Swift 1
Rd 91013 at Swift Creek Res., Cougar, WA 98616Plant Summary Information
Swift 1 is ranked #36 out of 131 power plants in Washington in terms of total annual net electricity generation.
Swift 1 is comprised of 3 generators and generated 159.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Swift 1 |
|---|---|
| Utility Name | PacifiCorp |
| Location | Skamania County, WA |
| Initial Operation Date | December 1958 |
| Last Update | May 2026 |
| Annual Generation | 508.0 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,348 out of 13,081 Power Plants Nationwide | |
| Ranked #76 out of 1,311 Water Power Plants Nationwide | |
| Ranked #36 out of 131 Washington Power Plants | |
| Ranked #18 out of 70 Washington Water Power Plants | |
| Fuel Types | Water |
Map of Swift 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Swift 1.
Monthly Net Generation for Swift 1
Monthly Plant Fuel Consumption for Swift 1
Swift 1 Details
| Summary Information | |
|---|---|
| Plant Name | Swift 1 (3850) |
| Plant Address | Rd 91013 at Swift Creek Res., Cougar, WA 98616 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 46.06083, -122.20167 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | December 1958 |
| Annual Generation | 508.0 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - West (PACW) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Lewis River |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator HY11 Details Operating December 1958
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 87.9 MW |
| Winter Capacity | 87.9 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1958 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator HY12 Details Operating December 1958
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 87.9 MW |
| Winter Capacity | 87.9 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1958 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator HY13 Details Operating December 1958
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 87.9 MW |
| Winter Capacity | 87.9 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1958 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Swift 1 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #66 | Nickajack | New Hope, TN | 577.6 GWh |
| #67 | Calderwood | Tallassee, TN | 568.7 GWh |
| #68 | Mammoth Pool | North Fork, CA | 568.6 GWh |
| #69 | Yellowtail | Hardin, MT | 566.2 GWh |
| #70 | J Strom Thurmond | Clarks Hill, SC | 566.0 GWh |
| #71 | Folsom | Folsom, CA | 537.6 GWh |
| #72 | James B Black | Big Bend, CA | 530.6 GWh |
| #73 | Diablo | Rockport, WA | 518.2 GWh |
| #74 | Dardanelle | Dardanelle, AR | 517.3 GWh |
| #75 | Guntersville | Guntersville, AL | 509.1 GWh |
| #77 | Great Lakes Hydro America - ME | Millinocket, ME | 500.1 GWh |
| #78 | Osage Dam | Eldon, MO | 498.9 GWh |
| #79 | R C Kirkwood | Groveland, CA | 489.0 GWh |
| #80 | Lay Dam | Clanton, AL | 482.4 GWh |
| #81 | Trinity | Weaverville, CA | 475.6 GWh |
| #82 | Yale | Amboy, WA | 472.5 GWh |
| #83 | Cheoah | Tapoco, NC | 472.4 GWh |
| #84 | Rock Creek | Storrie, CA | 471.6 GWh |
| #85 | Caribou 2 | Belden, CA | 470.8 GWh |
| #86 | Meldahl Hydroelectric Project | Foster, KY | 470.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Swift 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bonneville | Cascade Locks, OR | 4.1 TWh | 31.4 mi |
| Boring Solar LLC | Sandy, OR | 3.9 GWh | 43.7 mi |
| Copper Dam Plant | Hood River, OR | 14.6 GWh | 42.6 mi |
| Cowlitz Falls | Randle, WA | 195.6 GWh | 28.3 mi |
| Dunn Road Solar | Sandy, OR | 2.8 GWh | 43.7 mi |
| Longview Fibre | Longview, WA | 248.5 GWh | 34.5 mi |
| Mayfield | Silver Creek, WA | 602.5 GWh | 35.7 mi |
| Merwin | Ariel, WA | 422.6 GWh | 18.4 mi |
| Mint Farm Generating Station | Longview, WA | 2.3 TWh | 37.9 mi |
| Mossyrock | Silver Creek, WA | 1.0 TWh | 34.4 mi |
| Nippon Dynawave Packaging Longview WA | Longview, WA | 266.6 GWh | 37.2 mi |
| NSE Astoria - Skyward | Boring, OR | 4.1 GWh | 44.5 mi |
| Oregon Convention Center | Portland, OR | 1.5 GWh | 43 mi |
| Peters Drive Plant | Hood River, OR | 6.9 GWh | 41.5 mi |
| PHP 1 | Sandy, OR | 37.6 GWh | 40.4 mi |
| PHP 2 | Sandy, OR | 25.8 GWh | 42.3 mi |
| River Road Gen Plant | Vancouver, WA | 1.3 TWh | 38 mi |
| Sandy River Solar (CSG) | Sandy, OR | 2.3 GWh | 43.7 mi |
| SulusSolar29 | Boring, OR | 3.8 GWh | 41.7 mi |
| Yale | Amboy, WA | 472.5 GWh | 9.3 mi |