Coastal Energy Project
117 East Third St, Aberdeen, WA 98520Plant Summary Information
Coastal Energy Project is ranked #22 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Coastal Energy Project generated 3.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Coastal Energy Project |
---|---|
Utility Name | Coastal Community Action Program |
Location | Grays Harbor County, WA |
Initial Operation Date | June 2010 |
Last Update | Dec 2023 |
Annual Generation | 11.6 GWh |
Annual Consumption | 41.9 k MMBtu |
Ranked #5,826 out of 12,299 Power Plants Nationwide | |
Ranked #1,120 out of 1,353 Wind Power Plants Nationwide | |
Ranked #109 out of 131 Washington Power Plants | |
Ranked #22 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Coastal Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coastal Energy Project.
Monthly Net Generation for Coastal Energy Project
Coastal Energy Project Details
Summary Information | |
---|---|
Plant Name | Coastal Energy Project (57756) |
Plant Address | 117 East Third St, Aberdeen, WA 98520 |
Utility | Coastal Community Action Program (57066) |
Latitude, Longitude | 46.79358, -124.06541 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | June 2010 |
Annual Generation | 11.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Grays Harbor County (7548) WA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating June 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 4 |
Turbine Details | |
Number Of Turbines | 4 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 12 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 265 |
Coastal Energy Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1110 | Haviland Plastic Products | Haviland, OH | 12.9 GWh |
#1111 | Huerfano River Wind | Walsenburg, CO | 12.8 GWh |
#1112 | Cooper Farms VW Project | Van Wert, OH | 12.8 GWh |
#1113 | Fort Hays State University Wind Farm | Hays, KS | 12.7 GWh |
#1114 | Agriwind | Tiskilwa, IL | 12.7 GWh |
#1115 | Lamar Plant | Lamar, CO | 12.6 GWh |
#1116 | Edom Hills Project 1 LLC | Cathedral City, CA | 12.4 GWh |
#1117 | Western Plains Wind | Oakley, KS | 12.2 GWh |
#1118 | Shaokatan Hills LLC | Hendricks, MN | 12.1 GWh |
#1119 | Garnet Wind Energy Center | North Palm Springs, CA | 11.9 GWh |
#1121 | Foote Creek IV | Rock River, WY | 11.6 GWh |
#1122 | Polk County Renewables, LLC | Osceola, NE | 11.6 GWh |
#1123 | Medicine Bow | Medicine Bow, WY | 11.1 GWh |
#1124 | Optimum Wind 7 LLC | Nevada, IA | 11.0 GWh |
#1125 | Searsburg Wind Turbine | Searsburg, VT | 11.0 GWh |
#1126 | Butter Creek Power LLC | Echo, OR | 10.9 GWh |
#1127 | Cashton Greens Wind Farm | Cashton, WI | 10.7 GWh |
#1128 | Wind Colebrook South | Colebrook, CT | 10.7 GWh |
#1129 | Ralls Wind Farm | Ralls, TX | 10.6 GWh |
#1130 | Greensburg | Greensburg, KS | 10.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coastal Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver | Clatskanie, OR | 1.7 TWh | 60.3 mi |
Chehalis Generating Facility | Chehalis, WA | 2.5 TWh | 55.9 mi |
Cushman 1 | Shelton, WA | 120.0 GWh | 58.5 mi |
Cushman 2 | Shelton, WA | 179.2 GWh | 58.3 mi |
Georgia-Pacific Wauna Mill | Clatskanie, OR | 202.2 GWh | 54.2 mi |
Grays Harbor Energy Facility | Elma, WA | 3.1 TWh | 30.2 mi |
Lilliwaup Falls Generating | Lilliwaup, WA | 5.4 GWh | 64.7 mi |
Longview Fibre | Longview, WA | 170.9 GWh | 72.5 mi |
Mayfield | Silver Creek, WA | 576.4 GWh | 72.9 mi |
Mint Farm Generating Station | Longview, WA | 2.0 TWh | 68.5 mi |
Mossyrock | Silver Creek, WA | 824.4 GWh | 79.8 mi |
Nippon Dynawave Packaging Longview WA | Longview, WA | 285.2 GWh | 69.6 mi |
Port Westward | Clatskanie, OR | 3.0 TWh | 60.1 mi |
Port Westward Unit 2 | Clatskanie, OR | 1.1 TWh | 60.1 mi |
Sierra Pacific Aberdeen | Aberdeen, WA | 128.4 GWh | 18.5 mi |
Skookumchuck | Tenino, WA | 3.2 GWh | 63.7 mi |
Skookumchuck Wind Facility | Rainier, WA | 400.6 GWh | 66.4 mi |
Transalta Centralia Generation | Centralia, WA | 3.1 TWh | 57.1 mi |
Wynoochee | Montesano, WA | 30.8 GWh | 46.2 mi |
Yelm | Yelm, WA | 33.7 GWh | 68.7 mi |