Directory of Electric Companies in the United States
| Company Name | Company Location | Utility Type | Power Plants | EIA Annual Generation | EIA Latest Generation | FERC Lastest Date | FERC 2025Q2 Seller Transactions | FERC 2025Q2 Buyer Transactions |
|---|---|---|---|---|---|---|---|---|
| Town Of Munster | Munster, IN | Municipally-Owned Utility | 1 | 4.0 GWh | Dec 2024 | - | ||
| Middle Tennessee State University | Murfreesboro, TN | Commercial | 1 | 36.9 GWh | May 2026 | - | ||
| City Of Murray - (Ut) | Murray, UT | Municipally-Owned Utility | 3 | 12.1 GWh | Dec 2025 | - | ||
| Board Of Water Electric & Communications | Muscatine, IA | Municipally-Owned Utility | 1 | 820.2 GWh | May 2026 | - | ||
| Lorin Industries | Muskegon, MI | Industrial | 1 | 4.6 GWh | Dec 2025 | - | ||
| Georgia-Pacific Muskogee LLC | Muskogee, OK | Industrial | 1 | 385.6 GWh | May 2026 | - | ||
| Runway Solar Farm | Myrtle Beach, SC | State-Owned Utility | 1 | 3.7 GWh | Dec 2025 | - | ||
| Emerald City Renewables LLC | N.W., DC | - | - | - | Sep 2025 | $632.21k | ||
| East Texas Electric Coop, Inc | Nacogdoches, TX | Cooperative | 3 | 421.0 GWh | May 2026 | Oct 2025 | $7.38M | |
| Naknek Electric Assn, Inc | Naknek, AK | Cooperative | 1 | 23.6 GWh | Dec 2025 | - | ||
| Nalco Co | Naperville, IL | Independent Power Producer | 1 | 21.6 GWh | Dec 2024 | - | ||
| Celanese Acetate LLC | Narrows, VA | Industrial | 1 | 170.5 GWh | May 2026 | - | ||
| City Of Nashua - (NH) | Nashua, NH | Municipally-Owned Utility | 1 | 9.7 GWh | Dec 2025 | - | ||
| Cumberland Land Holdings, LLC | Nashville, TN | Independent Power Producer | 1 | 27.0 GWh | Dec 2025 | - | ||
| Gaylord Entertainment Co | Nashville, TN | Commercial | 1 | 21.1 GWh | May 2026 | - | ||
| Hattiesburg Farm, LLC | Nashville, TN | Independent Power Producer | 1 | 95.7 GWh | May 2026 | Sep 2025 | $1.41M | |
| Haywood Solar, SMLLC | Nashville, TN | Independent Power Producer | 1 | 6.3 GWh | May 2026 | - | ||
| Lancaster Solar Ga, LLC | Nashville, TN | Independent Power Producer | 1 | 198.0 GWh | May 2026 | Sep 2025 | $1.27M | |
| Mas Durham Power, LLC | Nashville, TN | Independent Power Producer | 1 | 10.8 GWh | Dec 2024 | - | ||
| Nashville Electric Service | Nashville, TN | Municipally-Owned Utility | 1 | 2.6 GWh | Dec 2025 | - | ||
| ODOM Solar, LLC | Nashville, TN | Independent Power Producer | 1 | 47.2 GWh | Dec 2025 | Sep 2025 | $355.09k | |
| Providence Solar Center, LLC | Nashville, TN | Independent Power Producer | 1 | 33.9 GWh | May 2026 | - | ||
| Russellville Solar LLC | Nashville, TN | - | - | - | Sep 2025 | $2.18M | ||
| Selmer North Solar I, LLC | Nashville, TN | Independent Power Producer | 1 | 31.3 GWh | May 2026 | - | ||
| Selmer North Solar II, LLC | Nashville, TN | Independent Power Producer | 1 | 16.8 GWh | May 2026 | - | ||
| Simon Solar Farm, LLC | Nashville, TN | Independent Power Producer | 1 | 53.4 GWh | Dec 2025 | Sep 2025 | $1.73M | |
| SR Ailey, LLC | Nashville, TN | Independent Power Producer | 1 | 202.2 GWh | May 2026 | Sep 2025 | $1.74M | |
| SR Arlington II, LLC | Nashville, TN | - | - | - | Sep 2025 | $1.75M | ||
