Directory of Power Plants in Minnesota
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Inver Hills | Northern States Power Co - Minnesota | Inver Grove Heights, MN | Midcontinent Independent System Operator, Inc. (MISO) | 64.2 GWh | Mar 1972 | Dec 2024 | Natural Gas : 99.7% |
| Allen S King | Northern States Power Co - Minnesota | Oak Park Heights, MN | Midcontinent Independent System Operator, Inc. (MISO) | 721.3 GWh | Feb 1958 | Sep 2025 | Subbituminous Coal : 99.7% |
| Monticello Nuclear Facility | Northern States Power Co - Minnesota | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 TWh | May 1971 | Sep 2025 | Nuclear |
| Prairie Island | Northern States Power Co - Minnesota | Welch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 TWh | Jan 1974 | Sep 2025 | Nuclear |
| Red Wing | Northern States Power Co - Minnesota | Red Wing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 125.7 GWh | Sep 1949 | Sep 2025 | Non-biogenic Municipal Solid Waste : 52.4% Biogenic Municipal Solid Waste : 42.8% Wood/Wood Waste Solids : 4.0% Natural Gas : 0.8% |
| Riverside (MN) | Northern States Power Co - Minnesota | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 TWh | Mar 1987 | Sep 2025 | Natural Gas |
| Wilmarth | Northern States Power Co - Minnesota | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 99.9 GWh | Aug 1948 | Sep 2025 | Non-biogenic Municipal Solid Waste : 54.3% Biogenic Municipal Solid Waste : 44.4% Natural Gas : 1.3% |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 720.0 GWh | Apr 2021 | Sep 2025 | Wind |
| Sherburne County | Northern States Power Co - Minnesota | Becker, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 TWh | Mar 1976 | Sep 2025 | Subbituminous Coal : 99.9% |
| Sherco Solar I | Northern States Power Co - Minnesota | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 392.9 GWh | Sep 2024 | Sep 2025 | Solar |
| Sherco Solar II | Northern States Power Co - Minnesota | Becker, MN | Midcontinent Independent System Operator, Inc. (MISO) | 18.7 GWh | - | Sep 2025 | Solar |
| Northern Wind | Northern States Power Co - Minnesota | Lake Wilson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 369.5 GWh | Dec 2022 | Sep 2025 | Wind |
| Rock Aetna Power Partners | Northern States Power Co - Minnesota | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 82.3 GWh | Nov 2022 | Dec 2024 | Wind |
| Northern Lights Wind LLC | Northern Lights Wind LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2004 | Dec 2024 | Wind |
| North Star Solar Project | North Star Solar PV LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 181.0 GWh | Nov 2016 | Sep 2025 | Solar |
| North Branch (MN) | North Branch Water & Light Comm | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 300.0 MWh | Sep 2003 | Dec 2024 | Distillate Fuel Oil |
| Nobles 2 Wind Project | Nobles 2 Power Partners, LLC | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 946.0 GWh | Nov 2020 | Sep 2025 | Wind |
| New Ulm | New Ulm Public Utilities Comm | New Ulm, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 1956 | Dec 2024 | Natural Gas : 95.4% Distillate Fuel Oil : 4.6% |
| New Munich Solar | New Munich Solar LLC | Melrose, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2019 | Dec 2024 | Solar |
| New Germany Community Solar Garden | New Germany Solar I LLC | New Germany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2018 | Dec 2024 | Solar |
| Sacred Heart CSG1, LLC | Nautilus Solar Solutions | Sacred Heart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2021 | Dec 2024 | Solar |
| Paynesville CSG1, LLC | Nautilus Solar Solutions | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Stewart CSG1, LLC | Nautilus Solar Solutions | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2021 | Dec 2024 | Solar |
| Lowry CSG2, LLC | Nautilus Solar Solutions | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Buffalo Lake CSG1, LLC | Nautilus Solar Solutions | Buffalo Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jul 2021 | Dec 2024 | Solar |
| Plato CSG1, LLC | Nautilus Solar Solutions | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Nautilus Winsted Solar (CSG) | Nautilus Solar Solutions | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Mar 2019 | Sep 2025 | Solar |
| Nautilus Saint Cloud Solar (CSG) | Nautilus Solar Solutions | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Mar 2019 | Sep 2025 | Solar |
| Brooten CSG1, LLC | Nautilus Solar Solutions | Brooten, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2021 | Dec 2024 | Solar |
| Nautilus Lindstrom Solar (CSG) | Nautilus Solar Solutions | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Feb 2019 | Sep 2025 | Solar |
| SolarClub 30 (CSG) | Nautilus Solar Solutions | Eden Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2024 | Solar |
| SolarClub 10 LLC | Nautilus Solar Solutions | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 15 LLC | Nautilus Solar Solutions | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 20 LLC | Nautilus Solar Solutions | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 23 LLC | Nautilus Solar Solutions | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 28 LLC | Nautilus Solar Solutions | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 35 LLC | Nautilus Solar Solutions | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| SolarClub 03 | Nautilus Solar Solutions | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Louise Solar | National Grid Renewables | Taopi, MN | Midcontinent Independent System Operator, Inc. (MISO) | 82.6 GWh | Nov 2024 | Sep 2025 | Solar |
| Fillmore County Solar Project | National Grid Renewables | Spring Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 75.6 GWh | Nov 2024 | Sep 2025 | Solar |
| Marigold Community Solar Garden, LLC | National Grid Renewables | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Lindstrom Solar CSG | National Grid Renewables | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Mar 2018 | Dec 2024 | Solar |
| Leo Community Solar | National Grid Renewables | Hadley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Rengstorf Solar CSG | National Grid Renewables | Coutland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Honeysuckle Solar, LLC | National Grid Renewables | Lester Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2020 | Dec 2024 | Solar |
