Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kings Mountain Energy Center | Carolina Power Partners, LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 3.1 TWh | Jul 2018 | Sep 2025 | Natural Gas |
| Pilot Mountain Solar, LLC | USF Essex Lessor, LLC | King, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Aug 2020 | Dec 2024 | Solar |
| Waste Management Piedmont LFGTE Project | WM Renewable Energy LLC | Kernersville, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Feb 2011 | Dec 2024 | Landfill Gas |
| Duplin Solar I LLC (160 Houston Lane) | Duplin Solar I, LLC | Kenansville, NC | Duke Energy Carolinas (DUK) | 2.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Kenansville Solar 2, LLC | Cypress Creek Renewables | Kenansville, NC | Duke Energy Carolinas (DUK) | 3.0 GWh | Feb 2016 | Dec 2024 | Solar |
| Kenansville Solar Farm, LLC | SRE Utility Solar 1, LLC | Kenansville, NC | Duke Energy Carolinas (DUK) | 3.4 GWh | Nov 2014 | Nov 2024 | Solar |
| Kenansville | AES Distributed Energy | Kenansville, NC | Duke Energy Carolinas (DUK) | 3.8 GWh | Nov 2013 | Dec 2024 | Solar |
| Kelford (Cypress) | Cypress Creek Renewables | Kelford, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Apr 2016 | Dec 2024 | Solar |
| Beth | Cypress Creek Renewables | Julian, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Charlie | Cypress Creek Renewables | Julian, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2014 | Dec 2024 | Solar |
| 1047 Little Mountain Solar, LLC | CI-II Mitchell Holding LLC | Jonesville, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Oct 2019 | Dec 2024 | Solar |
| Mill Pond Solar, LLC | Greenbacker Renewable Energy Corporation | Jamesville, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Jul 2019 | Dec 2024 | Solar |
| Jamesville Road Solar, LLC | Greenbacker Renewable Energy Corporation | Jamesville, NC | PJM Interconnection, LLC (PJM) | 10.6 GWh | Oct 2019 | Dec 2024 | Solar |
| 1034 Catherine Lake Solar, LLC | 1034 Catherine Lake Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 6.8 GWh | Mar 2021 | Dec 2024 | Solar |
| Cruise Solar, LLC | Cruise Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Aug 2021 | Dec 2024 | Solar |
| Onslow Power Producers | Cube District Energy, LLC | Jacksonville, NC | Duke Energy Carolinas (DUK) | 13.2 GWh | Oct 2013 | Dec 2024 | Landfill Gas |
| Innovative Solar 43, LLC | Cypress Creek Renewables | Ivanhoe, NC | Duke Energy Progress East (CPLE) | 64.5 GWh | Nov 2016 | Sep 2025 | Solar |
| McGuire | Duke Energy Carolinas, LLC | Huntersville, NC | Duke Energy Carolinas (DUK) | 19.9 TWh | Aug 1981 | Sep 2025 | Nuclear |
| 1073 Onslow Solar | 1073 Onslow Solar, LLC | Hubert, NC | Duke Energy Carolinas (DUK) | 5.7 GWh | Apr 2021 | Dec 2024 | Solar |
| Hot Springs Energy Storage & Microgrid | Duke Energy Progress - (NC) | Hot Springs, NC | Duke Energy Progress West (CPLW) | 2.5 GWh | Jun 2022 | Dec 2024 | Solar |
| Innovative Solar 46 | Cypress Creek Renewables | Hope Mills, NC | Duke Energy Progress East (CPLE) | 130.8 GWh | Nov 2016 | Sep 2025 | Solar |
| Panda Solar NC 9, LLC | Panda Solar NC 9, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | May 2019 | Dec 2024 | Solar |
| Panda Solar NC 11, LLC | Panda Solar NC 11, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | May 2019 | Dec 2024 | Solar |
| Panda Solar NC 10, LLC | Panda Solar NC 10, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | May 2019 | Dec 2024 | Solar |
| Harding Solar, LLC | SolRiver Capital LLC | Hookerton, NC | Duke Energy Carolinas (DUK) | 6.9 GWh | Feb 2024 | Dec 2024 | Solar |
| Fort Bragg - Camp Mackall PV BESS System | Ameresco Federal Solutions | Hoffman, NC | Duke Energy Progress East (CPLE) | 1.5 GWh | Jan 2023 | Dec 2024 | Solar |
| Innovative Solar 26, LLC | Cypress Creek Renewables | Hildebran, NC | Duke Energy Carolinas (DUK) | 3.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Cline Solar Farm, LLC | Cline Solar, LLC | Hildebran, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Aug 2017 | Dec 2024 | Solar |
| High Shoals Hydro (NC) | Central Rivers Power US, LLC | High Shoals, NC | Duke Energy Carolinas (DUK) | 3.7 GWh | Jun 1934 | Sep 2025 | Water |
| High Shoals PV1 | Pine Gate Renewables | High Shoals, NC | Duke Energy Carolinas (DUK) | 28.9 GWh | Mar 2022 | Dec 2024 | Solar |
