Tenaska Georgia Generation Facility
2100 George Brown Road, Franklin, GA 30217Plant Summary Information
Tenaska Georgia Generation Facility is ranked #22 out of 46 natural gas power plants in Georgia in terms of total annual net electricity generation.
Tenaska Georgia Generation Facility is comprised of 6 generators and generated 249.0 MWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Tenaska Georgia Generation Facility |
|---|---|
| Utility Name | Tenaska Georgia Partners LP |
| Location | Heard County, GA |
| Initial Operation Date | June 2001 |
| Last Update | Nov 2025 |
| Annual Generation | 82.6 GWh |
| Annual Consumption | 911.1 k MMBtu |
| Ranked #3,643 out of 12,613 Power Plants Nationwide | |
| Ranked #962 out of 2,246 Natural Gas Power Plants Nationwide | |
| Ranked #92 out of 251 Georgia Power Plants | |
| Ranked #22 out of 46 Georgia Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
Map of Tenaska Georgia Generation Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tenaska Georgia Generation Facility.
Monthly Net Generation for Tenaska Georgia Generation Facility
Monthly Plant Fuel Consumption for Tenaska Georgia Generation Facility
Tenaska Georgia Generation Facility Details
| Summary Information | |
|---|---|
| Plant Name | Tenaska Georgia Generation Facility (55061) |
| Plant Address | 2100 George Brown Road, Franklin, GA 30217 |
| Utility | Tenaska Georgia Partners LP (18535) |
| Latitude, Longitude | 33.3516, -84.9996 |
| Generation Dates on File | Jun 2001 to Nov 2025 |
| Initial Operation Date | June 2001 |
| Annual Generation | 82.6 GWh |
| Fuel Types | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 99-160-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Heard County Water Authority |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | Other - Please explain in pipeline notes below. |
| Pipeline Notes | WILLIAMS TRANSCONTINENTAL |
| Natural Gas Storage | No |
Generator GTG1 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG3 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG2 Details Operating August 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG4 Details Operating June 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG5 Details Operating June 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG6 Details Operating June 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | SOCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SOCO |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157.5 MW |
| Winter Capacity | 157.5 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Natural Gas | 157.5 MW |
| Net Winter Capacity With Oil | 165.8 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Tenaska Georgia Generation Facility Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.35% |
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.35% |
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.35% |
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG4 | 0.35% |
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG5 | 0.35% |
| Tenaska Georgia I LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 99.00% |
| Tenaska Georgia Inc | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.35% |
| Diamond Georgia LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.30% |
| Georgia TC GP LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG6 | 0.35% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #952 | Pinckneyville | Pinckneyville, IL | 79.8 GWh |
| #953 | Sky Global Power One | Rock Island, TX | 79.7 GWh |
| #954 | WestRock (TX) | Evadale, TX | 415.2 GWh |
| #955 | Phillips 66 Rodeo Refinery | Rodeo, CA | 291.0 GWh |
| #956 | Marshalltown | Marshalltown, IA | 79.0 GWh |
| #957 | Archer Daniels Midland Peoria | Peoria, IL | 78.7 GWh |
| #958 | Ford Utilities Center | Albuquerque, NM | 78.4 GWh |
| #959 | Glass House Camarillo Cultivation | Camarillo, CA | 77.9 GWh |
| #960 | International Paper Pine Hill Mill | Pine Hill, AL | 475.7 GWh |
| #961 | Jonesboro City Water & Light Plant | Jonesboro, AR | 78.0 GWh |
| #963 | Stony Brook | Ludlow, MA | 104.0 GWh |
| #964 | Dan E Karn | Essexville, MI | 82.6 GWh |
| #965 | Valencia Energy Facility | Belen, NM | 76.8 GWh |
| #966 | Generate Colchester Fuel Cells, LLC | Colchester, CT | 76.7 GWh |
| #967 | Pinelawn Power LLC | West Babylon, NY | 76.6 GWh |
| #968 | DeRidder Mill | DeRidder, LA | 402.4 GWh |
| #969 | Port Comfort Power LLC | Point Comfort, TX | 76.1 GWh |
| #970 | Biron Mill | Wisconsin Rapids, WI | 95.7 GWh |
| #971 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 178.7 GWh |
| #972 | UMCP CHP Plant | College Park, MD | 84.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tenaska Georgia Generation Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Atlanta Falcons Solar | Atlanta, GA | 1.1 GWh | 44.3 mi |
| Camp Solar Plant | Woodbury, GA | 3.9 GWh | 37.5 mi |
| Chattahoochee Energy Facility | Franklin, GA | 3.7 TWh | 4.5 mi |
| Greenville | Greenville, GA | 1.4 GWh | 26.8 mi |
| Harris Dam | Lineville, AL | 115.6 GWh | 36.2 mi |
| Harris Shiloh | Shiloh, GA | 4.3 GWh | 42.1 mi |
| Hawk Road Facility | Franklin, GA | 682.5 GWh | 0.7 mi |
| Jack McDonough | Smyrna, GA | 17.5 TWh | 44.4 mi |
| Kimberly-Clark Solar | LaGrange, GA | 3.8 GWh | 24.4 mi |
| LaFayette Solar Farm | LaFayette, AL | 164.9 GWh | 39.8 mi |
| MAS ASB Cogen Plant | Atlanta, GA | 38.1 GWh | 40.7 mi |
| Meriwether Jackson | Machester, GA | 6.3 GWh | 38.7 mi |
| Sewell Creek Energy | Cedartown, GA | 522.9 GWh | 44.2 mi |
| Troup RC50 | Pine Mountain, GA | 1.5 GWh | 32.7 mi |
| Troup RC50 II | Pine Mountain, GA | 3.0 GWh | 31.9 mi |
| Turnipseed Solar, LLC | Douglasville, GA | 5.3 GWh | 30.3 mi |
| Wansley Combined Cycle | Franklin, GA | 7.6 TWh | 4.4 mi |
| Wansley Unit 9 | Franklin, GA | 2.2 TWh | 4.6 mi |
| West Point (GA) | West Point, GA | 181.0 GWh | 31.9 mi |
| Yates | Newnan, GA | 2.1 TWh | 9.6 mi |