Green Meadows
112 Green Meadow Drive, Sandwich, MA 2563Plant Summary Information
Green Meadows is ranked #149 out of 522 solar farms in Massachusetts in terms of total annual net electricity generation.
Green Meadows generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Green Meadows |
|---|---|
| Utility Name | Altus Power America Management, LLC |
| Location | Barnstable County, MA |
| Initial Operation Date | May 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 5.1 GWh |
| Annual Consumption | 17.5 k MMBtu |
| Ranked #7,991 out of 12,539 Power Plants Nationwide | |
| Ranked #3,165 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #221 out of 629 Massachusetts Power Plants | |
| Ranked #149 out of 522 Massachusetts Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Green States Energy, Inc. (2013 to 2018) Altus Power America Management, LLC (2019 to 2024) |
Map of Green Meadows
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Meadows.
Monthly Net Generation for Green Meadows
Green Meadows Details
| Summary Information | |
|---|---|
| Plant Name | Green Meadows (58097) |
| Plant Address | 112 Green Meadow Drive, Sandwich, MA 2563 |
| Utility | Altus Power America Management, LLC (60281) |
| Latitude, Longitude | 41.66944, -70.53194 |
| Generation Dates on File | May 2014 to Dec 2024 |
| Initial Operation Date | May 2014 |
| Annual Generation | 5.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
| Grid Voltage | 23.00 kV |
| Energy Storage | No |
Generator 1 Details Operating May 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3.5 MW |
| Summer Capacity | 3.5 MW |
| Winter Capacity | 3.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 4.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Green Meadows Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3155 | Raboth - Marion Drive | Kingston, MA | 5.1 GWh |
| #3156 | Forest City Solar | Forest City, IA | 5.1 GWh |
| #3157 | Davidson IV | Lexington, NC | 5.1 GWh |
| #3158 | Barnhill Road Solar, LLC | Elizabeth City, NC | 5.1 GWh |
| #3159 | Hinton | Hinton, OK | 5.1 GWh |
| #3160 | Red Maple Solar | Cleveland, MN | 5.1 GWh |
| #3161 | Broadway Solar (CSG) | Bangor, ME | 5.1 GWh |
| #3162 | Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 5.1 GWh |
| #3163 | Quittacas Pond Solar | Rochester, MA | 5.1 GWh |
| #3164 | Dept of General Services -FTB | Sacramento, CA | 5.1 GWh |
| #3166 | 3104 Batavia Solar | Batavia, NY | 5.1 GWh |
| #3167 | Onyx - Brockton Thatcher Landfill Solar | Brockton, MA | 5.1 GWh |
| #3168 | Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 4.7 GWh |
| #3169 | Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.1 GWh |
| #3170 | Lenape II | Indianapolis, IN | 5.1 GWh |
| #3171 | TES Rowtier | Westminster, MA | 5.1 GWh |
| #3172 | 3Colton | Millbury, MA | 5.1 GWh |
| #3173 | Black Eagle Solar, LLC | Black Eagle, MT | 5.1 GWh |
| #3174 | Suffolk CSG, LLC | Suffolk, VA | 5.1 GWh |
| #3175 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 5.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Meadows.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 118 Echo | Mashpee, MA | 4.0 MWh | 1.8 mi |
| ASD Cotuit MA Solar LLC | Sandwich, MA | 2.2 GWh | 3.1 mi |
| Barnstable Landfill | Marstons Mills, MA | 5.3 GWh | 7.1 mi |
| Blacksmith Road Solar 1 | Falmouth, MA | 8.5 GWh | 6 mi |
| BWC Gibbs Brook | Wareham, MA | 6.4 GWh | 11.2 mi |
| Canal | Sandwich, MA | 351.9 GWh | 7 mi |
| Cape Cod Air Force Station - 6 SWS | Sagamore, MA | 4.6 GWh | 5.7 mi |
| Cedarville CSG | Plymouth, MA | 4.4 GWh | 9.3 mi |
| DG Crystal Spring CSG | Mattapoisett, MA | 6.8 GWh | 2 mi |
| Falmouth 2 Solar | Falmouth, MA | 2.7 GWh | 5.3 mi |
| Falmouth Landfill Solar | Falmouth, MA | 4.9 GWh | 5.4 mi |
| Future Generation Wind | Plymouth, MA | 14.1 GWh | 8.4 mi |
| MA Military Reservation Wind Project | Otis ANG Base Bourne, MA | 9.7 GWh | 3.2 mi |
| Marston Mills Solar | Marstons Mills, MA | 5.7 GWh | 6.9 mi |
| Mashpee Landfill Solar | Mashpee, MA | 2.3 GWh | 3.9 mi |
| Notus Wind 1 | E. Falmouth, MA | 4.3 GWh | 5.8 mi |
| Onset East Community Solar Facility | Wareham, MA | 1.8 GWh | 8.8 mi |
| Onset West Community Solar Facility | Wareham, MA | 1.8 GWh | 8.8 mi |
| Renew Canal 1 CSG LLC | Sandwich, MA | 1.9 GWh | 6.8 mi |
| Sandwich | Sandwich, MA | 4.6 GWh | 4.3 mi |