| Lantana Solar, LLC | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Hyacinth Solar, LLC | National Grid Renewables | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Coral Bells Solar, LLC | National Grid Renewables | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| Primrose Solar, LLC | National Grid Renewables | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Mar 2021 | Dec 2024 | Solar |
| Kerria Solar, LLC | National Grid Renewables | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Geranium Solar, LLC | National Grid Renewables | Raymond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| St. Cloud Solar CSG | National Grid Renewables | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Sagitta Community Solar | National Grid Renewables | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Camellia Solar, LLC | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Hydra Community Solar Garden, LLC (CSG) | National Grid Renewables | Dundas, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Kaus Community Solar | National Grid Renewables | Claremont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Deneb Community Solar | National Grid Renewables | Belgrade, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2024 | Solar |
| Crux Community Solar | National Grid Renewables | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Cassiopeia Community Solar | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Aquarius Community Solar | National Grid Renewables | Tracy, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2019 | Dec 2024 | Solar |
| Libra Community Solar | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2018 | Dec 2024 | Solar |
| Westport Community Solar, LLC | National Grid Renewables | Lake Lillian, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Canopus Community Solar | National Grid Renewables | Belgrade, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Auriga Community Solar | National Grid Renewables | Slayton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Acturus Community Solar | National Grid Renewables | Kasota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Aquila Community Solar | National Grid Renewables | Glenwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Allium Community Solar Garden, LLC | National Grid Renewables | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Aster Community Solar Garden, LLC | National Grid Renewables | Raymond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Capricornus Community Solar Garden | National Grid Renewables | Paynsville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2018 | Dec 2024 | Solar |
| Altair Community Solar Garden | National Grid Renewables | New Richmond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2019 | Dec 2024 | Solar |
| Johnson Solar CSG | National Grid Renewables | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Dec 2017 | Dec 2024 | Solar |
| Marmas Solar CSG | National Grid Renewables | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Mar 2018 | Dec 2024 | Solar |
| WasecaSun | National Grid Renewables | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.2 GWh | Jan 2018 | Dec 2024 | Solar |
| Kramer Solar CSG | National Grid Renewables | Hector, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Iris Solar, LLC (MN) | National Grid Renewables | Nicollet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Bellflower Solar, LLC | National Grid Renewables | Brooten, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2020 | Dec 2024 | Solar |
| DodgeSun CSG | National Grid Renewables | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Koppelman Sun CSG | National Grid Renewables | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Mud Garden Solar | Mud Garden LLC | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2024 | Solar |
| MSC-Scott01 LLC | MSC-Scott01 LLC | Jordan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jul 2019 | Dec 2024 | Solar |
| MSC-Scandia01 CSG | MSC-Scandia01 LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2019 | Dec 2024 | Solar |
| MSC-Rice01 LLC CSG | MSC-Rice01 LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jun 2019 | Dec 2024 | Solar |
| MSC-GreyCloud01 Community Solar | MSC-GreyCloud01 LLC | St. Paul Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| MSC-Empire01, LLC | MSC-Empire01, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| MSC-Chisago02 LLC | MSC-Chisago02 LLC | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jul 2019 | Dec 2024 | Solar |
| MSC-Chisago01 LLC CSG | MSC-Chisago01 LLC | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jun 2019 | Dec 2024 | Solar |
| Morgan Community Solar | Morgan Community Solar | Morgan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
| Moose Lake | Moose Lake Water & Light Comm | Moose Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 63.0 MWh | Oct 1952 | Dec 2024 | Distillate Fuel Oil : 83.7% Natural Gas : 16.3% |
| Montevideo Solar LLC, CSG | Montevideo Solar LLC | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.6 GWh | Dec 2018 | Dec 2024 | Solar |
| Equuleus Community Solar Gardens | MN8 Energy LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.2 GWh | Jul 2017 | Dec 2024 | Solar |
| Sherburne North Project CSG | MN Solar Community, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jun 2018 | Dec 2024 | Solar |
| MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
| MN CSG 2019-16 LLC | MN CSG 2019-16 LLC | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | May 2022 | Dec 2024 | Solar |
| Woodbury Solar | MN CSG 2, LLC | Woodbury, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Jun 2020 | Dec 2024 | Solar |
| B.R. Sauk Rapids CSG | Minnesota Solar CSG 9, LLC | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Oct 2017 | Dec 2024 | Solar |
| Carver Gladden CSG | Minnesota Solar CSG 8, LLC | Norwood Young America, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Mar 2018 | Dec 2024 | Solar |
| Montgomery Winsted CSG | Minnesota Solar CSG 4, LLC | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2017 | Dec 2024 | Solar |
| B.R. Sartell CSG | Minnesota Solar CSG 21, LLC | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
| B.R. Corcoran CSG | Minnesota Solar CSG 19, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Oct 2017 | Dec 2024 | Solar |
| Wright Cuddyer CSG | Minnesota Solar CSG 1, LLC | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Sep 2018 | Dec 2024 | Solar |