USS White Cloud LLC CSG
3388 County Road 8 SE, St. Cloud, MN 56304Plant Summary Information
USS White Cloud LLC CSG is ranked #314 out of 503 solar farms in Minnesota in terms of total annual net electricity generation.
USS White Cloud LLC CSG generated 246.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | USS White Cloud LLC CSG |
---|---|
Utility Name | Standard Solar |
Location | Sherburne County, MN |
Initial Operation Date | November 2019 |
Last Update | Dec 2024 |
Annual Generation | 1.9 GWh |
Annual Consumption | 6.8 k MMBtu |
Ranked #10,398 out of 12,312 Power Plants Nationwide | |
Ranked #5,180 out of 6,191 Solar Power Plants Nationwide | |
Ranked #502 out of 756 Minnesota Power Plants | |
Ranked #314 out of 503 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of USS White Cloud LLC CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for USS White Cloud LLC CSG.
Monthly Net Generation for USS White Cloud LLC CSG
USS White Cloud LLC CSG Details
Summary Information | |
---|---|
Plant Name | USS White Cloud LLC CSG (63139) |
Plant Address | 3388 County Road 8 SE, St. Cloud, MN 56304 |
Utility | Standard Solar (60531) |
Latitude, Longitude | 45.52079, -94.13041 |
Generation Dates on File | Nov 2019 to Dec 2024 |
Initial Operation Date | November 2019 |
Annual Generation | 1.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-879-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator USSWC Details Operating November 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
USS White Cloud LLC CSG Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Standard Solar | 1355 Piccard Drive Suite 300, Rockville, MD 20850 | 90.00% |
US Solar | 100 N 6th St, Suite 218C, Minneapolis, MN 55403 | 10.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5170 | USS Pheasant Solar LLC CSG | Clara City, MN | 2.0 GWh |
#5171 | USS Rockpoint Solar CSG | Stacy, MN | 2.0 GWh |
#5172 | USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.0 GWh |
#5173 | Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh |
#5174 | Whitfield Cooper | Cohutta, GA | 2.0 GWh |
#5175 | Novel Shelly Solar LLC (CSG) | Cottonwood, MN | 1.9 GWh |
#5176 | FastSun 11 CSG | Zumbrota, MN | 1.9 GWh |
#5177 | SolarClub 03 | Starbuck, MN | 1.9 GWh |
#5178 | Hammer Community (CSG) | Clear Lake, MN | 1.9 GWh |
#5179 | JB-Tobin 2 | La Grange, NY | 1.9 GWh |
#5181 | Brewer (CSG) | Brewer, ME | 1.9 GWh |
#5182 | Holtsville Solar Project | Holtsville, NY | 1.9 GWh |
#5183 | Benjamin Moore & Co. Solar | Mount Olive, NJ | 1.9 GWh |
#5184 | Reed Road Solar | Lake In The Hills, IL | 1.9 GWh |
#5185 | Yorktown 2 Solar | Lyndon, IL | 1.9 GWh |
#5186 | Sheriff Road | Hyattsville, MD | 1.9 GWh |
#5187 | WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 1.9 GWh |
#5188 | BKV Ponder Solar 1 | Ponder, TX | 1.9 GWh |
#5189 | SVEP Solar Project Company | Pownal, VT | 1.9 GWh |
#5190 | USS Good Solar CSG | Stacy, MN | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding USS White Cloud LLC CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Delphinus Community Solar | Sauk Rapids, MN | 2.6 GWh | 7 mi |
E. Goenner Project CSG | Clear Lake, MN | 1.4 GWh | 4.4 mi |
FastSun 21 CSG | St. Cloud, MN | 1.8 GWh | 1.7 mi |
Gohman Community Solar (CSG) | Clear Lake, MN | 1.6 GWh | 7.2 mi |
GSPP Held LLC CSG | St. Cloud, MN | 4.9 GWh | 7.5 mi |
GSPP Imholte CSG | St. Cloud, MN | 1.8 GWh | 3 mi |
Hartmann Project CSG | Saint Cloud, MN | 1.3 GWh | 2.1 mi |
Haven Solar Project CSG | Saint Cloud, MN | 4.7 GWh | 0.5 mi |
Held Solar Project | Waite Park, MN | 8.0 GWh | 6.9 mi |
Marmas Solar CSG | St. Cloud, MN | 6.4 GWh | 2.5 mi |
Nautilus Saint Cloud Solar (CSG) | Saint Cloud, MN | 8.2 GWh | 1.8 mi |
Prawer Project CSG | Clear Lake, MN | 1.6 GWh | 5.7 mi |
Sherburne Community Solar | Clear Lake, MN | 7.8 GWh | 7.1 mi |
Sherburne Community Solar One LLC CSG | Saint Cloud, MN | 1.7 GWh | 0.8 mi |
Sherburne North Project CSG | St. Cloud, MN | 8.7 GWh | 1.8 mi |
St. Cloud Hydro | St Cloud, MN | 50.6 GWh | 2 mi |
St. Cloud Solar CSG | St. Cloud, MN | 8.5 GWh | 3 mi |
Tiller CSG | Clear Lake, MN | 7.7 GWh | 7.4 mi |
USS Haven Solar LLC CSG | St. Cloud, MN | 1.8 GWh | 1.1 mi |
USS Solar Rapids CSG | Sauk Rapids, MN | 2.0 GWh | 4.9 mi |