Georgia-Pacific Monticello Paper
604 N.A. Sandifer Road, Monticello, MS 39654Plant Summary Information
Georgia-Pacific Monticello Paper is ranked #18 out of 80 black liquor power plants nationwide in terms of total annual net electricity generation.
Georgia-Pacific Monticello Paper is comprised of 2 generators and generated 137.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Georgia-Pacific Monticello Paper |
---|---|
Utility Name | Georgia-Pacific Monticello LLC |
Location | Lawrence County, MS |
Initial Operation Date | June 1968 |
Last Update | Dec 2024 |
Annual Generation | 550.2 GWh |
Annual Consumption | 6.0 M MMBtu |
Ranked #1,223 out of 12,288 Power Plants Nationwide | |
Ranked #18 out of 80 Black Liquor Power Plants Nationwide | |
Ranked #17 out of 55 Mississippi Power Plants | |
Ranked #3 out of 4 Mississippi Black Liquor Power Plants | |
Fuel Types | Black Liquor : 47.2% Natural Gas : 40.2% Wood/Wood Waste Solids : 12.6% |
Map of Georgia-Pacific Monticello Paper
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Georgia-Pacific Monticello Paper.
Monthly Net Generation for Georgia-Pacific Monticello Paper
Georgia-Pacific Monticello Paper Details
Summary Information | |
---|---|
Plant Name | Georgia-Pacific Monticello Paper (10610) |
Plant Address | 604 N.A. Sandifer Road, Monticello, MS 39654 |
Utility | Georgia-Pacific Monticello LLC (7166) |
Latitude, Longitude | 31.6285, -90.0809 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | June 1968 |
Annual Generation | 550.2 GWh |
Fuel Types | Black Liquor : 47.2% Natural Gas : 40.2% Wood/Wood Waste Solids : 12.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 93-118-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Paperboard Mills (32213) |
Sector | Industrial CHP (7) |
Water Source | Pearl River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Southern Pine Elec Power Assn (17647) MS |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
GULF SOUTH PIPELINE COMPANY LP Other - Please explain in pipeline notes below. |
Pipeline Notes | Natural gas is supplied by both Gulf South Pipeline and Black Bear |
Natural Gas Storage | No |
Generator GEN1 Details Operating June 1968
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SME.SME_LOAD |
Nameplate Capacity | 49.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 49.3 MW |
Winter Capacity | 49.3 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1968 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / WDS / BLQ |
---|
Generator GEN2 Details Operating June 1968
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SME.SME_LOAD |
Nameplate Capacity | 32.2 MW |
Nameplate Power Factor | 0.89 |
Summer Capacity | 32.2 MW |
Winter Capacity | 32.2 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1968 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / WDS / BLQ |
---|
Georgia-Pacific Monticello Paper Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#8 | International Paper Prattville Mill | Prattville, AL | 557.6 GWh |
#9 | Leaf River Cellulose LLC | New Augusta, MS | 413.9 GWh |
#10 | Covington Facility | Covington, VA | 739.5 GWh |
#11 | Sappi Cloquet Mill | Cloquet, MN | 469.8 GWh |
#12 | Fernandina Beach Mill | Fernandina Beach, FL | 588.8 GWh |
#13 | International Paper Georgetown Mill | Georgetown, SC | 484.7 GWh |
#14 | Mead Coated Board | Mahrt, AL | 733.8 GWh |
#15 | Georgia-Pacific Brewton Mill | Brewton, AL | 499.4 GWh |
#16 | International Paper Riegelwood Mill | Riegelwood, NC | 305.4 GWh |
#17 | Port Wentworth Mill | Port Wentworth, GA | 421.0 GWh |
#19 | International Paper Pine Hill Mill | Pine Hill, AL | 475.7 GWh |
#20 | International Paper Valliant OK | Valliant, OK | 448.9 GWh |
#21 | Packaging Corp of America | Counce, TN | 422.6 GWh |
#22 | Somerset Plant | Skowhegan, ME | 533.7 GWh |
#23 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 533.5 GWh |
#24 | International Paper Red River Mill | Campti, LA | 370.6 GWh |
#25 | Westrock Hodge (LA) | Hodge, LA | 466.5 GWh |
#26 | WestRock (TX) | Evadale, TX | 406.8 GWh |
#27 | Gaylord Container Bogalusa | Bogalusa, LA | 418.1 GWh |
#28 | Rumford Cogeneration | Rumford, ME | 430.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Georgia-Pacific Monticello Paper.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amite Solar, LLC | Roseland, LA | 7.9 GWh | 63.5 mi |
Ergon Refining Vicksburg | Vicksburg, MS | 31.8 GWh | 71.5 mi |
Gaylord Container Bogalusa | Bogalusa, LA | 418.1 GWh | 60 mi |
Georgia-Pacific Taylorsville Plywood | Taylorsville, MS | 54.6 GWh | 39 mi |
Grand Gulf | Port Gibson, MS | 11.5 TWh | 62.5 mi |
Hattiesburg Solar Farm | Hattiesburg, MS | 95.9 GWh | 52 mi |
Hinds Energy Facility | Jackson, MS | 3.0 TWh | 52.5 mi |
Iris Solar LLC | Franklinton, LA | 109.4 GWh | 58.9 mi |
Leaf River Cellulose LLC | New Augusta, MS | 413.9 GWh | 66.6 mi |
Lineage MS | Richland, MS | 1.8 GWh | 43.5 mi |
Moselle | Moselle, MS | 1.9 TWh | 46.5 mi |
Pearl River Solar Park LLC | Morton, MS | 259.5 GWh | 67 mi |
R D Morrow | Purvis, MS | 2.9 TWh | 49.4 mi |
Ragsdale Solar LLC | Canton, MS | 69.3 GWh | 63.9 mi |
Silver Creek | Prentiss, MS | 427.7 GWh | 8.1 mi |
Sumrall I Solar Farm | Sumrall, MS | 90.6 GWh | 37.7 mi |
Sumrall II Solar Farm | Sumrall, MS | 101.3 GWh | 38.5 mi |
Sunlight Road Solar | Franklinton, LA | 35.8 GWh | 59.1 mi |
Sylvarena | Raleigh, MS | 294.3 GWh | 46.2 mi |
Washington Parish Energy Center | Bogalusa, LA | 349.9 GWh | 58.7 mi |