| Ward WTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 110.0 MWh | Jan 1999 | Dec 2024 | Distillate Fuel Oil |
| Eastside WWTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 276.0 MWh | Jul 2004 | Dec 2024 | Distillate Fuel Oil |
| High Point, POLO | North Carolina Mun Power Agny #1 | High Point, NC | Duke Energy Carolinas (DUK) | 60.0 MWh | Oct 2007 | Dec 2024 | Distillate Fuel Oil |
| High Point, Pump Station Rd | North Carolina Mun Power Agny #1 | High Point, NC | Duke Energy Carolinas (DUK) | 61.0 MWh | Jun 2005 | Dec 2024 | Distillate Fuel Oil |
| Stikeleather Farm | Stikeleather Farm, LLC | Hiddenite, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Jul 2015 | Dec 2024 | Solar |
| Two Lines Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Feb 2013 | Dec 2024 | Solar |
| Dragstrip Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Sep 2014 | Dec 2024 | Solar |
| Two Mile Desert Project | Citizens Enterprises Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 28.1 GWh | May 2019 | Dec 2024 | Solar |
| Desert Wind Farm, LLC | Avangrid Power LLC | Hertford, NC | PJM Interconnection, LLC (PJM) | 528.1 GWh | Nov 2016 | Sep 2025 | Wind |
| Hertford Solar Farm | Duke Energy Renewables Services | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Dec 2015 | Dec 2024 | Solar |
| Sun Farm V, LLC | Greenbacker Renewable Energy Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Oct 2018 | Dec 2024 | Solar |
| Sun Farm VI, LLC | Greenbacker Renewable Energy Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 11.0 GWh | Oct 2018 | Dec 2024 | Solar |
| Alpha Value Solar | Alpha Value Solar, LLC | Hertford, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Innovative Solar 14, LLC | AES Distributed Energy | Hendersonville, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Jul 2014 | Dec 2024 | Solar |
| Innovative Solar 16 | Cypress Creek Renewables | Hendersonville, NC | Duke Energy Carolinas (DUK) | 3.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Sawtell Solar | Sawtell Solar, LLC | Hendersonville, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Mar 2021 | Sep 2024 | Solar |
| Stagecoach Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Apr 2015 | Dec 2024 | Solar |
| Kelly Solar, LLC | Altus Power America Management, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Jun 2018 | Dec 2024 | Solar |
| BearPond Solar Center LLC | BearPond Solar Center LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Southerland Farm Solar | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Spring Valley Farm 2, LLC | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Mar 2017 | Dec 2024 | Solar |
| Vicksburg Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Apr 2015 | Dec 2024 | Solar |
| Wortham Solar Farm | Cypress Creek Renewables | Henderson, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Aug 2016 | Dec 2024 | Solar |
| Dement Farm LLC | SRE Utility Solar 1, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Jul 2013 | Dec 2024 | Solar |
| Melinda Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jul 2015 | Dec 2024 | Solar |
| Martin Creek Farm LLC | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 5.6 GWh | Feb 2014 | Dec 2024 | Solar |
| Chatuge | Tennessee Valley Authority | Hayesville, NC | Tennessee Valley Authority (TVA) | 26.4 GWh | Nov 1954 | Dec 2024 | Water |
| Bakatsias Solar | Cypress Creek Renewables | Haw River, NC | Duke Energy Carolinas (DUK) | 7.8 GWh | Nov 2017 | Dec 2024 | Solar |
| Bay Tree | Cypress Creek Renewables | Harrells, NC | Duke Energy Progress East (CPLE) | 148.5 GWh | Oct 2021 | Sep 2025 | Solar |
| 1051 Lucky Solar, LLC | 1051 Lucky Solar, LLC | Hamptonville, NC | Duke Energy Carolinas (DUK) | 3.9 GWh | Apr 2021 | Dec 2024 | Solar |
| Ashley Solar Farm | Ashley Solar Farm, LLC | Hamptonville, NC | Duke Energy Carolinas (DUK) | 6.8 GWh | Feb 2015 | Dec 2024 | Solar |
| Quarter Horse Solar | Quarter Horse Farm LLC | Hampstead, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2018 | Dec 2024 | Solar |
| Hamlet Generating Facility | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 144.9 GWh | Nov 2007 | Dec 2024 | Natural Gas : 98.2% Distillate Fuel Oil : 1.8% |
| Sellers Farm Solar | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Apr 2022 | Dec 2024 | Solar |
