Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Plott Hound Solar | Plott Hound Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Pleasant Hill PV1 | Pine Gate Renewables | Pleasant Hill, NC | PJM Interconnection, LLC (PJM) | 39.9 GWh | Feb 2024 | Dec 2025 | Solar |
| Pinesage | Cypress Creek Renewables | West End, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Pine Valley Solar Farm, LLC | SunStrong Management | West End, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Apr 2022 | Dec 2025 | Solar |
| Pilot Mountain Solar, LLC | USF Essex Lessor, LLC | King, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Pikeville Farm | Dominion Renewable Energy | Pikeville, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Oct 2017 | Dec 2025 | Solar |
| Phobos Solar, LLC | Phobos Solar, LLC | Middlesex, NC | Duke Energy Progress East (CPLE) | 170.5 GWh | Dec 2022 | May 2026 | Solar |
| Phelps 158 Solar Farm | CleanCapital Holdings | Conway, NC | PJM Interconnection, LLC (PJM) | 5.4 GWh | Jan 2018 | Dec 2025 | Solar |
| PG Solar, LLC | North Carolina El Member Corp | Mt Olive, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Oct 2020 | Dec 2025 | Solar |
| Perkins Solar, LLC | Cypress Creek Renewables | Roxboro, NC | Duke Energy Carolinas (DUK) | 3.8 GWh | Sep 2016 | Dec 2025 | Solar |
| Perendale Holdings, LLC | Perendale Holdings, LLC | Mocksville, NC | Duke Energy Carolinas (DUK) | 15.5 GWh | Dec 2024 | Dec 2025 | Solar |
| Penny Hill Solar | Cardinal Renewables | Greenville, NC | PJM Interconnection, LLC (PJM) | 3.6 GWh | Aug 2017 | Dec 2025 | Solar |
| Pecan Solar | Dominion Renewable Energy | Pleasant Hill, NC | PJM Interconnection, LLC (PJM) | 154.9 GWh | Nov 2018 | May 2026 | Solar |
| Pecan PV1 | Strata Manager, LLC | Cordova, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Pecan Grove Solar, LLC | CI-II Mitchell Holding LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Oct 2019 | Dec 2025 | Solar |
| Peake Road | Strata Manager, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | May 2019 | Dec 2025 | Solar |
| PCSP3 Airport | Carolina Solar Energy LLC | Timberlake, NC | Duke Energy Carolinas (DUK) | 3.7 GWh | Sep 2011 | Dec 2025 | Solar |
| PCS Phosphate | PCS Phosphate | Aurora, NC | Duke Energy Progress East (CPLE) | 225.5 GWh | Nov 1984 | May 2026 | Waste Heat |
| PCIP Solar | CleanCapital Holdings | Timberlake, NC | Duke Energy Progress East (CPLE) | 898.0 MWh | Oct 2011 | Dec 2025 | Solar |
| Pate Farm | Strata Manager, LLC | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Pasquotank | Duke Energy Renewables Services | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 34.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Partin Solar | Partin Solar, LLC | Elkin, NC | Duke Energy Carolinas (DUK) | 88.0 GWh | Sep 2023 | May 2026 | Solar |
| Panda Solar NC 9, LLC | Panda Solar NC 9, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 8, LLC | Panda Solar NC 8, LLC | Star, NC | Duke Energy Progress East (CPLE) | 2.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Panda Solar NC 7, LLC | Panda Solar NC 7 , LLC | Faison, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Jun 2019 | Dec 2025 | Solar |
| Panda Solar NC 6, LLC | Panda Solar NC 6, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 5, LLC | Panda Solar NC 5, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 1.5 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 4, LLC | Panda Solar NC 4, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 3, LLC | Panda Solar NC 3, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 2, LLC | Panda Solar NC 2, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Mar 2019 | Dec 2025 | Solar |
| Panda Solar NC 11, LLC | Panda Solar NC 11, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 10, LLC | Panda Solar NC 10, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | May 2019 | Dec 2025 | Solar |
| Panda Solar NC 1, LLC | Panda Solar NC 1, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Mar 2019 | Dec 2025 | Solar |
| Pamlico Partners Solar | Pamlico Partners Solar, LLC | Washington, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Page Solar | SunStrong Management | Willow Spring, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Nov 2018 | Dec 2025 | Solar |
