Directory of Power Plants in New Jersey
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Highland Park Borough Solar | Public Service Elec & Gas Co | Highland Park, NJ | PJM Interconnection, LLC (PJM) | 635.0 MWh | Oct 2019 | Dec 2024 | Solar |
| Love Lane Solar | NJR Clean Energy Ventures Corporation | Upper Deerfield Towns, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Apr 2024 | Dec 2024 | Solar |
| Robin NJ | Greenbacker Renewable Energy Corporation | Robinsville, NJ | PJM Interconnection, LLC (PJM) | 772.0 MWh | Mar 2022 | Dec 2024 | Solar |
| Absegami | Altus Power America Management, LLC | Galloway, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Apr 2021 | Dec 2024 | Solar |
| Cedar Creek (NJ) | Altus Power America Management, LLC | Egg Harbor City, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Apr 2021 | Dec 2024 | Solar |
| DRPA Lindenwold Station Solar Project | Solar Star River SLB, LLC | Lindenwold, NJ | PJM Interconnection, LLC (PJM) | 9.1 GWh | Nov 2021 | Dec 2024 | Solar |
| Canoe Brook Solar | NJR Clean Energy Ventures Corporation | Millburn, NJ | PJM Interconnection, LLC (PJM) | 10.9 GWh | Dec 2022 | Dec 2024 | Solar |
| DRPA Woodcrest Station Solar Project | Solar Star River SLB, LLC | Haddon Township, NJ | PJM Interconnection, LLC (PJM) | 6.0 GWh | Mar 2022 | Dec 2024 | Solar |
| DRPA Ashland Station Solar Project | Solar Star River SLB, LLC | Voorhees Township, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Mar 2022 | Dec 2024 | Solar |
| DRPA Ferry Ave Station Solar Project | Solar Star River SLB, LLC | City of Camden, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Canal Road Solar | NJR Clean Energy Ventures Corporation | Franklin, NJ | PJM Interconnection, LLC (PJM) | 6.5 GWh | May 2023 | Dec 2024 | Solar |
| Emerald Kemble, LLC | Emerald Kemble, LLC | Morristown, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Apr 2022 | Dec 2024 | Solar |
| Gloucester | Altus Power America Management, LLC | Gloucester City, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Ramapo | Altus Power America Management, LLC | Mahwah, NJ | PJM Interconnection, LLC (PJM) | 4.0 GWh | Jun 2019 | Dec 2024 | Solar |
| Toms River CSG | MN8 Energy LLC | Toms River, NJ | PJM Interconnection, LLC (PJM) | 6.5 GWh | Aug 2023 | Dec 2024 | Solar |
| Brookdale CC BTM at Lincroft | Solar DG NJ Brookdale, LLC | Lincroft, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Nov 2022 | Dec 2024 | Solar |
| ADP Parsippany NJ | Distributed Solar Development, LLC | Parsippany, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Bayer - Whippany, NJ | Distributed Solar Development, LLC | Whippany, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2023 | Dec 2024 | Solar |
| BEMS West Solar CSG | Solar DG NJ BEMS West, LLC | Southampton, NJ | PJM Interconnection, LLC (PJM) | 3.5 GWh | Sep 2023 | Dec 2024 | Solar |
| Dynamic Energy NJ - Ferrero | Distributed Solar Development, LLC | Somerset, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Harrah's Atlantic City - POI 2 (Self Par | Distributed Solar Development, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Aug 2024 | Dec 2024 | Solar |
| Old Bridge Global Landfill CSG | NJR Clean Energy Ventures Corporation | Old Bridge, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Sep 2023 | Dec 2024 | Solar |
| Solops 371 Hoes LLC | Solops 371 Hoes LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Hammonton-High School Solar | Madison Energy Investments LLC | Atlantic, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2022 | Dec 2024 | Solar |
| Franklin Solar 1 LLC Community Solar | Dimension Energy LLC | Somerset, NJ | PJM Interconnection, LLC (PJM) | 4.3 GWh | Sep 2023 | Dec 2024 | Solar |
| Franklin Solar 2 LLC Community Solar | Dimension Energy LLC | Somerset, NJ | PJM Interconnection, LLC (PJM) | 5.5 GWh | Sep 2023 | Dec 2024 | Solar |
