Puller Solar
382 Bobs Hole Rd., Topping, VA 23169Plant Summary Information
Puller Solar is ranked #80 out of 138 solar farms in Virginia in terms of total annual net electricity generation.
Puller Solar generated 4.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Puller Solar |
|---|---|
| Utility Name | Dominion Energy Inc. |
| Location | Middlesex County, VA |
| Initial Operation Date | October 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 26.8 GWh |
| Annual Consumption | 96.0 k MMBtu |
| Ranked #4,999 out of 13,081 Power Plants Nationwide | |
| Ranked #1,437 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #130 out of 243 Virginia Power Plants | |
| Ranked #80 out of 138 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Dominion Renewable Energy (2018 to 2020) Dominion Energy Inc (2021 to 2021) Dominion Energy Inc. (2022 to 2025) |
Map of Puller Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Puller Solar.
Monthly Net Generation for Puller Solar
Monthly Plant Fuel Consumption for Puller Solar
Puller Solar Details
| Summary Information | |
|---|---|
| Plant Name | Puller Solar (62140) |
| Plant Address | 382 Bobs Hole Rd., Topping, VA 23169 |
| Utility | Dominion Energy Inc. (5248) |
| Latitude, Longitude | 37.57245, -76.46734 |
| Generation Dates on File | Oct 2018 to Dec 2025 |
| Initial Operation Date | October 2018 |
| Annual Generation | 26.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator PULL Details Operating October 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 15 MW |
| Summer Capacity | 15 MW |
| Winter Capacity | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2018 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 19.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Puller Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1427 | Luke Solar | Glendale, AZ | 27.4 GWh |
| #1428 | Dogwood Solar, LLC | Scotland Neck, NC | 27.3 GWh |
| #1429 | AES Kekaha Solar, LLC Hybrid | Kekaha, HI | 26.6 GWh |
| #1430 | Beaufort Solar, LLC | Chocowinity, NC | 27.3 GWh |
| #1431 | CSWIND America Inc. | Pueblo, CO | 27.2 GWh |
| #1432 | Chihuahuan Desert Solar | San Elizario, TX | 27.2 GWh |
| #1433 | Bonanza | Vernal, UT | 2.6 TWh |
| #1434 | Gold Meadow Farms | Cranston, RI | 27.1 GWh |
| #1435 | Crane Solar Facility | Crane, IN | 26.9 GWh |
| #1436 | Creswell Alligood Solar, LLC | Creswell, NC | 26.9 GWh |
| #1438 | Santolina Solar Energy Center | Albuquerque, NM | 26.8 GWh |
| #1439 | San Miguel II Solar Energy Center | Las Vegas, NM | 26.6 GWh |
| #1440 | Valencia Solar | Tucson, AZ | 26.6 GWh |
| #1441 | South Valley Solar Energy Center | Albuquerque, NM | 26.5 GWh |
| #1442 | SunE EPE2 LLC | Las Cruces, NM | 26.4 GWh |
| #1443 | SR Litchfield | Litchfield, CT | 26.4 GWh |
| #1444 | Sea Grape | Ft. Pierce, FL | 26.3 GWh |
| #1445 | San Miguel I Solar Energy Center | Las Vegas, NM | 26.3 GWh |
| #1446 | Desert Star Hybrid | Buckeye, AZ | 24.2 GWh |
| #1447 | Western Antelope Dry Ranch | Lancaster, CA | 26.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Puller Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bookers Mill Solar | Farnham, VA | 128.8 GWh | 20.5 mi |
| Carvers Creek Solar | Gloucester, VA | 248.0 GWh | 7.6 mi |
| Correctional Solar LLC | Barhamsville, VA | 31.5 GWh | 21.8 mi |
| Essex Solar Center | Dunnsville, VA | 39.7 GWh | 25.6 mi |
| Gardy's Mill Solar | Kinsale, VA | 17.4 GWh | 31 mi |
| Gloucester Solar | Gloucester, VA | 38.1 GWh | 8.5 mi |
| Gravel Neck | Surry, VA | 120.0 GWh | 31.2 mi |
| Hemings Solar | Warsaw, VA | 10.0 GWh | 32.8 mi |
| King & Queen | Little Plymouth, VA | 65.0 GWh | 17.4 mi |
| Norge Solar Farm | Williamsburg, VA | 35.3 GWh | 22.1 mi |
| Northern Neck | Warsaw, VA | 2.7 GWh | 29.3 mi |
| Rappahannock Solar, LLC | White Stone, VA | 2.8 GWh | 7.4 mi |
| Rochambeau Solar | Williamsburg, VA | 31.8 GWh | 22.2 mi |
| Sandale Solar, LLC | Irvington, VA | 3.5 GWh | 7.7 mi |
| Surry | Surry, VA | 12.2 TWh | 30.8 mi |
| Tangier | Tangier, VA | 177.0 MWh | 31.4 mi |
| Waste Management Middle Peninsula LFGTE | Glenns, VA | 48.6 GWh | 9.3 mi |
| WestRock-West Point Mill | West Point, VA | 528.8 GWh | 18.7 mi |
| White Stone Ocran Solar LLC Community So | White Stone, VA | 10.7 GWh | 7 mi |
| Winterberry Solar | Gloucester, VA | 36.1 GWh | 15.1 mi |