MA Military Reservation Wind Project
575 Cole Road, Otis ANG Base Bourne, MA 2542Plant Summary Information
MA Military Reservation Wind Project is ranked #5 out of 21 wind farms in Massachusetts in terms of total annual net electricity generation.
MA Military Reservation Wind Project generated 3.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | MA Military Reservation Wind Project |
---|---|
Utility Name | Air Force Civil Engineer Center |
Location | Barnstable County, MA |
Initial Operation Date | December 2009 |
Last Update | Dec 2022 |
Annual Generation | 10.2 GWh |
Annual Consumption | 38.6 k MMBtu |
Ranked #5,887 out of 11,455 Power Plants Nationwide | |
Ranked #1,131 out of 1,337 Wind Power Plants Nationwide | |
Ranked #73 out of 583 Massachusetts Power Plants | |
Ranked #5 out of 21 Massachusetts Wind Power Plants | |
Fuel Types | Wind |
Map of MA Military Reservation Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MA Military Reservation Wind Project.
Monthly Net Generation for MA Military Reservation Wind Project
MA Military Reservation Wind Project Details
Summary Information | |
---|---|
Plant Name | MA Military Reservation Wind Project (57253) |
Plant Address | 575 Cole Road Otis ANG Base Bourne, MA 2542 |
Utility | Air Force Civil Engineer Center (56619) |
Latitude, Longitude | 41.6647, -70.5942 |
Generation Dates on File | Dec 2009 to Dec 2022 |
Initial Operation Date | December 2009 |
Annual Generation | 10.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF07-121-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | Fuhrlander |
Predominant Turbine Model Number | FL 1500-77 |
Design Wind Speed | 14.5 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Generator 2 Details Operating November 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 13.7 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Generator 3 Details Operating November 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 13.7 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
MA Military Reservation Wind Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1121 | Butter Creek Power LLC | Echo, OR | 11.2 GWh |
#1122 | REG Juhl Glenville Wind, LLC | Albert Lea, MN | 11.2 GWh |
#1123 | Coastal Energy Project | Aberdeen, WA | 11.2 GWh |
#1124 | South Louisburg Solar | Louisburg, NC | 11.1 GWh |
#1125 | Searsburg Wind Turbine | Searsburg, VT | 10.7 GWh |
#1126 | Worthington | Worthington, MN | 10.8 GWh |
#1127 | Cuming County Renewables, LLC | Wisner, NE | 10.7 GWh |
#1128 | Anchor Wind, LLC | Mechanicsville, IA | 10.5 GWh |
#1129 | Wind Colebrook South | Colebrook, CT | 10.3 GWh |
#1130 | Ocotillo Windpower | Forsan, TX | 10.3 GWh |
#1132 | Lincoln Heights II | Lake Benton, MN | 10.2 GWh |
#1133 | Lake Region Community Hybrid, LLC | Rothsay, MN | 10.0 GWh |
#1134 | Com Adam 1WF-1 | Sublette, IL | 9.5 GWh |
#1135 | Findlay Wind Farm | Findlay, OH | 9.2 GWh |
#1136 | Swauk Wind LLC | Thorp, WA | 9.1 GWh |
#1137 | CCC Hastings Wind Turbine | Hastings, NE | 8.9 GWh |
#1138 | Roseman | Anita, IA | 8.9 GWh |
#1139 | Seward Wind Farm | Seward, NE | 8.8 GWh |
#1140 | Valfilm Wind Project | Findlay, OH | 8.8 GWh |
#1141 | August Wind Farm | Clearfield, IA | 8.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MA Military Reservation Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
160 Tihonet Rd Hybrid(CSG) | Wareham, MA | 2.7 GWh | 10.8 mi |
Barnstable Landfill | Marstons Mills, MA | 5.7 GWh | 10.3 mi |
Blacksmith Road Solar 1 | Falmouth, MA | 4.8 GWh | 4.4 mi |
BWC Gibbs Brook | Wareham, MA | 6.7 GWh | 9.2 mi |
BWC Harlow Brook | Wareham, MA | 2.2 GWh | 9.6 mi |
BWC Pocasset River | Wareham, MA | 2.4 GWh | 9.4 mi |
BWC Wareham River | Wareham, MA | 2.0 GWh | 9.7 mi |
Canal | Sandwich, MA | 88.7 GWh | 8.4 mi |
Cape Cod Air Force Station - 6 SWS | Sagamore, MA | 7.4 GWh | 6.7 mi |
Cedarville CSG | Plymouth, MA | 4.4 GWh | 9.8 mi |
DG Crystal Spring CSG | Mattapoisett, MA | 7.2 GWh | 5.2 mi |
Falmouth Landfill Solar | Falmouth, MA | 4.9 GWh | 3.8 mi |
Future Generation Wind | Plymouth, MA | 15.5 GWh | 7.7 mi |
Green Meadows | Sandwich, MA | 3.8 GWh | 3.2 mi |
Mashpee Landfill Solar | Mashpee, MA | 2.4 GWh | 6.5 mi |
Notus Wind 1 | E. Falmouth, MA | 5.1 GWh | 4 mi |
Onset East Community Solar Facility | Wareham, MA | 1.9 GWh | 7.1 mi |
Onset West Community Solar Facility | Wareham, MA | 1.9 GWh | 7.1 mi |
Renew Canal 1 CSG LLC | Sandwich, MA | 1.9 GWh | 8 mi |
Tihonet Solar | Wareham, MA | 1.9 GWh | 10.8 mi |