| Mayhill Solar LLC Community Solar | Dimension Energy LLC | Saddle Brook, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Sep 2023 | Dec 2024 | Solar |
| Elizabeth Seaport Bldg A Solar | Prologis Logistics Services Incorporated | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Dec 2021 | Dec 2024 | Solar |
| Cranbury 0210 Solar | Prologis Logistics Services Incorporated | Cranbury, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Ports Newark 8201 Solar | Prologis Logistics Services Incorporated | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2022 | Dec 2024 | Solar |
| Ports Jersey City Solar | Prologis Logistics Services Incorporated | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Jul 2020 | Dec 2024 | Solar |
| Lister Avenue Solar | Prologis Logistics Services Incorporated | Newark, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Jun 2022 | Dec 2024 | Solar |
| Edison 7205 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Oct 2022 | Dec 2024 | Solar |
| Edison 0308 Solar | Prologis Logistics Services Incorporated | Edison, NJ | PJM Interconnection, LLC (PJM) | 3.4 GWh | Mar 2022 | Dec 2024 | Solar |
| Port Reading 8 Solar | Prologis Logistics Services Incorporated | Carteret, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Interstate 3 Solar | Prologis Logistics Services Incorporated | South Brunswick, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Apr 2022 | Dec 2024 | Solar |
| Spano Solar - Belmar Wall | Belmar Gateway Solar LLC | Belmar, NJ | New York Independent System Operator (NYIS) | 2.0 GWh | Oct 2022 | Dec 2024 | Solar |
| THD Quicksilver - MDC Perth Amboy | THD NJ Riverview Main Distribution Center Solar Project 2020, LL | Perth Amboy, NJ | New York Independent System Operator (NYIS) | 4.6 GWh | Oct 2022 | Dec 2024 | Solar |
| Bay Avenue CDG | Hartz Solar, LLC | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
| Tom's River (Lowes) | Madison Energy Investments LLC | Toms River, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Dec 2022 | Dec 2024 | Solar |
| Spano Solar - Ocean County Landfill - CS | Distributed Solar Development, LLC | Manchester Township, NJ | PJM Interconnection, LLC (PJM) | 4.2 GWh | Sep 2022 | Dec 2024 | Solar |
| Township of Monroe - Williamstown HS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Township of Monroe - Williamstown MS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Rutgers Busch Livingston Lot B & C | Bowser Road Solar Project 2021, LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2023 | Dec 2024 | Solar |
| Rutgers Cook Douglass Lot 97 & 98a | Dudley Road Solar Project 2021, LLC | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Middlesex Vo Tech Solar 1 LLC | Navisun LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Bowser Road Solar Project 2021, LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
| Howell (Lowes) | Madison Energy Investments LLC | Howell, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Feb 2023 | Dec 2024 | Solar |
| Hamilton | Madison Energy Investments LLC | Hamilton, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Mar 2023 | Dec 2024 | Solar |
| NJ Airport Solar Project A | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | May 2023 | Dec 2024 | Solar |
| NJ Airport Solar Project B | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | May 2023 | Dec 2024 | Solar |
| NJ Airport Solar Project C | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2023 | Dec 2024 | Solar |
| NJ Airport Solar Project D | SoCore Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | May 2023 | Dec 2024 | Solar |
| Newark Solar 1 LLC | Dimension Energy LLC | Newark, NJ | PJM Interconnection, LLC (PJM) | 27.0 MWh | Oct 2024 | Dec 2024 | Solar |
| ADP Roseland, NJ | ADP Boulevard Solar Project 2021, LLC | Roseland, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Feb 2024 | Dec 2024 | Solar |