| SR Arlington II MT, LLC | Nashville, TN | Independent Power Producer | 1 | 245.7 GWh | May 2026 | - | ||
| SR Arlington, LLC | Nashville, TN | Independent Power Producer | 1 | 48.8 GWh | Dec 2025 | Sep 2025 | $421.27k | |
| SR Baxley, LLC | Nashville, TN | Independent Power Producer | 1 | 60.9 GWh | May 2026 | Sep 2025 | $436.50k | |
| SR Bell Buckle, LLC | Nashville, TN | Independent Power Producer | 1 | 77.8 GWh | May 2026 | Sep 2025 | $417.67k | |
| SR Blount, LLC | Nashville, TN | Independent Power Producer | 1 | 707.0 MWh | Dec 2025 | - | ||
| SR Bolivar, LLC | Nashville, TN | Independent Power Producer | 1 | 7.0 GWh | Dec 2025 | - | ||
| SR Brownsville, LLC | Nashville, TN | Independent Power Producer | 1 | 1.9 GWh | Dec 2025 | - | ||
| SR Byhalia, LLC | Nashville, TN | Independent Power Producer | 1 | 10.3 GWh | Dec 2025 | - | ||
| SR Camden, LLC | Nashville, TN | Independent Power Producer | 1 | 28.2 GWh | May 2026 | - | ||
| SR Canadaville, LLC | Nashville, TN | Independent Power Producer | 1 | 36.8 GWh | Dec 2025 | Sep 2025 | $298.26k | |
| SR Cedar Springs, LLC | Nashville, TN | Independent Power Producer | 1 | 182.3 GWh | May 2026 | Sep 2025 | $1.29M | |
| SR Christiana, LLC | Nashville, TN | Independent Power Producer | 1 | 2.7 GWh | Dec 2025 | - | ||
| SR Clarksville II, LLC | Nashville, TN | Independent Power Producer | 1 | 10.4 GWh | Dec 2025 | - | ||
| SR Clarksville, LLC | Nashville, TN | Independent Power Producer | 1 | 4.4 GWh | Dec 2025 | - | ||
| SR Clay, LLC | Nashville, TN | Independent Power Producer | 1 | 256.4 GWh | May 2026 | Sep 2025 | $2.19M | |
| SR Clinch, LLC | Nashville, TN | Independent Power Producer | 2 | 18.6 GWh | Dec 2025 | - | ||
| SR Desoto I, LLC | Nashville, TN | Independent Power Producer | 1 | 323.2 GWh | May 2026 | Sep 2025 | $2.38M | |
| SR Desoto II, LLC | Nashville, TN | Independent Power Producer | 1 | 168.4 GWh | May 2026 | Sep 2025 | $1.48M | |
| SR Desoto III, LLC | Nashville, TN | Independent Power Producer | 1 | 148.9 GWh | May 2026 | Sep 2025 | $1.52M | |
| SR Enterprise South, LLC | Nashville, TN | Independent Power Producer | 1 | 12.5 GWh | May 2026 | - | ||
| SR Forked Deer, LLC | Nashville, TN | Independent Power Producer | 1 | 283.0 MWh | Dec 2025 | - | ||
| SR Franklin, LLC | Nashville, TN | Independent Power Producer | 1 | 5.5 GWh | Dec 2025 | - | ||
| SR Greenville I, LLC | Nashville, TN | Independent Power Producer | 1 | 10.6 GWh | Dec 2025 | - | ||
| SR Greenville II, LLC | Nashville, TN | Independent Power Producer | 1 | 10.1 GWh | Dec 2025 | - | ||
| SR Hazlehurst III, LLC | Nashville, TN | Independent Power Producer | 1 | 79.6 GWh | May 2026 | Sep 2025 | $861.87k | |
| SR Hazlehurst, LLC | Nashville, TN | Independent Power Producer | 1 | 32.7 GWh | Dec 2025 | Sep 2025 | $636.71k | |
| SR Houston Holdings, LLC | Nashville, TN | Independent Power Producer | 1 | 1.8 GWh | May 2026 | - | ||
| SR Innovation, LLC | Nashville, TN | Independent Power Producer | 1 | 3.7 GWh | Dec 2025 | - | ||
