Weatherly(PA) RTO BTM
409 Spring Street, Weatherly, PA 18255Plant Summary Information
Weatherly(PA) RTO BTM is ranked #49 out of 58 distillate fuel oil power plants in Pennsylvania in terms of total annual net electricity generation.
Weatherly(PA) RTO BTM is comprised of 2 generators and generated 23.3 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Weatherly(PA) RTO BTM |
|---|---|
| Utility Name | American Mun Power-Ohio, Inc |
| Location | Carbon County, PA |
| Initial Operation Date | June 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 124.0 MWh |
| Annual Consumption | 1.1 k MMBtu |
| Ranked #12,653 out of 13,081 Power Plants Nationwide | |
| Ranked #802 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #247 out of 250 Pennsylvania Power Plants | |
| Ranked #49 out of 58 Pennsylvania Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Weatherly(PA) RTO BTM
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Weatherly(PA) RTO BTM.
Monthly Net Generation for Weatherly(PA) RTO BTM
Monthly Plant Fuel Consumption for Weatherly(PA) RTO BTM
Weatherly(PA) RTO BTM Details
| Summary Information | |
|---|---|
| Plant Name | Weatherly(PA) RTO BTM (66443) |
| Plant Address | 409 Spring Street, Weatherly, PA 18255 |
| Utility | American Mun Power-Ohio, Inc (40577) |
| Latitude, Longitude | 40.94749, -75.82721 |
| Generation Dates on File | Jun 2023 to Dec 2025 |
| Initial Operation Date | June 2023 |
| Annual Generation | 124.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Borough of Weatherly - (PA) (20232) PA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator PB1 Details Operating June 2023
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.7 MW |
| Minimum Load | 2.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator PB2 Details Operating June 2023
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.7 MW |
| Minimum Load | 2.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Weatherly(PA) RTO BTM Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #792 | University of Washington Power Plant | Seattle, WA | 129.4 MWh |
| #793 | Putnam (MI) | Mayville, MI | 129.0 MWh |
| #794 | Sediver | York, SC | 129.0 MWh |
| #795 | Fishers Island 1 | Fisher's Island, NY | 129.0 MWh |
| #796 | Hillsdale | Hillsdale, MI | 711.0 MWh |
| #797 | Milford | Milford, IA | 127.0 MWh |
| #798 | Cutten | Houston, TX | 126.0 MWh |
| #799 | Jetmore | Jetmore, KS | 126.0 MWh |
| #800 | Higginsville | Higginsville, MO | 1.8 GWh |
| #801 | Monroeville RTO BTM | Monroeville, OH | 124.0 MWh |
| #803 | Granite Falls Walmart | Granite Falls, NC | 123.0 MWh |
| #804 | CIP II/AR Bridgewater Holdings - NJCOE | Bridgewater, NJ | 25.3 GWh |
| #805 | Ridge Rd | Alamo, TX | 122.0 MWh |
| #806 | Cherryville City Hall | Cherryville, NC | 122.0 MWh |
| #807 | Bayville Central Facility | Bayville, NJ | 1.2 GWh |
| #808 | Vaquero | Harlingen, TX | 120.0 MWh |
| #809 | Ord | Ord, NE | 119.0 MWh |
| #810 | Moose Lake | Moose Lake, MN | 128.0 MWh |
| #811 | Honea Path | Honea Path, SC | 117.0 MWh |
| #812 | N. Mary Francis | Odessa, TX | 116.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Weatherly(PA) RTO BTM.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allentown - Ruppsville | Allentown, PA | 3.6 GWh | 28.8 mi |
| Green Knight Energy Center | Pen Argyl, PA | 30.4 GWh | 30.1 mi |
| Hazelton | Hazelton, PA | 8.1 GWh | 11.2 mi |
| Hunlock Power Station | Hunlock Creek, PA | 232.5 GWh | 21.6 mi |
| Hunlock Unit 4 | Hunlock Creek, PA | 37.9 GWh | 21.6 mi |
| John B Rich Memorial Power Station | Frackville, PA | 641.9 GWh | 22.2 mi |
| Locust Ridge | Mahanoy City, PA | 55.9 GWh | 17 mi |
| Locust Ridge II LLC | Shenandoah, PA | 198.7 GWh | 18.6 mi |
| Moxie Freedom Generation Plant | Salem Township, PA | 7.0 TWh | 20.7 mi |
| Northampton Generating Company LP | Northampton, PA | 495.7 GWh | 25.4 mi |
| Orefield | Orefield, PA | 2.4 GWh | 23.7 mi |
| PA Solar Park | Nesquehoning, PA | 9.5 GWh | 6.2 mi |
| PA Solar Park II | Nesquehoning, PA | 14.4 GWh | 6 mi |
| Panther Creek Energy Facility | Nesquehoning, PA | 446.7 GWh | 6.9 mi |
| Pocono Solar Project | Long Pond, PA | 2.9 GWh | 18.1 mi |
| Romark PA Solar | Hazle Township, PA | 1.6 GWh | 11.1 mi |
| Schuylkill Haven PA BTM | Schuylkill Haven, PA | 275.0 MWh | 28.6 mi |
| St Nicholas Cogen Project | Shenandoah, PA | 665.7 GWh | 20.1 mi |
| TalenEnergy Susquehanna | Berwick, PA | 19.3 TWh | 19.4 mi |
| Wind Park Bear Creek | Bear Creek, PA | 58.8 GWh | 20.3 mi |