Dorchester Biomass
609 7 Mile Road, Harleyville, SC 29448Plant Summary Information
Dorchester Biomass is ranked #45 out of 155 wood/wood waste solids power plants nationwide in terms of total annual net electricity generation.
Dorchester Biomass is comprised of 1 generator and generated 37.9 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Dorchester Biomass |
---|---|
Utility Name | Dorchester Biomass LLC |
Location | Dorchester County, SC |
Initial Operation Date | November 2013 |
Last Update | Dec 2024 |
Annual Generation | 130.4 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #2,948 out of 12,288 Power Plants Nationwide | |
Ranked #45 out of 155 Wood/Wood Waste Solids Power Plants Nationwide | |
Ranked #41 out of 192 South Carolina Power Plants | |
Ranked #2 out of 8 South Carolina Wood/Wood Waste Solids Power Plants | |
Fuel Types | Wood/Wood Waste Solids |
Previous Operators |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2018) Dorchester Biomass LLC (2019 to 2024) |
Map of Dorchester Biomass
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dorchester Biomass.
Monthly Net Generation for Dorchester Biomass
Dorchester Biomass Details
Summary Information | |
---|---|
Plant Name | Dorchester Biomass (58707) |
Plant Address | 609 7 Mile Road, Harleyville, SC 29448 |
Utility | Dorchester Biomass LLC (63514) |
Latitude, Longitude | 33.23861, -80.45028 |
Generation Dates on File | Oct 2013 to Dec 2024 |
Initial Operation Date | November 2013 |
Annual Generation | 130.4 GWh |
Fuel Types | Wood/Wood Waste Solids |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Santee Electric Coop, Inc (16606) SC |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating November 2013
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 19.5 MW |
Winter Capacity | 19.5 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wood/Wood Waste Solids |
Startup Source | Wood/Wood Waste Solids |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Dorchester Biomass Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wood/Wood Waste Solids.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#35 | Rothschild Biomass Cogen Facility | Rothschild, WI | 152.8 GWh |
#36 | Pacific-Ultrapower Chinese Station | Jamestown, CA | 146.9 GWh |
#37 | Manitowoc | Manitowoc, WI | 149.4 GWh |
#38 | SPI Anderson 2 | Anderson, CA | 141.6 GWh |
#39 | International Paper Pine Hill Mill | Pine Hill, AL | 475.7 GWh |
#40 | DeRidder Mill | DeRidder, LA | 402.4 GWh |
#41 | Allendale Biomass | Fairfax, SC | 137.6 GWh |
#42 | Biomass One LP | White City, OR | 136.0 GWh |
#43 | Cadillac Renewable Energy | Cadillac, MI | 135.7 GWh |
#44 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 360.8 GWh |
#46 | Sierra Pacific Aberdeen | Aberdeen, WA | 128.4 GWh |
#47 | Virginia City Hybrid Energy Center | St. Paul, VA | 1.3 TWh |
#48 | Seneca Sustainable Energy LLC | Eugene, OR | 125.7 GWh |
#49 | St Paul Cogeneration | St. Paul, MN | 151.1 GWh |
#50 | Covington Facility | Covington, VA | 739.5 GWh |
#51 | National Energy of McBain | McBain, MI | 136.0 GWh |
#52 | Florence Mill | Florence, SC | 322.9 GWh |
#53 | Multitrade Rabun Gap, LLC | Rabun Gap, GA | 115.8 GWh |
#54 | Dillard Complex | Dillard, OR | 114.0 GWh |
#55 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 533.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dorchester Biomass.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abbot Solar | Manning, SC | 3.9 GWh | 32.7 mi |
Berkeley County Landfill | Moncks Corner, SC | 237.0 MWh | 25.7 mi |
Bloom Solar | Summerton, SC | 3.6 GWh | 26.5 mi |
Bond Solar | Summerton, SC | 3.3 GWh | 26.6 mi |
Bull Street Plant | Orangeburg, SC | 37.0 MWh | 29.8 mi |
Cameron Solar | Cameron, SC | 42.6 GWh | 27.5 mi |
Cameron Solar II | Cameron, SC | 7.7 GWh | 26.8 mi |
Colleton Solar Farm | Walterboro, SC | 3.4 GWh | 26.5 mi |
Cross | Cross, SC | 9.4 TWh | 21.5 mi |
Huntley | Bowman, SC | 158.0 GWh | 12.6 mi |
Jamison Solar Farm | Orangeburg, SC | 1.9 GWh | 32.2 mi |
Jefferies | Moncks Corner, SC | 248.0 GWh | 26.5 mi |
Lone Star Solar | Cameron, SC | 31.5 GWh | 30.4 mi |
Omtanke Solar | Ridgeville, SC | 9.9 GWh | 13.5 mi |
Palmetto Plains | Bowman, SC | 120.8 GWh | 15.9 mi |
Rowesville Rd Plant | Orangeburg, SC | 1.0 GWh | 26.7 mi |
Spillway | Pineville, SC | 5.6 GWh | 22.2 mi |
St Stephen | St. Stephen, SC | 258.6 GWh | 32.7 mi |
Substation 20 Plant | Orangeburg, SC | 751.0 MWh | 26.5 mi |
TWE Bowman Solar Project | Bowman, SC | 127.8 GWh | 14.4 mi |