Mesa CSG 2 Massicotte
3411 C Road, Palisade, CO 81526Plant Summary Information
Mesa CSG 2 Massicotte is ranked #109 out of 153 solar farms in Colorado in terms of total annual net electricity generation.
Mesa CSG 2 Massicotte generated 605.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Mesa CSG 2 Massicotte |
---|---|
Utility Name | Standard Solar |
Location | Mesa County, CO |
Initial Operation Date | May 2019 |
Last Update | Dec 2024 |
Annual Generation | 3.3 GWh |
Annual Consumption | 12.0 k MMBtu |
Ranked #9,052 out of 12,299 Power Plants Nationwide | |
Ranked #4,014 out of 6,182 Solar Power Plants Nationwide | |
Ranked #220 out of 283 Colorado Power Plants | |
Ranked #109 out of 153 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Mesa CSG 2 Massicotte
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesa CSG 2 Massicotte.
Monthly Net Generation for Mesa CSG 2 Massicotte
Mesa CSG 2 Massicotte Details
Summary Information | |
---|---|
Plant Name | Mesa CSG 2 Massicotte (62718) |
Plant Address | 3411 C Road, Palisade, CO 81526 |
Utility | Standard Solar (60531) |
Latitude, Longitude | 39.04481, -108.41967 |
Generation Dates on File | May 2019 to Dec 2024 |
Initial Operation Date | May 2019 |
Annual Generation | 3.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator X0037 Details Operating May 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 2 MW |
Mesa CSG 2 Massicotte Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4004 | Powder Hill | Enfield, CT | 3.3 GWh |
#4005 | Expressway Solar C2 | Victorville, CA | 3.3 GWh |
#4006 | Ellerbe | Ellerbe, NC | 3.3 GWh |
#4007 | Salt Point Solar (Hybrid) | Poughkeepsie, NY | 3.3 GWh |
#4008 | Nashville Farms, LLC | Nashville, NC | 3.3 GWh |
#4009 | Monson Solar, LLC | Monson, MA | 3.3 GWh |
#4010 | PowerFin Kingsbery | Austin, TX | 3.3 GWh |
#4011 | Oak Hill Solar Array | Evansville, IN | 3.3 GWh |
#4012 | Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh |
#4013 | Lafayette Solar I, LLC | Shelby, NC | 3.3 GWh |
#4015 | Deer Creek PV | Marion, IN | 3.3 GWh |
#4016 | BlackRock-Matrix | South Brunswick, NJ | 3.3 GWh |
#4017 | Chester CSG | Chester, NY | 3.3 GWh |
#4018 | SR Jackson II | Jackson, TN | 3.3 GWh |
#4019 | Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh |
#4020 | Landau Solar | Kingston, NY | 3.3 GWh |
#4021 | Westmont 400A | Los Angeles, CA | 3.3 GWh |
#4022 | CDCR (CA) - Wasco State Prison | Wasco, CA | 3.3 GWh |
#4023 | Limelight Solar I, LLC | Spartanburg, SC | 3.3 GWh |
#4024 | Bogart Solar | Palenville, NY | 3.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesa CSG 2 Massicotte.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ash Mesa Solar, LLC | Olathe, CO | 19.3 GWh | 34.8 mi |
Drop 5 | Montrose, CO | 9.3 GWh | 55.1 mi |
Eagle Springs Solar LLC | Silt, CO | 1.5 GWh | 51 mi |
Fruita | Grand Junction, CO | 975.0 MWh | 18 mi |
Lower Molina | Molina, CO | 12.1 GWh | 22.6 mi |
Mesa CSG 1 Murdock | Grand Junction, CO | 3.8 GWh | 12.8 mi |
Mesa PV1 | Grand Junction, CO | 3.4 GWh | 5 mi |
Oak Leaf Solar XXXI LLC (CSG) | Debeque, CO | 3.4 GWh | 8.7 mi |
Oak Leaf Solar XXXII (CSG) | Rifle, CO | 2.8 GWh | 46.2 mi |
Pivot Solar 1 LLC (CSG) | Parachute, CO | 1.9 GWh | 31 mi |
Pivot Solar 3 LLC (CSG) | Parachute, CO | 3.6 GWh | 31 mi |
Pivot Solar 7 LLC (CSG) | Rifle, CO | 3.6 GWh | 46.2 mi |
Shavano Falls Hydro | Montrose, CO | 12.0 GWh | 44.3 mi |
Shavano Falls Hydro Drop 4 | Montrose, CO | 23.0 GWh | 53.7 mi |
South Canal Hydro-1 | Montrose, CO | 18.9 GWh | 52.8 mi |
South Canal Hydro-3 | Montrose, CO | 14.2 GWh | 52.9 mi |
Upper Molina | Molina, CO | 23.8 GWh | 23.3 mi |
USS Fruita Solar LLC CSG | Fruita, CO | 7.4 GWh | 3.3 mi |
Vinelands Power Plant | Palisade, CO | 15.6 GWh | 5.6 mi |
WWRF Solar Plant | Rifle, CO | 1.7 GWh | 46.3 mi |