Energy Shelby County
3575 E 400 North Road, Neoga, IL 62447Plant Summary Information
Energy Shelby County is ranked #19 out of 75 natural gas power plants in Illinois in terms of total annual net electricity generation.
Energy Shelby County is comprised of 8 generators and generated 40.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Energy Shelby County |
---|---|
Utility Name | Earthrise Energy, PBC |
Location | Shelby County, IL |
Initial Operation Date | June 2000 |
Last Update | Dec 2022 |
Annual Generation | 132.1 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #2,844 out of 11,455 Power Plants Nationwide | |
Ranked #846 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #89 out of 314 Illinois Power Plants | |
Ranked #19 out of 75 Illinois Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operators |
NRG Wholesale Generation LP (2013 to 2015) Shelby County Energy Center, LLC (2016 to 2021) Earthrise Energy, PBC (2022 to 2022) |
Map of Energy Shelby County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Energy Shelby County.
Monthly Net Generation for Energy Shelby County
Energy Shelby County Details
Summary Information | |
---|---|
Plant Name | Energy Shelby County (55237) |
Plant Address | 3575 E 400 North Road Neoga, IL 62447 |
Utility | Earthrise Energy, PBC (65379) |
Latitude, Longitude | 39.2794, -88.4772 |
Generation Dates on File | Apr 2001 to Dec 2022 |
Initial Operation Date | June 2000 |
Annual Generation | 132.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 04-77-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City Of Neoga, Lake Matton |
Ash Impoundment | No |
Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRUNKLINE GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGA |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGB |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGC |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG4 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGD |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG5 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGE |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Pulverized Coal Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG6 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGF |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | June 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG7 Details Operating May 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGG |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | May 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG8 Details Operating May 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.REI2CTGH |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | April 2022 |
Status | Operating |
First Operation Date | May 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Energy Shelby County Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#836 | Doyle Energy Facility | Monroe, GA | 137.4 GWh |
#837 | Rand Whitney CHP Plant | Montville, CT | 136.3 GWh |
#838 | Graham | Graham, TX | 167.2 GWh |
#839 | Comanche (CO) | Pueblo, CO | 7.3 TWh |
#840 | Gans | Gans, PA | 135.3 GWh |
#841 | Rubart | Ulysses, KS | 135.2 GWh |
#842 | Peno Creek | Bowling Green, MO | 135.2 GWh |
#843 | Marshall Energy Facility | Calvert City, KY | 135.2 GWh |
#844 | Lieberman | Mooringsport, LA | 134.7 GWh |
#845 | West Marinette | Peshtigo, WI | 133.0 GWh |
#847 | UCONN Cogen Facility | Storrs, CT | 132.5 GWh |
#848 | Enterprise Products Operating | Mont Belvieu, TX | 130.4 GWh |
#849 | South Plant | Colorado Springs, CO | 135.3 GWh |
#850 | Pratt & Whitney | East Hartford, CT | 130.4 GWh |
#851 | Vernon Boulevard | Long Island City, NY | 129.9 GWh |
#852 | Permian Basin | Monahans, TX | 131.1 GWh |
#853 | D G Hunter | Alexandria, LA | 128.1 GWh |
#854 | Central Utility Plant - Texas A&M | College Station, TX | 128.1 GWh |
#855 | Indiana Harbor West | East Chicago, IN | 155.2 GWh |
#856 | West Marinette 34 | Peshtigo, WI | 126.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Energy Shelby County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altamont | Altamont, IL | 95.5 MWh | 20.8 mi |
Casey City of | Casey, IL | 66.2 MWh | 26 mi |
Clay FC | Louisville, IL | 3.6 GWh | 36.6 mi |
Conagra Foods at St. Elmo | St. Elmo, IL | 3.6 GWh | 27.1 mi |
Dressor Plains Solar, LLC | Herrick, IL | 251.9 GWh | 30.3 mi |
Flora Site A | Flora, IL | 38.2 MWh | 42.2 mi |
Flora Site B | Flora, IL | 33.5 MWh | 42 mi |
Freedom Power Project | St. Elmo, IL | 1.8 GWh | 23.8 mi |
Harvest Ridge Wind Farm | Newman, IL | 765.9 GWh | 43.8 mi |
Holland Energy Facility | Beecher City, IL | 2.7 TWh | 15.5 mi |
IMEA Flora | Flora, IL | 64.3 MWh | 42.4 mi |
Kinmundy | Patoka, IL | 224.0 MWh | 45.9 mi |
Marshall (IL) | Marshall, IL | 178.6 MWh | 43 mi |
Newton | Newton, IL | 3.4 TWh | 26 mi |
Olney Solar II CSG | Olney, IL | 4.6 GWh | 42.9 mi |
Prairie Wolf Solar LLC | Ashmore Township, IL | 405.7 GWh | 32.6 mi |
Raccoon Creek Energy Center | Flora, IL | 8.0 GWh | 40.2 mi |
River Ferry Solar 1 | West Union, IL | 73.8 GWh | 45.4 mi |
Sullivan (IL) | Sullivan, IL | 241.0 MWh | 23.1 mi |
The GSI Group LLC at Assumption | Assumption, IL | 3.3 GWh | 34 mi |