Marshall Wind Farm
1315A 24 Road, Frankfort, KS 66427Plant Summary Information
Marshall Wind Farm is ranked #48 out of 175 power plants in Kansas in terms of total annual net electricity generation.
Marshall Wind Farm generated 63.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Marshall Wind Farm |
|---|---|
| Utility Name | BHE Renewables, LLC |
| Location | Marshall County, KS |
| Initial Operation Date | May 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 277.1 GWh |
| Annual Consumption | 1.0 M MMBtu |
| Ranked #2,127 out of 13,081 Power Plants Nationwide | |
| Ranked #637 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #48 out of 175 Kansas Power Plants | |
| Ranked #38 out of 52 Kansas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Marshall Wind Energy LLC (2013 to 2014) BHE Renewables, LLC (2015 to 2025) |
Map of Marshall Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Marshall Wind Farm.
Monthly Net Generation for Marshall Wind Farm
Monthly Plant Fuel Consumption for Marshall Wind Farm
Marshall Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Marshall Wind Farm (59084) |
| Plant Address | 1315A 24 Road, Frankfort, KS 66427 |
| Utility | BHE Renewables, LLC (59359) |
| Latitude, Longitude | 39.70111, -96.36083 |
| Generation Dates on File | May 2016 to Dec 2025 |
| Initial Operation Date | May 2016 |
| Annual Generation | 277.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Evergy Kansas Central, Inc (22500) KS |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator RPMA Details Operating May 2016
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 73.8 MW |
| Summer Capacity | 72 MW |
| Winter Capacity | 72 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 36 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 36 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 15.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 312 |
Marshall Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #627 | Crane Creek Wind Energy Center | Riceville, IA | 284.0 GWh |
| #628 | Pinyon Pine I | Mojave, CA | 283.1 GWh |
| #629 | Beethoven Wind | Tripp, SD | 282.3 GWh |
| #630 | Shiloh III Wind Project LLC | Birds Landing, CA | 282.0 GWh |
| #631 | Lone Tree Wind, LLC | Tiskilwa, IL | 281.5 GWh |
| #632 | NedPower Mount Storm | Mount Storm, WV | 281.1 GWh |
| #633 | Stanton Wind Energy LLC | Lenorah, TX | 279.9 GWh |
| #634 | Deerfield Wind Energy 2 | Port Hope, MI | 279.6 GWh |
| #635 | Kossuth County Wind | Lu Verne, IA | 277.7 GWh |
| #636 | Number Three Wind Project | Lowville, NY | 277.6 GWh |
| #638 | Sagebrush Power Partners | Ellensburg, WA | 277.0 GWh |
| #639 | Sendero | Hebbronville, TX | 274.3 GWh |
| #640 | Ball Hill Wind Energy, LLC | Forestville, NY | 274.3 GWh |
| #641 | South Peak Wind | Geyser, MT | 272.5 GWh |
| #642 | South Trent Wind Farm | Sweetwater, TX | 272.3 GWh |
| #643 | Goat Wind LP | Sterling City, TX | 271.4 GWh |
| #644 | Hatchet Ridge Wind Project | Burney, CA | 271.3 GWh |
| #645 | Lost Lakes Wind Farm LLC | Lake Park, IA | 270.1 GWh |
| #646 | Bison 2 Wind Energy Center | New Salem, ND | 269.8 GWh |
| #647 | Leaning Juniper | Arlington, OR | 269.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Marshall Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Auburn | Auburn, NE | 31.0 MWh | 54.7 mi |
| Beatrice | Beatrice, NE | 356.4 GWh | 49.5 mi |
| Clifton | Clifton, KS | 923.0 MWh | 49.2 mi |
| Cooper Nuclear Station | Brownville, NE | 6.9 TWh | 59.5 mi |
| Corvias - Fort Riley II | Fort Riley, KS | 1.9 GWh | 49 mi |
| Falls City | Falls City, NE | 499.0 MWh | 46.8 mi |
| Flat Water Wind Farm LLC | Du Bois, NE | 203.9 GWh | 30.9 mi |
| FreeState Crooked Post Solar I | Topeka, KS | 3.4 GWh | 56.9 mi |
| FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh | 51.1 mi |
| High Banks Wind | Belleville, KS | 2.5 TWh | 57.4 mi |
| Holton | City of Holton, KS | 806.0 MWh | 37 mi |
| Irish Creek Wind | Frankfort, KS | 950.5 GWh | 3.4 mi |
| Jeffrey Energy Center | St. Mary's, KS | 7.5 TWh | 31.5 mi |
| Munson-DS&O | Junction City, KS | 2.2 GWh | 53.2 mi |
| Riley III - Site 6 Community Solar | Fort Riley, KS | 3.4 GWh | 49.3 mi |
| Soldier Creek Wind | Corning, KS | 1.0 TWh | 17.9 mi |
| St. George | St. George, KS | 2.1 GWh | 32.7 mi |
| Steele Flats Wind Project LLC | Diller, NE | 370.0 GWh | 39.5 mi |
| Washington | Washington, KS | 24.0 MWh | 32.9 mi |
| Waste Management Rolling Meadows LFGTE | Topeka, KS | 48.1 GWh | 49.5 mi |