Burt County Solar Hybrid
VQ79+G4, Tekamah, NE 68061Plant Summary Information
Burt County Solar Hybrid is ranked #20 out of 21 solar farms in Nebraska in terms of total annual net electricity generation.
Burt County Solar Hybrid generated 233.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Burt County Solar Hybrid |
|---|---|
| Utility Name | BCSB, LLC |
| Location | Burt County, NE |
| Initial Operation Date | June 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 1.5 GWh |
| Annual Consumption | 5.2 k MMBtu |
| Ranked #11,640 out of 13,081 Power Plants Nationwide | |
| Ranked #6,410 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #86 out of 120 Nebraska Power Plants | |
| Ranked #20 out of 21 Nebraska Solar Power Plants | |
| Fuel Types | Solar |
Map of Burt County Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Burt County Solar Hybrid.
Monthly Net Generation for Burt County Solar Hybrid
Monthly Plant Fuel Consumption for Burt County Solar Hybrid
Burt County Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Burt County Solar Hybrid (64222) |
| Plant Address | VQ79+G4, Tekamah, NE 68061 |
| Utility | BCSB, LLC (63842) |
| Latitude, Longitude | 41.86378, -96.23217 |
| Generation Dates on File | Jun 2021 to Dec 2025 |
| Initial Operation Date | June 2021 |
| Annual Generation | 1.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 20-328-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Burt County Public Power Dist (2599) NE |
| Grid Voltage | 12.47 kV |
| Energy Storage | Yes |
Generator 1 Details Operating June 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 0.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 2 Details Operating June 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 3 |
|---|---|
| Maximum Charge Rate | 0.7 MW |
| Maximum Discharge Rate | 0.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.8 |
| Storage Enclosure Type | CS |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Ac Coupled | No |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Burt County Solar Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6400 | IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.5 GWh |
| #6401 | Boston Scientific Solar | Quincy, MA | 1.5 GWh |
| #6402 | Francis Scott Key Mall | Frederick, MD | 1.5 GWh |
| #6403 | Moores Hill | New Windsor, NY | 1.5 GWh |
| #6404 | Henryville Solar RES | Underwood, IN | 1.5 GWh |
| #6405 | Malone Solar Site | Malone, NY | 1.5 GWh |
| #6406 | Novel Schmoll Farms Solar CSG | Dodge Center, MN | 1.5 GWh |
| #6407 | Pivot Solar 34 | Longmont, CO | 1.5 GWh |
| #6408 | Eagle Springs Solar LLC | Silt, CO | 1.5 GWh |
| #6409 | DIVOCSG 13 | Wabasha, MN | 1.5 GWh |
| #6411 | Staples La Mirada, CA | La Mirada, CA | 1.5 GWh |
| #6412 | San Diego State University | San Diego, CA | 56.5 GWh |
| #6413 | Ulster County Solar | Kingston, NY | 1.5 GWh |
| #6414 | Park Solar | Woodbridge, CT | 1.5 GWh |
| #6415 | Montgomery County Correctional Facility | Boyds, MD | 1.5 GWh |
| #6416 | STAG St. Paul Project CSG | Saint Paul, MN | 1.5 GWh |
| #6417 | Cohasse Solar, LLC CSG | Southbridge, MA | 1.5 GWh |
| #6418 | Fredonia Solar LLC | Fredonia, NY | 1.5 GWh |
| #6419 | Jericho Landfill Solar Farm | Jerico, VT | 1.5 GWh |
| #6420 | Spring Mill Solar RES | Mitchell, IN | 1.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Burt County Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cuming County Renewables, LLC | Wisner, NE | 10.6 GWh | 34.1 mi |
| Dodge County Solar Hybrid | Scribner, NE | 1.4 GWh | 32 mi |
| Elk City Station | Bennington, NE | 39.2 GWh | 33.2 mi |
| Emerson | Emerson, NE | 2.0 MWh | 38.2 mi |
| Fort Calhoun Community Solar | Fort Calhoun, NE | 9.3 GWh | 30.5 mi |
| George Neal North | Sergeant Bluff, IA | 1.6 TWh | 32.8 mi |
| George Neal South | Salix, IA | 1.7 TWh | 30.9 mi |
| Jones Street | Omaha, NE | 9.9 GWh | 45.2 mi |
| Lon Wright | Fremont, NE | 515.7 GWh | 32.4 mi |
| Neal Energy Center Solar | Salix, IA | 7.4 GWh | 33 mi |
| New Harvest Wind Project LLC | Schleswig, IA | 263.0 GWh | 45.5 mi |
| North Omaha | Omaha, NE | 1.6 TWh | 39.8 mi |
| Pender | Pender, NE | 152.0 MWh | 29.9 mi |
| Platteview Solar LLC | Ashland, NE | 151.0 GWh | 47.1 mi |
| Rattlesnake Creek Wind Project | Dixon, NE | 905.7 GWh | 46.7 mi |
| Scribner Diesel Generation Facility | Scribner, NE | 68.0 MWh | 26.3 mi |
| South Sioux City Solar | Dakota, NE | 3.5 GWh | 42.4 mi |
| West Point Municipal | West Point, NE | 213.0 MWh | 24.8 mi |
| West Receiving | Denison, IA | 8.0 MWh | 46 mi |
| Wisner | Wisner, NE | 14.0 MWh | 36.2 mi |