| SR Jackson II, LLC | Nashville, TN | Independent Power Producer | 1 | 2.3 GWh | Dec 2025 | - | ||
| SR Jenkins, LLC | Nashville, TN | Independent Power Producer | 1 | 32.1 GWh | Dec 2025 | - | ||
| SR Jonesborough II, LLC | Nashville, TN | Independent Power Producer | 1 | 8.2 GWh | May 2026 | - | ||
| SR Kersey II, LLC | Nashville, TN | Independent Power Producer | 1 | 2.1 GWh | Dec 2025 | - | ||
| SR Kersey, LLC | Nashville, TN | Independent Power Producer | 1 | 7.5 GWh | Dec 2025 | - | ||
| SR Lambert I, LLC | Nashville, TN | Independent Power Producer | 1 | 105.9 GWh | May 2026 | - | ||
| SR Lambert II, LLC | Nashville, TN | Independent Power Producer | 1 | 107.4 GWh | May 2026 | - | ||
| SR Litchfield, LLC | Nashville, TN | Independent Power Producer | 1 | 26.4 GWh | Dec 2025 | Sep 2025 | $420.40k | |
| SR Lumpkin, LLC | Nashville, TN | Independent Power Producer | 1 | 236.1 GWh | May 2026 | Sep 2025 | $1.66M | |
| SR Marion, LLC | Nashville, TN | Independent Power Producer | 1 | 2.7 GWh | Dec 2025 | - | ||
| SR Mavericks, LLC | Nashville, TN | Independent Power Producer | 1 | 15.5 GWh | Dec 2025 | - | ||
| SR McKellar, LLC | Nashville, TN | Independent Power Producer | 1 | 144.3 GWh | May 2026 | Sep 2025 | $793.18k | |
| SR McNeal, LLC | Nashville, TN | Independent Power Producer | 1 | 59.5 GWh | May 2026 | Sep 2025 | $503.70k | |
| SR Meridian II, LLC | Nashville, TN | Independent Power Producer | 1 | 7.0 GWh | May 2026 | - | ||
| SR Meridian III, LLC | Nashville, TN | Independent Power Producer | 1 | 130.4 GWh | May 2026 | Sep 2025 | $1.57M | |
| SR Millington II, LLC | Nashville, TN | Independent Power Producer | 1 | 17.3 GWh | May 2026 | - | ||
| SR Millington, LLC | Nashville, TN | Independent Power Producer | 1 | 104.5 GWh | May 2026 | Sep 2025 | $1.07M | |
| SR Monroe, LLC | Nashville, TN | Independent Power Producer | 1 | 1.9 GWh | Dec 2025 | - | ||
| SR North Stonington, LLC | Nashville, TN | Independent Power Producer | 1 | 15.6 GWh | Dec 2025 | - | ||
| SR Panola I, LLC | Nashville, TN | Independent Power Producer | 1 | 10.9 GWh | Dec 2025 | - | ||
| SR Panola II, LLC | Nashville, TN | Independent Power Producer | 1 | 6.9 GWh | Dec 2025 | - | ||
| SR Panola III, LLC | Nashville, TN | Independent Power Producer | 1 | 7.6 GWh | Dec 2025 | - | ||
| SR Paris, LLC | Nashville, TN | Independent Power Producer | 1 | 14.4 GWh | Dec 2025 | - | ||
| SR Perry, LLC | Nashville, TN | Independent Power Producer | 1 | 169.1 GWh | May 2026 | Sep 2025 | $1.40M | |
| SR Platte, LLC | Nashville, TN | Independent Power Producer | 1 | 35.5 GWh | Dec 2025 | Sep 2025 | $513.75k | |
| SR Rattlesnake, LLC | Nashville, TN | Independent Power Producer | 1 | 16.1 GWh | Dec 2025 | Sep 2025 | $191.84k | |
| SR Russellville, LLC | Nashville, TN | Independent Power Producer | 1 | 423.5 GWh | May 2026 | - | ||
| SR Skylark B, LLC | Nashville, TN | Independent Power Producer | 1 | 1.4 GWh | Dec 2025 | - | ||
| SR Skylark C, LLC | Nashville, TN | Independent Power Producer | 1 | 2.0 GWh | Dec 2025 | - | ||
| SR Snipesville II, LLC | Nashville, TN | Independent Power Producer | 1 | 265.1 GWh | May 2026 | Sep 2025 | $1.86M | |