| Oxford Dam | Duke Energy Carolinas, LLC | Conover, NC | Duke Energy Carolinas (DUK) | 86.5 GWh | Mar 1928 | Dec 2025 | Water |
| Owen Solar | Owen Solar LLC | Lincolnton, NC | Duke Energy Carolinas (DUK) | 6.9 GWh | Mar 2016 | Dec 2025 | Solar |
| Overman Solar | SunStrong Management | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Overhill Solar | Strata Manager, LLC | Clinton, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Ouchchy PV1 | Strata Manager, LLC | Mebane, NC | Duke Energy Carolinas (DUK) | 5.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Organ Church Solar | MN8 Energy LLC | Rockwell, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Jan 2019 | Dec 2025 | Solar |
| Orbit Energy Charlotte | Anaergia | Charlotte, NC | Duke Energy Carolinas (DUK) | 199.9 MWh | Oct 2016 | Dec 2024 | Other Biomass Gas |
| Onslow Power Producers | Cube District Energy, LLC | Jacksonville, NC | Duke Energy Carolinas (DUK) | 11.2 GWh | Oct 2013 | Dec 2025 | Landfill Gas |
| Old Wire Farm | Strata Manager, LLC | Laurel Hill, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Old Pageland Monroe Road Solar Farm | Cypress Creek Renewables | Monroe, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Oct 2015 | Dec 2025 | Solar |
| Old Cedar Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jul 2021 | Dec 2025 | Solar : 99.8% |
| Old Catawba PV 1 | Strata Manager, LLC | Claremont, NC | Duke Energy Carolinas (DUK) | 5.5 GWh | Nov 2015 | Dec 2025 | Solar |
| Old Caroleen Solar Farm | Cypress Creek Renewables | Forest City, NC | Duke Energy Carolinas (DUK) | 2.6 GWh | Jun 2018 | Dec 2025 | Solar |
| Oakwood Solar | SunStrong Management | Mebane, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2021 | Dec 2025 | Solar |
| Oakboro Farm | Headwater Energy, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 6.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Oak Trail Solar, LLC | Leeward Asset Management, LLC | Moyock, NC | PJM Interconnection, LLC (PJM) | 231.7 GWh | Jun 2023 | May 2026 | Solar |
| Oak Solar | Oak Solar LLC | Gaston, NC | PJM Interconnection, LLC (PJM) | 258.7 GWh | Nov 2023 | May 2026 | Solar |
| Northern Cardinal Solar | Terraform Arcadia | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 1.2 GWh | May 2018 | Dec 2025 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| North Carolina Solar III LLC | SRE Utility Solar 1, LLC | Gibson, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Nov 2013 | Dec 2025 | Solar |
| North Carolina Solar Bethea I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Mar 2012 | Dec 2025 | Solar |
| North 301 Solar | North 301 Solar, LLC | Enfield, NC | PJM Interconnection, LLC (PJM) | 38.7 GWh | Nov 2019 | May 2026 | Solar |
| Nitro Solar | USF Surry, LLC | Smitfield, NC | Duke Energy Progress East (CPLE) | 7.7 GWh | Jun 2015 | Dec 2025 | Solar |
| Nickelson Solar, LLC | Sol Systems | Wallace, NC | Duke Energy Progress East (CPLE) | 7.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Nickelson Solar 2 | Nickelson Solar 2, LLC | Wallace, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Aug 2018 | Dec 2025 | Solar |
| Nick Solar | AES Distributed Energy | Liberty, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2014 | Dec 2025 | Solar |
| Newton Grove | SRE Utility Solar 1, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 3.0 GWh | Aug 2015 | Dec 2025 | Solar |
| New Bern Farm | Strata Manager, LLC | Ernul, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Mar 2014 | Dec 2025 | Solar |
| New Bern | Industrial Power Generating Company LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | Jul 2007 | Dec 2025 | Landfill Gas : 95.5% Distillate Fuel Oil : 4.5% |
| Neuse River Solar Farm | Scale Sustainable I, LLC | Raleigh, NC | Duke Energy Carolinas (DUK) | 1.3 GWh | Nov 2011 | Dec 2025 | Solar |
| Neisler Street Solar | Neisler Street Solar I, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 2.7 GWh | Jul 2015 | Dec 2025 | Solar |
