Directory of Power Plants in Illinois
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Dakota | Cypress Creek Renewables | Rock City, IL | PJM Interconnection, LLC (PJM) | 82.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Cass County Renewable Energy Center | Union Electric Co - (MO) | Beardstown, IL | Midcontinent Independent System Operator, Inc. (MISO) | 302.6 GWh | Nov 2024 | Oct 2025 | Solar |
| Boomtown Renewable Energy Center | Union Electric Co - (MO) | Carmi, IL | Midcontinent Independent System Operator, Inc. (MISO) | 271.2 GWh | Nov 2024 | Oct 2025 | Solar |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 43.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Machesney Park | Solar DG IL 1 LLC | Machesney Park, IL | PJM Interconnection, LLC (PJM) | 3.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Baldwin Solar BESS | Vistra Corp | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 131.6 GWh | Nov 2024 | Oct 2025 | Solar |
| Coffeen Solar BESS | Vistra Corp | Coffeen, IL | Midcontinent Independent System Operator, Inc. (MISO) | 79.9 GWh | Nov 2024 | Oct 2025 | Solar |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 60.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 48.0 MWh | Nov 2024 | Dec 2024 | Solar |
| 9521 US 14 SOLAR 1, LLC | Generate Capital | Harvard, IL | PJM Interconnection, LLC (PJM) | 25.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 6.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Kankakee Solar 3 | Pivot Energy | Manteno, IL | Midcontinent Independent System Operator, Inc. (MISO) | 107.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Wolf Run Solar | Wolf Run Solar LLC | Chapin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 310.7 GWh | Oct 2024 | Oct 2025 | Solar |
| N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 138.0 MWh | Oct 2024 | Dec 2024 | Solar |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2024 | Dec 2024 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2024 | Dec 2024 | Solar |
| Mulberry Solar, LLC | Reactivate | Granite City, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Oct 2024 | Dec 2024 | Solar |
| Monee Solar 1, LLC | Reactivate | Peotone, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Oct 2024 | Dec 2024 | Solar |
| Gooseberry Solar, LLC | Reactivate | Ford Heights, IL | PJM Interconnection, LLC (PJM) | 1.0 GWh | Oct 2024 | Dec 2024 | Solar |
| Walldog | Cypress Creek Renewables | Pontiac, IL | PJM Interconnection, LLC (PJM) | 210.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Double Back Diamond | Double Back Diamond Solar Power, LLC | Virden, IL | Midcontinent Independent System Operator, Inc. (MISO) | 933.4 GWh | Oct 2024 | Oct 2025 | Solar |
| Maple Flats | Invenergy Services LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 468.8 GWh | Oct 2024 | Oct 2025 | Solar |
| Kimmel Road Solar, LLC | Birch Creek Power, LLC | Du Quoin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 101.6 GWh | Sep 2024 | Oct 2025 | Solar |
| Galt | Cypress Creek Renewables | Sterling, IL | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2024 | Dec 2024 | Solar |
| Breezewood | Cypress Creek Renewables | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 732.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Hickory Solar | Hickory Solar LLC | Jerseyville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 249.4 GWh | Aug 2024 | Oct 2025 | Solar |
| Pontiac 1A | Solar DG IL 3 LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jul 2024 | Dec 2024 | Solar |
| Trinity Freeport | Generate Capital | Freeport, IL | PJM Interconnection, LLC (PJM) | 960.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
| St. Clair Solar 3 | Pivot Energy | Washington Park, IL | Midcontinent Independent System Operator, Inc. (MISO) | 158.0 MWh | May 2024 | Dec 2024 | Solar |
| Putnam Solar 1B | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2024 | Dec 2024 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
| Sand Prairie Solar | DG Sand Prairie, LLC | Green Valley, IL | PJM Interconnection, LLC (PJM) | 136.0 MWh | Apr 2024 | Dec 2024 | Solar |
| Kankakee Solar 1 | Pivot Energy | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Putnam Solar 1 | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Apr 2024 | Dec 2024 | Solar |
| Marion Solar 4b LLC | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 970.0 MWh | Apr 2024 | Dec 2024 | Solar |
| Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Cedarville (IL) | Generate Capital | Freeport, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Apr 2024 | Dec 2024 | Solar |
| Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2024 | Dec 2024 | Solar |
| DG Harlem Solar | DG Harlem, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2024 | Dec 2024 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2024 | Dec 2024 | Solar |
| Earp Solar, LLC | Birch Creek Power, LLC | Monmouth, IL | Midcontinent Independent System Operator, Inc. (MISO) | 73.8 GWh | Mar 2024 | Oct 2025 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2023 | Dec 2024 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2024 | Solar |
| River Ferry Solar 1 | River Ferry Solar 1, LLC | West Union, IL | PJM Interconnection, LLC (PJM) | 299.8 GWh | Nov 2023 | Oct 2025 | Solar |
| Moraine Sands Wind Power | Moraine Sands Wind Power, LLC | Mason City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 574.4 GWh | Nov 2023 | Oct 2025 | Wind |
| Midland Wind | Avangrid Power LLC | Kewane, IL | PJM Interconnection, LLC (PJM) | 343.2 GWh | Nov 2023 | Oct 2025 | Wind |
| Prairie Creek Solar | Sol Systems | Jacksonville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 57.9 GWh | Oct 2023 | Oct 2025 | Solar |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Oct 2023 | Dec 2024 | Solar |
| High Point Solar LLC | Acciona Energy USA Global, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 189.6 GWh | Oct 2023 | Oct 2025 | Solar |
| Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 333.6 GWh | Sep 2023 | Oct 2025 | Wind |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2024 | Solar |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Sep 2023 | Dec 2024 | Solar |
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2024 | Solar |
| SV CSG Barrass Farms II LL | SV CSG Barrass Farms II LLC | Marion, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Aug 2023 | Dec 2024 | Solar |
| SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2023 | Dec 2024 | Solar |
| CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 6.2 TWh | May 2023 | Oct 2025 | Natural Gas |
| Ahern Community Solar I, LLC | Ahern Community Solar I, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Apr 2023 | Dec 2024 | Solar |
| Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 554.0 GWh | Apr 2023 | Oct 2025 | Wind |
| Invenergy Nelson Expansion LLC | Invenergy Services LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 791.1 GWh | Mar 2023 | Oct 2025 | Natural Gas |
| Briscoe 2A | 7th Road Solar 2, LLC (Briscoe 2A) | Lostant, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Jan 2023 | Dec 2024 | Solar |
| Briscoe 1A | 7th Road Solar 1, LLC (Briscoe 1A) | Tonica, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2023 | Dec 2024 | Solar |
| Elba Solar LLC | Elba Solar LLC | Williamsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Jan 2023 | Dec 2024 | Solar |
| DePue Holdings, LLC | DePue Holdings, LLC | DePue, IL | Midcontinent Independent System Operator, Inc. (MISO) | 37.1 GWh | Jan 2023 | Dec 2024 | Solar |
| Amazon MDW7 Solar Project | Solar Star Prime 6, LLC | Monee, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Oct 2022 | Dec 2024 | Solar |
| Kankakee 2 | Kankakee Solar 2 LLC | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Big River Solar | Big River Solar, LLC | Norris City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 315.4 GWh | Jul 2022 | Oct 2025 | Solar |
| USS Goodrich Solar | Standard Solar | Bonfield, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Mulligan Solar, LLC | Mulligan Solar | Broadwell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 154.2 GWh | Jun 2022 | Oct 2025 | Solar |
| Cattail (CSG) | Cattail Solar, LLC | Fulton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | May 2022 | Dec 2024 | Solar |
| Jackson Generation, LLC | Jackson Generation, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 7.7 TWh | Apr 2022 | Oct 2025 | Natural Gas |
| USS Sycamore Solar (CSG) | Standard Solar | Sycamore, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Apr 2022 | Dec 2024 | Solar |
| Slidematic at Rockford | Luminace Solar Illinois 2, LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Feb 2022 | Dec 2024 | Solar |
| OE IL Solar 3 | OE IL Solar 3, LLC | Oregon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Feb 2022 | Dec 2024 | Solar |
| French Road Solar II | French Road Solar II, LLC | Burlington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Feb 2022 | Dec 2024 | Solar |
| Pretzel CSG | Pretzel Solar, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Feb 2022 | Jun 2024 | Solar |
| Ford County Wind Farm LLC | Ford Ridge | Ford County, IL | Midcontinent Independent System Operator, Inc. (MISO) | 467.3 GWh | Feb 2022 | Oct 2025 | Wind |
| IL17021 Brush Creek I CSG | SPG IL Brush Creek I Solar LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Feb 2022 | Dec 2024 | Solar |
| Mendota Rich Dev CSG | 42nd Road Solar LLC | Mendota, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| Sapphire Sky Wind Energy LLC | Invenergy Services LLC | Farmer City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 937.2 GWh | Nov 2021 | Oct 2025 | Wind |
| SCS Galena 012589 Peoria, LLC | Arevon Energy, Inc. | Peoria, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Abel Solar | SoCore Energy LLC | Morrison, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2021 | Dec 2024 | Solar |
| Rockford CSG | Rockford Baxter Rd Holdco LLC CSG | Rockford, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2021 | Dec 2024 | Solar |
| Rockford Solar | Rockford Solar, LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
| JM Huber at Quincy | Luminace Solar Illinois 2, LLC | Quincy, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Dodds (CSG) | Dodds Solar, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Gala (CSG) | Gala Solar, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2021 | Nov 2024 | Solar |
| Woodlawn II (CSG) | Woodlawn Solar II, LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Ameresco Danville Solar, LLC | Greenbacker Renewable Energy Corporation | Tilton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Glacier Sands Wind Power, LLC | Glacier Sands Wind Power, LLC | Mason City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 635.5 GWh | Oct 2021 | Oct 2025 | Wind |
| Round Grove 2 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Lincoln Land Wind | Lincoln Land Wind, LLC | TBD, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 TWh | Oct 2021 | Oct 2025 | Wind |
| Round Grove 1 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Oct 2021 | Dec 2024 | Solar |
| Prairie Wolf Solar LLC | National Grid Renewables | Ashmore Township, IL | Midcontinent Independent System Operator, Inc. (MISO) | 376.2 GWh | Oct 2021 | Oct 2025 | Solar |
| Bunker Hill Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Oct 2021 | Dec 2024 | Solar |
| Solar Star Urbana Landfill Central | Solar Star Urbana Landfill Central, LLC | Urbana, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Oct 2021 | Dec 2024 | Solar |
| SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Segunda II (CSG) | Segunda Solar II, LLC | Streator, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Oct 2021 | Dec 2024 | Solar |