| SR Snipesville III, LLC | Nashville, TN | Independent Power Producer | 1 | 273.3 GWh | May 2026 | Sep 2025 | $2.58M | |
| SR Snipesville, LLC | Nashville, TN | Independent Power Producer | 1 | 216.7 GWh | May 2026 | Sep 2025 | $2.22M | |
| SR South Loving, LLC | Nashville, TN | Independent Power Producer | 1 | 49.9 GWh | May 2026 | Sep 2025 | $1.45M | |
| SR Terrell, LLC | Nashville, TN | Independent Power Producer | 1 | 179.3 GWh | May 2026 | Sep 2025 | $1.78M | |
| SR Toombs I, LLC | Nashville, TN | Independent Power Producer | 1 | 618.1 GWh | May 2026 | - | ||
| SR Toombs, LLC | Nashville, TN | - | - | - | Sep 2025 | $6.22M | ||
| SR Trenton, LLC | Nashville, TN | Independent Power Producer | 1 | 455.0 MWh | Dec 2025 | - | ||
| SR Trezevant, LLC | Nashville, TN | Independent Power Producer | 1 | 3.9 GWh | Dec 2025 | - | ||
| SR Turkey Creek, LLC | Nashville, TN | Independent Power Producer | 1 | 116.9 GWh | May 2026 | Sep 2025 | $994.09k | |
| SR Warren, LLC | Nashville, TN | Independent Power Producer | 1 | 7.2 GWh | Dec 2025 | - | ||
| SR Washington I, LLC | Nashville, TN | Independent Power Producer | 1 | 20.7 GWh | Dec 2025 | - | ||
| SR White Pine, LLC | Nashville, TN | Independent Power Producer | 1 | 4.6 GWh | Dec 2025 | - | ||
| Sunraycer Assets I LLC | Nashville, TN | Independent Power Producer | 8 | 93.1 GWh | May 2026 | - | ||
| USCE-Nashville District | Nashville, TN | Federally-Owned Utility | 9 | 3.4 TWh | Dec 2025 | - |
Top Power Plants in United States
| Plant | Location | Annual Generation | Initial Operation Date | Last Update | Fuel Types |
|---|---|---|---|---|---|
| Arkansas Nuclear One | Russellville, Arkansas | 14 TWh | Nov 1974 | May 2026 | Nuclear |
| Barry | Bucks, Alabama | 12 TWh | Jan 1954 | May 2026 | Natural Gas : 97.1% Bituminous Coal : 2.9% |
| Beaver Valley | Shippingport, Pennsylvania | 15 TWh | Aug 1976 | May 2026 | Nuclear |
| Bowen | Cartersville, Georgia | 13 TWh | Sep 1971 | May 2026 | Bituminous Coal : 99.8% |
| Braidwood Generation Station | Braceville, Illinois | 20 TWh | Jun 1988 | May 2026 | Nuclear |
| Browns Ferry | Decatur, Alabama | 31 TWh | Jul 1974 | May 2026 | Nuclear |
| Brunswick Nuclear | Southport, North Carolina | 15 TWh | Oct 1975 | May 2026 | Nuclear |
| Byron Generating Station | Byron, Illinois | 20 TWh | Aug 1985 | May 2026 | Nuclear |
| Calvert Cliffs Nuclear Power Plant | Lusby, Maryland | 15 TWh | Apr 1975 | May 2026 | Nuclear |
| Catawba | York, South Carolina | 18 TWh | May 1985 | May 2026 | Nuclear |
| Comanche Peak | Glen Rose, Texas | 20 TWh | Jul 1990 | May 2026 | Nuclear |
| Crystal River | Crystal River, Florida | 16 TWh | Sep 1966 | May 2026 | Natural Gas : 68.9% Bituminous Coal : 30.9% |
| Diablo Canyon | Avila Beach, California | 18 TWh | Apr 1985 | May 2026 | Nuclear |
| Donald C Cook | Bridgman, Michigan | 19 TWh | Jul 1975 | May 2026 | Nuclear |
| Dresden Generating Station | Morris, Illinois | 15 TWh | Jul 1970 | May 2026 | Nuclear |
| Edwin I Hatch | Baxley, Georgia | 14 TWh | Nov 1975 | May 2026 | Nuclear |
