Becker Solar 3 CSG
15th Street N.E., St. Michael, MN 55376Plant Summary Information
Becker Solar 3 CSG is ranked #465 out of 504 solar farms in Minnesota in terms of total annual net electricity generation.
Becker Solar 3 CSG generated 244.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Becker Solar 3 CSG |
|---|---|
| Utility Name | SunShare Management |
| Location | Wright County, MN |
| Initial Operation Date | March 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 1.6 GWh |
| Annual Consumption | 5.5 k MMBtu |
| Ranked #11,022 out of 12,529 Power Plants Nationwide | |
| Ranked #5,747 out of 6,390 Solar Power Plants Nationwide | |
| Ranked #659 out of 758 Minnesota Power Plants | |
| Ranked #465 out of 504 Minnesota Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
SunShare (2018 to 2018) SunShare Management (2019 to 2024) |
Map of Becker Solar 3 CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Becker Solar 3 CSG.
Monthly Net Generation for Becker Solar 3 CSG
Becker Solar 3 CSG Details
| Summary Information | |
|---|---|
| Plant Name | Becker Solar 3 CSG (62085) |
| Plant Address | 15th Street N.E., St. Michael, MN 55376 |
| Utility | SunShare Management (60970) |
| Latitude, Longitude | 45.17494, -93.68365 |
| Generation Dates on File | Mar 2019 to Dec 2024 |
| Initial Operation Date | March 2019 |
| Annual Generation | 1.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
| Grid Voltage | 35.00 kV |
| Energy Storage | No |
Generator BCKR3 Details Operating March 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 1 MW |
Becker Solar 3 CSG Plant Owners
| Owner Name | Address | Ownership | |
|---|---|---|---|
| We couldn't locate any owners for this plant | |||
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5737 | Strandness Garden | Starbuck, MN | 1.6 GWh |
| #5738 | Cornell Snyder Road Solar Array | Lansing, NY | 1.6 GWh |
| #5739 | El Dorado AR | El Dorado, AR | 1.6 GWh |
| #5740 | Becker Solar 2 CSG | St. Michael, MN | 1.6 GWh |
| #5741 | IMPA Tell City Solar Park | Tell City, IN | 1.6 GWh |
| #5742 | Salvation Army Solar | Camden, NJ | 1.6 GWh |
| #5743 | CSUF State College | Fullerton, CA | 1.6 GWh |
| #5744 | KSU Trumbull | Warren, OH | 1.6 GWh |
| #5745 | Lake Waconia IV Community Solar Garden | Waconia, MN | 1.6 GWh |
| #5746 | Trenton Solar Farm | Trenton, NJ | 1.6 GWh |
| #5748 | Erin Garden Solar | City of Green Isle, MN | 1.6 GWh |
| #5749 | 700 Binnewater | Rosendale, NY | 1.6 GWh |
| #5750 | IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh |
| #5751 | Methuen Landfill | Methuen, MA | 1.6 GWh |
| #5752 | Novel Martin Solar One LLC (McLeod) CSG | Lester Prairie, MN | 1.6 GWh |
| #5753 | Summit Associates | Edison, NJ | 1.6 GWh |
| #5754 | L'Oreal Piscataway | New Brunswick, NJ | 1.6 GWh |
| #5755 | Torrence Ave Solar 1 LLC | Chicago Heights, IL | 1.6 GWh |
| #5756 | Braley Road 2 | Freetown, MA | 1.6 GWh |
| #5757 | Grassland 1&2 Solar Project | Davis, CA | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Becker Solar 3 CSG.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anoka County MN CONX | Ramsey, MN | 5.6 GWh | 10.6 mi |
| B.R. Corcoran CSG | Corcoran, MN | 8.4 GWh | 7.5 mi |
| Becker Solar 2 CSG | St. Michael, MN | 1.6 GWh | 0 mi |
| Becker Solar 4 CSG | St. Michael, MN | 1.6 GWh | 0.2 mi |
| Becker Solar 5 CSG | St. Michael, MN | 1.6 GWh | 0.2 mi |
| Becker Solar CSG | St. Michael, MN | 1.6 GWh | 0 mi |
| Corcoran CSG | Corcoran, MN | 7.8 GWh | 5.8 mi |
| Delano | Delano, MN | 51.9 MWh | 10.6 mi |
| Dickinson Solar Array | Buffalo, MN | 2.7 GWh | 7.6 mi |
| Elk River | Elk River, MN | 69.3 GWh | 10.4 mi |
| Lake Pulaski Solar | Buffalo, MN | 12.1 GWh | 6.4 mi |
| Monticello Project CSG | Monticello, MN | 8.3 GWh | 9.7 mi |
| SolarClub 10 LLC | Monticello, MN | 2.1 GWh | 9.8 mi |
| Tatanka Wi | Buffalo, MN | 11.3 GWh | 10.1 mi |
| USS Big Lake 1 Solar CSG | Big Lake, MN | 2.0 GWh | 10.6 mi |
| USS Golly Gee Solar LLC | Clear Lake, MN | 2.1 GWh | 6.8 mi |
| USS Quail Solar LLC | Monticello, MN | 1.8 GWh | 7.9 mi |
| Wright Cuddyer CSG | St. Michael, MN | 5.2 GWh | 2.5 mi |
| Wright Kirby 1-5 CSG | Monticello, MN | 6.9 GWh | 7.8 mi |
| WrightSun CSG, LLC | St. Michael, MN | 5.9 GWh | 3.3 mi |