Saddleback Solar
550 N. Main Street, Lanesborough, MA 1237Plant Summary Information
Saddleback Solar is ranked #242 out of 522 solar farms in Massachusetts in terms of total annual net electricity generation.
Saddleback Solar generated 555.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Saddleback Solar |
|---|---|
| Utility Name | SoCore Energy LLC |
| Location | Berkshire County, MA |
| Initial Operation Date | September 2022 |
| Last Update | Dec 2024 |
| Annual Generation | 3.5 GWh |
| Annual Consumption | 12.1 k MMBtu |
| Ranked #9,021 out of 12,539 Power Plants Nationwide | |
| Ranked #3,960 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #324 out of 629 Massachusetts Power Plants | |
| Ranked #242 out of 522 Massachusetts Solar Power Plants | |
| Fuel Types | Solar |
Map of Saddleback Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Saddleback Solar.
Monthly Net Generation for Saddleback Solar
Saddleback Solar Details
| Summary Information | |
|---|---|
| Plant Name | Saddleback Solar (68680) |
| Plant Address | 550 N. Main Street, Lanesborough, MA 1237 |
| Utility | SoCore Energy LLC (60520) |
| Latitude, Longitude | 42.536, -73.229 |
| Generation Dates on File | Jan 2024 to Dec 2024 |
| Initial Operation Date | September 2022 |
| Annual Generation | 3.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF19-208 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
| Grid Voltage | 22.00 kV |
| Energy Storage | Yes |
Generator BA1 Details Operating September 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.5 |
|---|---|
| Maximum Charge Rate | 2.5 MW |
| Maximum Discharge Rate | 2.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 2.5 |
| Storage Enclosure Type | CS |
| Frequency Regulation | Yes |
| Load Management | P |
| Voltage Or Reactive Power Support | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | Yes |
Generator PV1 Details Operating September 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3.6 MW |
| Summer Capacity | 3.6 MW |
| Winter Capacity | 3.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 188 |
| Tilt Angle | 20 |
| DC Net Capacity | 4.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Saddleback Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3950 | ZPD-PT Solar Project 2017-023 LLC Hybrid | Southbridge, MA | 3.5 GWh |
| #3951 | Canis Major Solar Farm | Suffield, CT | 3.6 GWh |
| #3952 | Sol Phoenix | Capitol Heights, MD | 3.6 GWh |
| #3953 | Wachusett Solar | Rutland, MA | 3.6 GWh |
| #3954 | Lukuc B Community Solar LLC CSG | Herrin, IL | 3.6 GWh |
| #3955 | Kearsarge Montague BD(CSG) | Montague, MA | 3.4 GWh |
| #3956 | Iroquois Solar 1B LLC CSG | Watseka, IL | 3.5 GWh |
| #3957 | BEMS West Solar CSG | Southampton, NJ | 3.5 GWh |
| #3958 | Solar Star Urbana Landfill East | Urbana, IL | 3.5 GWh |
| #3959 | Sand Road | North Canaan, CT | 3.5 GWh |
| #3961 | Victor Mesa Linda D2 | Victorville, CA | 3.5 GWh |
| #3962 | Victor Mesa Linda B2 | Victorville, CA | 3.5 GWh |
| #3963 | Willis Solar | Pamplico, SC | 3.5 GWh |
| #3964 | Rockford Solar Farm | Rockford, IL | 3.5 GWh |
| #3965 | DG AMP Rittman Rd | Wadsworth, OH | 3.5 GWh |
| #3966 | Logan 1 Community Solar Array | Sterling, CO | 3.5 GWh |
| #3967 | ELP Myer CSG | Ulster, NY | 3.5 GWh |
| #3968 | Landau II Solar (Hybrid) | Kingston, NY | 3.5 GWh |
| #3969 | Long John CSG | Sandwich, IL | 3.5 GWh |
| #3970 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Saddleback Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 401 South | Dalton, MA | 403.0 MWh | 5.5 mi |
| Adams Grove Solar | Adams, MA | 6.2 GWh | 6.9 mi |
| Berkshire Wind Power Project | Lanesboro, MA | 39.1 GWh | 4.2 mi |
| Downing Parkway Solar | Pittsfield, MA | 3.4 GWh | 5.6 mi |
| East Acres Solar NG, LLC | Pittsfield, MA | 4.9 GWh | 3.4 mi |
| Harbor Road Solar 1 | Cheshire, MA | 2.9 GWh | 6.2 mi |
| Hinsdale Solar PV | Hinsdale, MA | 3.1 GWh | 9 mi |
| Nexamp Peak CSG | Hancock, MA | 2.3 GWh | 3.5 mi |
| North Adams Landfill | North Adams, MA | 3.5 GWh | 11.5 mi |
| Partridge Solar | Lanesborough, MA | 8.0 GWh | 3.3 mi |
| Peru (MA) | Peru, MA | 5.2 GWh | 10.8 mi |
| Pittsfield 44 - M&W PV | Pittsfield, MA | 1.7 GWh | 3.4 mi |
| Pittsfield Generating LP | Pittsfield, MA | 123.3 GWh | 5.5 mi |
| Savoy Solar PV | Savoy, MA | 3.2 GWh | 9.3 mi |
| Silver Lake Solar Photovoltaic Facility | Pittsfield, MA | 805.0 MWh | 5.8 mi |
| Skyline Solar | Lanesborough, MA | 7.2 GWh | 2.3 mi |
| Syncarpha Hancock I CSG | Hancock, MA | 3.1 GWh | 9 mi |
| Syncarpha Hancock II CSG | Hancock, MA | 3.2 GWh | 9.6 mi |
| Syncarpha Hancock III CSG | Pittsfield, MA | 1.6 GWh | 9.1 mi |
| Williams College - Campus CHP | Williamstown, MA | 1.3 GWh | 12.1 mi |