West Point (GA)
500 Resource Management Drive, West Point, GA 31833Plant Summary Information
West Point (GA) is ranked #4 out of 27 hydroelectric power plants in Georgia in terms of total annual net electricity generation.
West Point (GA) is comprised of 3 generators and generated 21.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | West Point (GA) |
|---|---|
| Utility Name | USCE-Mobile District |
| Location | Troup County, GA |
| Initial Operation Date | April 1975 |
| Last Update | Dec 2025 |
| Annual Generation | 159.0 GWh |
| Annual Consumption | 575.1 k MMBtu |
| Ranked #2,872 out of 13,081 Power Plants Nationwide | |
| Ranked #240 out of 1,311 Water Power Plants Nationwide | |
| Ranked #68 out of 247 Georgia Power Plants | |
| Ranked #4 out of 27 Georgia Water Power Plants | |
| Fuel Types | Water |
Map of West Point (GA)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Point (GA).
Monthly Net Generation for West Point (GA)
Monthly Plant Fuel Consumption for West Point (GA)
West Point (GA) Details
| Summary Information | |
|---|---|
| Plant Name | West Point (GA) (6133) |
| Plant Address | 500 Resource Management Drive, West Point, GA 31833 |
| Utility | USCE-Mobile District (27813) |
| Latitude, Longitude | 32.91867, -85.1887 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | April 1975 |
| Annual Generation | 159.0 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Chattahoochee River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 1 Details Operating April 1975
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1975 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating April 1975
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 35 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 42 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1975 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating April 1975
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 35 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 42 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1975 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
West Point (GA) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #230 | Kern River 1 | Bakersfield, CA | 175.7 GWh |
| #231 | Webbers Falls | Webbers Falls, OK | 174.3 GWh |
| #232 | Hudson Falls Hydroelectric Project | South Glens Falls, NY | 170.4 GWh |
| #233 | Carmen Smith | McKenzie Bridge, OR | 167.9 GWh |
| #234 | Woodleaf | Forbestown, CA | 167.1 GWh |
| #235 | Drum 2 | Alta, CA | 164.2 GWh |
| #236 | North Fork | Estacada, OR | 164.0 GWh |
| #237 | Greers Ferry Lake | Heber Springs, AR | 163.4 GWh |
| #238 | St Stephen | St. Stephen, SC | 161.1 GWh |
| #239 | Cushman 2 | Shelton, WA | 160.5 GWh |
| #241 | Chilhowee | Tallassee, TN | 157.7 GWh |
| #242 | Eklutna Hydro Project | Palmer, AK | 157.6 GWh |
| #243 | Holt Dam | Tuscaloosa, AL | 156.6 GWh |
| #244 | Saint Marys Falls | Sault Ste. Marie, MI | 156.0 GWh |
| #245 | Haas | Balch Camp, CA | 154.8 GWh |
| #246 | Colton | Pierrepont, NY | 154.2 GWh |
| #247 | Prairie Du Sac | Prairie du Sac, WI | 152.9 GWh |
| #248 | Big Creek 8 | Auberry, CA | 151.8 GWh |
| #249 | Harris Hydro | West Forks, ME | 150.9 GWh |
| #250 | Bankhead Dam | Northport, AL | 150.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Point (GA).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartletts Ferry | Salem, AL | 324.1 GWh | 18.6 mi |
| Chattahoochee Energy Facility | Franklin, GA | 3.9 TWh | 34.9 mi |
| Goat Rock | Smiths, AL | 88.1 GWh | 22.3 mi |
| Greenville | Greenville, GA | 1.4 GWh | 28.9 mi |
| H Allen Franklin Combined Cycle | Smiths, AL | 12.2 TWh | 22.1 mi |
| Harris Dam | Lineville, AL | 134.0 GWh | 34.1 mi |
| Harris Shiloh | Shiloh, GA | 4.1 GWh | 29.8 mi |
| Hawk Road Facility | Franklin, GA | 722.2 GWh | 32.5 mi |
| Kimberly-Clark Solar | LaGrange, GA | 4.4 GWh | 10.6 mi |
| LaFayette Solar Farm | LaFayette, AL | 163.8 GWh | 11.9 mi |
| Meriwether Jackson | Machester, GA | 5.2 GWh | 31.7 mi |
| Muscogee Public Works | Columbus, GA | 2.9 GWh | 35 mi |
| North Highlands | Columbus, GA | 96.9 GWh | 31 mi |
| Oliver Dam | Columbus, GA | 120.3 GWh | 29.9 mi |
| Tenaska Georgia Generation Facility | Franklin, GA | 105.9 GWh | 31.9 mi |
| Troup RC50 | Pine Mountain, GA | 4.5 GWh | 19.7 mi |
| Troup RC50 II | Pine Mountain, GA | 3.2 GWh | 17 mi |
| Walton Discover Power Facility | Smiths, AL | 69.0 MWh | 27.5 mi |
| Wansley Combined Cycle | Franklin, GA | 7.4 TWh | 34.8 mi |
| Wansley Unit 9 | Franklin, GA | 2.6 TWh | 34.9 mi |