| Sherwood H Smith Jr Energy Complex | Duke Energy Progress - (NC) | Hamlet, NC | Duke Energy Progress East (CPLE) | 10.1 TWh | Apr 2001 | Sep 2025 | Natural Gas : 99.9% |
| Hamlet Solar Energy Storage | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 550.0 MWh | Feb 2023 | Dec 2024 | Solar |
| Arba Solar Energy Storage | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Feb 2023 | Dec 2024 | Solar |
| ESA Hamlet NC , LLC | ESA Hamlet NC LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | May 2020 | Dec 2024 | Solar |
| Polk Farm | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | Feb 2022 | Dec 2024 | Solar |
| Sunflower Solar | Sunflower Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 28.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Carl Friedrich Gauss Solar | Heelstone Energy Holdings, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 5.7 GWh | Sep 2018 | Dec 2024 | Solar |
| HXNAir Solar One | HXNAir Solar One LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Roper Farm, LLC | Strata Manager, LLC | Grover, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | May 2015 | Dec 2024 | Solar |
| Exum Farm Solar, LLC | Cypress Creek Renewables | Grifton, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Kinston Solar | Cypress Creek Renewables | Grifton, NC | Duke Energy Progress East (CPLE) | 7.6 GWh | Jul 2015 | Dec 2024 | Solar |
| Buckleberry Solar | John Laing US Solar Corp. | Grifton, NC | Duke Energy Progress East (CPLE) | 97.4 GWh | Oct 2018 | Sep 2025 | Solar |
| Highland Solar Center LLC | SRE Utility Solar 1, LLC | Grifton, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2015 | Dec 2024 | Solar |
| DSM Pharmaceuticals | Patheon Manufacturing Service LLC | Greenville, NC | Duke Energy Progress East (CPLE) | 46.0 MWh | Jul 1987 | Dec 2024 | Distillate Fuel Oil |
| Rams Horn Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Nov 2014 | Dec 2024 | Solar |
| Flemming Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Penny Hill Solar | Cardinal Renewables | Greenville, NC | PJM Interconnection, LLC (PJM) | 3.7 GWh | Aug 2017 | Dec 2024 | Solar |
| DE Solar 657 Brigham Rd | Duke Energy Carolinas, LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 580.0 MWh | Mar 2010 | Sep 2024 | Solar |
| White Street Renewables | White Street Renewables LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 15.6 GWh | May 2019 | Dec 2024 | Landfill Gas : 60.2% Solar : 39.8% |
| Coogee Solar | Coogee Solar, LLC | Grantsboro, NC | Duke Energy Progress East (CPLE) | 11.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Blueberry One | Cypress Creek Renewables | Grantham, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Dec 2015 | Dec 2024 | Solar |
| Brighter Future Solar | Brighter Future Solar LLC | Granite Falls, NC | Duke Energy Carolinas (DUK) | 16.8 GWh | Dec 2021 | Dec 2024 | Solar |
| Grandy PV 1 | Ecoplexus, Inc | Grandy, NC | PJM Interconnection, LLC (PJM) | 29.2 GWh | Jan 2020 | Dec 2024 | Solar |
| Minnie Solar | Minnie Solar LLC | Graham, NC | Duke Energy Carolinas (DUK) | 5.3 GWh | Mar 2016 | Dec 2024 | Solar |
| Southwick Solar | Southwick Solar, LLC | Graham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Overman Solar | Overman Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Wedge | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.9 GWh | Mar 2021 | Dec 2024 | Solar |
| Ramp Solar, LLC | Ramp Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Cookstown | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress West (CPLW) | 10.3 GWh | Jan 2019 | Dec 2024 | Solar |
| Lane II Solar, LLC | USF Essex Lessor, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Jun 2020 | Dec 2024 | Solar |
| East Wayne Solar LLC | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Feb 2014 | Dec 2024 | Solar |
| Wayne Solar III LLC | Wayne Solar III, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 4.4 GWh | Jun 2014 | Dec 2024 | Solar |
| Wayne Solar II LLC | Wayne Solar II, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Jun 2014 | Dec 2024 | Solar |
| Jester Solar | Sol Systems | Goldsboro, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2020 | Dec 2024 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2013 | Dec 2024 | Solar |