Chihuahuan Desert Solar
13661 Chicken Ranch Road, San Elizario, TX 79849Plant Summary Information
Chihuahuan Desert Solar is ranked #179 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Chihuahuan Desert Solar generated 5.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Chihuahuan Desert Solar |
|---|---|
| Utility Name | El Paso Electric Co |
| Location | El Paso County, TX |
| Initial Operation Date | May 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 27.2 GWh |
| Annual Consumption | 92.8 k MMBtu |
| Ranked #4,988 out of 13,081 Power Plants Nationwide | |
| Ranked #1,432 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #585 out of 852 Texas Power Plants | |
| Ranked #179 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Chihuahuan Desert Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chihuahuan Desert Solar.
Monthly Net Generation for Chihuahuan Desert Solar
Monthly Plant Fuel Consumption for Chihuahuan Desert Solar
Chihuahuan Desert Solar Details
| Summary Information | |
|---|---|
| Plant Name | Chihuahuan Desert Solar (67174) |
| Plant Address | 13661 Chicken Ranch Road, San Elizario, TX 79849 |
| Utility | El Paso Electric Co (5701) |
| Latitude, Longitude | 31.56053, -106.25861 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | May 2025 |
| Annual Generation | 27.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | El Paso Electric Company (EPE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | El Paso Electric Co (5701) TX |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
Generator 10TXC Details Operating May 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2025 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Other Solar Technology | Yes |
| DC Net Capacity | 12 MW |
| Other Materials | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Chihuahuan Desert Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1422 | KDC Solar PR1, LLC | Jackson, NJ | 27.6 GWh |
| #1423 | Rio Rancho Solar Energy Center | Rio Rancho, NM | 27.5 GWh |
| #1424 | Hecate Energy Albany County 1 | Coeymans, NY | 27.5 GWh |
| #1425 | University Solar, LLC | West Greenwich, RI | 27.5 GWh |
| #1426 | Orion Solar I | Arvin, CA | 27.4 GWh |
| #1427 | Luke Solar | Glendale, AZ | 27.4 GWh |
| #1428 | Dogwood Solar, LLC | Scotland Neck, NC | 27.3 GWh |
| #1429 | AES Kekaha Solar, LLC Hybrid | Kekaha, HI | 26.6 GWh |
| #1430 | Beaufort Solar, LLC | Chocowinity, NC | 27.3 GWh |
| #1431 | CSWIND America Inc. | Pueblo, CO | 27.2 GWh |
| #1433 | Bonanza | Vernal, UT | 2.6 TWh |
| #1434 | Gold Meadow Farms | Cranston, RI | 27.1 GWh |
| #1435 | Crane Solar Facility | Crane, IN | 26.9 GWh |
| #1436 | Creswell Alligood Solar, LLC | Creswell, NC | 26.9 GWh |
| #1437 | Puller Solar | Topping, VA | 26.8 GWh |
| #1438 | Santolina Solar Energy Center | Albuquerque, NM | 26.8 GWh |
| #1439 | San Miguel II Solar Energy Center | Las Vegas, NM | 26.6 GWh |
| #1440 | Valencia Solar | Tucson, AZ | 26.6 GWh |
| #1441 | South Valley Solar Energy Center | Albuquerque, NM | 26.5 GWh |
| #1442 | SunE EPE2 LLC | Las Cruces, NM | 26.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chihuahuan Desert Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Afton Generating Station | La Mesa, NM | 483.6 GWh | 51.5 mi |
| Buena Vista Energy Center | Chaparral, NM | 382.8 GWh | 35 mi |
| Copper | El Paso, TX | 27.8 GWh | 15.2 mi |
| Felina | Fabens, TX | 228.2 GWh | 13.1 mi |
| Fort Bliss (DEA EPIC) | El Paso, TX | 4.6 GWh | 19.8 mi |
| Milagro Solar I | Santa Teresa, NM | 311.9 GWh | 27.8 mi |
| Montana Power Station | El Paso, TX | 911.7 GWh | 18.4 mi |
| Montana Solar Facility | El Paso, TX | 5.5 GWh | 17.6 mi |
| New Mexico State University | Las Cruces, NM | 28.0 GWh | 43.3 mi |
| Newman | El Paso, TX | 3.5 TWh | 30.9 mi |
| Newman Solar | El Paso, TX | 15.8 GWh | 30.5 mi |
| NMSU Solar and Storage | Las Cruces, NM | 7.8 GWh | 57.7 mi |
| Nodal Power | Sunland Park, NM | 11.4 GWh | 26.2 mi |
| Phelps Dodge Refining | El Paso, TX | 59.2 GWh | 16.1 mi |
| Rio Grande | SunLand Park, NM | 925.9 GWh | 23.9 mi |
| Roadrunner Solar | Santa Teresa, NM | 47.0 GWh | 29.2 mi |
| SLO-3 Community Solar | Las Cruces, NM | 55.0 MWh | 65.3 mi |
| SunE EPE1 LLC | Chaparral, NM | 26.2 GWh | 33.1 mi |
| SunE EPE2 LLC | Las Cruces, NM | 26.4 GWh | 61.3 mi |
| TJX 2021 DG El Paso DC | El Paso, TX | 1.3 GWh | 17.7 mi |