| Gavin Power, LLC | Cheshire, Ohio | 13 TWh | Sep 1974 | May 2026 | Bituminous Coal : 99.6% |
| Grand Coulee | Grand Coulee, Washington | 18 TWh | Feb 1941 | May 2026 | Water |
| Guernsey Power Station | Byesville, Ohio | 12 TWh | Jan 2023 | May 2026 | Natural Gas |
| H Allen Franklin Combined Cycle | Smiths, Alabama | 12 TWh | May 2002 | May 2026 | Natural Gas |
| Jack McDonough | Smyrna, Georgia | 18 TWh | Apr 1971 | May 2026 | Natural Gas |
| James H Miller Jr | Quinton, Alabama | 19 TWh | Sep 1978 | May 2026 | Subbituminous Coal : 99.0% Natural Gas : 1.0% |
| Joseph M Farley | Columbia, Alabama | 15 TWh | Nov 1977 | May 2026 | Nuclear |
| Labadie | Labadie, Missouri | 15 TWh | May 1970 | May 2026 | Subbituminous Coal : 99.9% |
| LaSalle Generating Station | Marseilles, Illinois | 18 TWh | Dec 1983 | May 2026 | Nuclear |
| Limerick | Sanatoga, Pennsylvania | 19 TWh | Jan 1986 | May 2026 | Nuclear |
| McGuire | Huntersville, North Carolina | 19 TWh | Aug 1981 | May 2026 | Nuclear |
| Millstone | Waterford, Connecticut | 17 TWh | Nov 1975 | May 2026 | Nuclear |
| Monroe (MI) | Monroe, Michigan | 16 TWh | Oct 1969 | May 2026 | Subbituminous Coal : 75.2% Bituminous Coal : 15.7% Petroleum Coke : 8.9% |
| Nine Mile Point Nuclear Station | Lycoming, New York | 16 TWh | Nov 1969 | May 2026 | Nuclear |
| North Anna | Mineral, Virginia | 16 TWh | May 1978 | May 2026 | Nuclear |
| Oak Grove (TX) | Franklin, Texas | 12 TWh | Mar 2010 | May 2026 | Lignite Coal : 99.1% Natural Gas : 0.9% |
| Oconee | Seneca, South Carolina | 22 TWh | Jun 1973 | May 2026 | Nuclear |
| Palo Verde | Wintersburg, Arizona | 31 TWh | Dec 1985 | May 2026 | Nuclear |
| Peach Bottom | Delta, Pennsylvania | 22 TWh | Jun 1974 | May 2026 | Nuclear |
| Prairie State Generating Station | Marissa, Illinois | 12 TWh | May 2012 | May 2026 | Bituminous Coal : 99.8% |
| PSEG Salem Generating Station | Hancocks Bridge, New Jersey | 19 TWh | May 1971 | May 2026 | Nuclear |
| Quad Cities Generating Station | Cordova, Illinois | 15 TWh | Nov 1972 | May 2026 | Nuclear |
| Robert Moses Niagara | Lewiston, New York | 14 TWh | Dec 1960 | May 2026 | Water |
| Sequoyah | Soddy Daisy, Tennessee | 17 TWh | Jun 1981 | May 2026 | Nuclear |
| South Texas Project | Wadsworth, Texas | 21 TWh | Jul 1988 | May 2026 | Nuclear |
| St Lucie | Jensen Beach, Florida | 15 TWh | Apr 1976 | May 2026 | Nuclear |
| Surry | Surry, Virginia | 12 TWh | Nov 1972 | May 2026 | Nuclear |
| TalenEnergy Susquehanna | Berwick, Pennsylvania | 19 TWh | May 1983 | May 2026 | Nuclear |
| Turkey Point | Homestead, Florida | 20 TWh | Mar 1967 | May 2026 | Nuclear : 64.2% Natural Gas : 35.8% |
| Union Power Station | El Dorado, Arkansas | 12 TWh | Dec 2002 | May 2026 | Natural Gas |
| Vogtle | Waynesboro, Georgia | 37 TWh | Apr 1987 | May 2026 | Nuclear |
| W A Parish | Thompsons, Texas | 14 TWh | May 1958 | May 2026 | Subbituminous Coal : 81.6% Natural Gas : 18.4% |
| Watts Bar Nuclear Plant | Spring City, Tennessee | 20 TWh | Apr 1996 | May 2026 | Nuclear |
| West County Energy Center | Loxahatchee, Florida | 18 TWh | Jul 2009 | May 2026 | Natural Gas |