| NCSU CCUP Cogeneration Plant | NC State University, Energy Systems | Raleigh, NC | Duke Energy Progress East (CPLE) | 28.7 GWh | Jan 2019 | Dec 2025 | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| NCSU Cates Cogeneration Plant | NC State University, Energy Systems | Raleigh, NC | Duke Energy Progress East (CPLE) | 72.6 GWh | Jul 2012 | Dec 2025 | Natural Gas : 95.0% Distillate Fuel Oil : 5.0% |
| NC 102 Project LLC | NC 102 Project LLC | Midland, NC | Duke Energy Carolinas (DUK) | 141.8 GWh | Aug 2018 | May 2026 | Solar |
| Nashville Farms, LLC | SRE Utility Solar 1, LLC | Nashville, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Nash 97 Solar, LLC | Cypress Creek Renewables | Middlesex, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Nash 97 Solar 2 | Nash 97 Solar 2, LLC | Middlesex, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Sep 2018 | Dec 2025 | Solar |
| Nash 64 Farm | Strata Manager, LLC | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Nash 58 Farm | Strata Manager, LLC | Nashville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Oct 2013 | Dec 2025 | Solar |
| Narrows (NC) | Eagle Creek Renewable Energy, LLC | Badin, NC | Alcoa Power Generating, Inc. - Yadkin Division (YAD) | 362.8 GWh | Jun 1917 | Dec 2025 | Water |
| Nantahala | Duke Energy Carolinas, LLC | Topton, NC | Duke Energy Carolinas (DUK) | 188.4 GWh | Jun 1942 | Dec 2025 | Water |
| Mustang Solar | Dominion Renewable Energy | Robbins, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Jun 2018 | Dec 2025 | Solar |
| Murphy Farm Power, LLC | Duke Energy Renewables Services | Culberson, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Apr 2011 | Dec 2025 | Solar |
| Murphy-Brown LLC | Murphy - Brown LLC | Warsaw, NC | Duke Energy Progress East (CPLE) | 6.0 MWh | Jun 1995 | Apr 2026 | Distillate Fuel Oil |
| Murdock Solar | Cypress Creek Renewables | Clayton, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Dec 2015 | Dec 2025 | Solar |
| Mule Farm Solar, LLC | Headwater Energy, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Apr 2022 | Dec 2025 | Solar |
| Mt Olive Solar 1 | Cypress Creek Renewables | Mt. Olive, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Apr 2013 | Dec 2025 | Solar |
| Moyer Solar | Moyer Solar, LLC | Stoneville, NC | Duke Energy Carolinas (DUK) | 9.9 GWh | Nov 2022 | Dec 2025 | Solar |
| Mountain Island | Duke Energy Carolinas, LLC | Mount Holly, NC | Duke Energy Carolinas (DUK) | 90.0 GWh | Nov 1923 | Dec 2025 | Water |
| Mount Olive Solar | AES Distributed Energy | Mount Olive, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Mount Olive Farm | Strata Manager, LLC | Mount Olive, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Morning View | Cypress Creek Renewables | Seagrove, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Morgan's Corner | Dominion Renewable Energy | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 28.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Morgan Farm, LLC | SRE Utility Solar 1, LLC | Louisburg, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Moorings Farm 2, LLC | Dominion Renewable Energy | LaGrange, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Aug 2017 | Dec 2025 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | Aug 2013 | Dec 2025 | Solar |
| Moore Solar Farm | Strata Manager, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Moore Solar | Moore Solar, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Jan 2018 | Dec 2025 | Solar |
| Montgomery Solar LLC | Oppidum Renewables USA, LLC | Biscoe, NC | Duke Energy Carolinas (DUK) | 36.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Monroe Solar Facility | Duke Energy Carolinas, LLC | Monroe, NC | Duke Energy Progress East (CPLE) | 93.9 GWh | Feb 2017 | May 2026 | Solar |
| Monroe Moore Farm | Heelstone Energy Holdings, LLC | Monroe, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Monroe Middle School | North Carolina Mun Power Agny #1 | Monroe, NC | Duke Energy Carolinas (DUK) | 44.0 MWh | Jul 2006 | Dec 2025 | Distillate Fuel Oil |
| Monroe Generating Station | North Carolina Mun Power Agny #1 | Monroe, NC | Duke Energy Carolinas (DUK) | 1.6 GWh | Mar 2010 | Dec 2025 | Natural Gas : 99.6% |
| Moncure Farm LLC | Strata Manager, LLC | Moncure, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | Mar 2014 | Dec 2025 | Solar |