSG Lily Lake 2 LLC | Maple Park, IL | 3.5 GWh |
#3862 | Vincent Solar | Lynchburg, SC | 3.5 GWh |
#3863 | Kale Patch Solar | Gervais, OR | 3.5 GWh |
#3864 | Ludie Brown Solar Energy Storage | Chinquapin, NC | 3.4 GWh |
#3865 | Hastings Community Solar Farm | Hastings, NE | 3.5 GWh |
#3866 | Donati Solar | Seneca Falls, NY | 3.5 GWh |
#3867 | Victor Mesa Linda C2 | Victorville, CA | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverview Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CBEP Solar 1, LLC | Sterling, CO | 10.7 GWh | 3.7 mi |
Colorado Highlands Wind | Fleming, CO | 355.0 GWh | 21.3 mi |
Logan 1 Community Solar Array | Sterling, CO | 3.5 GWh | 3.9 mi |
Logan Wind Energy | Peetz, CO | 556.9 GWh | 20.1 mi |
Mtn Solar 6 LLC (CSG) | Sterling, CO | 3.9 GWh | 6.4 mi |
Mtn. Solar 3 CSG | Brush, CO | 3.6 GWh | 36.9 mi |
Niyol Wind, LLC | Fleming, CO | 829.8 GWh | 10.1 mi |
Northern Colorado Wind LLC | Peetz, CO | 557.5 GWh | 25.4 mi |
NSE Camber Solar PS11 LLC (CSG) | Sterling, CO | 3.9 GWh | 6.4 mi |
NSE Camber Solar PS13 LLC (CSG) | Sterling, CO | 3.8 GWh | 3.5 mi |
OREG 4 Peetz | Peetz, CO | 3.2 GWh | 26.9 mi |
Peetz Table Wind Energy | Peetz, CO | 687.0 GWh | 27.2 mi |
Pivot Solar 12 LLC(CSG) | Sterling, CO | 1.9 GWh | 6.4 mi |
Pivot Solar 14 LLC (CSG) | Brush, CO | 3.7 GWh | 39 mi |
Pivot Solar 15 LLC (CSG) | Brush, CO | 2.0 GWh | 39.1 mi |
Pivot Solar 2 LLC (CSG) | Brush, CO | 3.9 GWh | 39 mi |
Ridge Crest Wind Partners | Peetz, CO | 51.4 GWh | 19.4 mi |
Spring Canyon | Peetz, CO | 154.4 GWh | 23.6 mi |
Spring Canyon Expansion Wind Energy Ctr | Peetz, CO | 71.9 GWh | 20.8 mi |
Sterling PV 3 | Sterling, CO | 3.8 GWh | 4 mi |