| Hoffmann LaRoche | PB Nutclif Master, LLC | Nutley, NJ | PJM Interconnection, LLC (PJM) | 50.0 GWh | Apr 2004 | Aug 2025 | Natural Gas : 99.5% |
| Great Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Paterson, NJ | PJM Interconnection, LLC (PJM) | 6.3 GWh | Nov 1985 | Aug 2025 | Water |
| Bergen Generating Station | Bergen Generating Station | Ridgefield, NJ | PJM Interconnection, LLC (PJM) | 3.0 TWh | Apr 1959 | Sep 2025 | Natural Gas : 97.9% Kerosene : 2.1% |
| PSEG Linden Generating Station | Linden Combined Cycle | Linden, NJ | PJM Interconnection, LLC (PJM) | 4.8 TWh | May 1995 | Sep 2025 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
| PSEG Salem Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 17.2 TWh | May 1971 | Sep 2025 | Nuclear |
| PSEG Sewaren Generating Station | Sewaren Generating Station | Sewaren, NJ | PJM Interconnection, LLC (PJM) | 2.0 TWh | Oct 1948 | Sep 2025 | Natural Gas : 99.9% |
| Howard Down | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 60.1 GWh | May 2012 | Sep 2025 | Natural Gas : 99.9% |
| PSEG Hope Creek Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 10.2 TWh | Nov 1986 | Sep 2025 | Nuclear |
| CIP II/AR Bridgewater Holdings - NJCOE | COE Bridgewater LLC c/o Thor Equities, LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 26.4 GWh | Oct 2002 | Sep 2025 | Natural Gas : 99.6% |
| Merck Rahway Power Plant | Merck & Co Inc | Rahway, NJ | PJM Interconnection, LLC (PJM) | 33.4 GWh | Dec 1976 | Sep 2025 | Natural Gas : 99.4% Solar : 0.5% |
| Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 161.2 GWh | Feb 1991 | Sep 2025 | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.7% |
| Covanta Essex Company | Covanta Essex Company | Newark, NJ | PJM Interconnection, LLC (PJM) | 484.2 GWh | Oct 1990 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Linden Cogen Plant | EFS Cogen Holdings I LLC | Linden, NJ | New York Independent System Operator (NYIS) | 5.7 TWh | Feb 1992 | Sep 2025 | Natural Gas : 98.3% Other Gas : 1.1% Distillate Fuel Oil : 0.6% |
| Vicinity Energy Trenton, L.P. | Vicinity Energy Trenton, L.P. | Trenton, NJ | PJM Interconnection, LLC (PJM) | 117.0 MWh | Nov 1983 | Sep 2025 | Natural Gas : 94.4% Distillate Fuel Oil : 5.6% |
| Rutgers Biomedical and Health Cogen | Rutgers, The State University of NJ | Newark, NJ | PJM Interconnection, LLC (PJM) | 49.9 GWh | Jun 1989 | Sep 2025 | Natural Gas |
| Paulsboro Refinery | Paulsboro Refining Company - LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 347.3 GWh | Jul 1982 | Sep 2025 | Natural Gas : 57.9% Other Gas : 42.1% |
| Wheelabrator Gloucester LP | Wheelabrator Environmental Systems | Westville, NJ | PJM Interconnection, LLC (PJM) | 82.0 GWh | Dec 1989 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Union County Resource Recovery | Reworld Union (NJ), LLC | Rahway, NJ | PJM Interconnection, LLC (PJM) | 288.3 GWh | Jan 1994 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Bayville Central Facility | Ocean County Utilities Auth | Bayville, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Aug 1988 | Sep 2025 | Other Biomass Gas : 78.5% Natural Gas : 9.1% Solar : 7.2% Distillate Fuel Oil : 5.3% |
| Bristol Myers Squibb New Brunswick | Bristol-Myers Squibb Co | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 56.8 GWh | Jun 1992 | Sep 2025 | Natural Gas : 99.8% |
| Red Oak Power LLC | Red Oak Operating Services LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 3.3 TWh | Feb 2002 | Sep 2025 | Natural Gas |
| Middlesex County Utilities Authority | Middlesex County Utilities Authority | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 108.3 GWh | Dec 1960 | Sep 2025 | Landfill Gas |
| Bayway Refinery | Phillips 66 | Linden, NJ | PJM Interconnection, LLC (PJM) | 69.6 GWh | Nov 1967 | Sep 2025 | Waste Heat |
| Jersey-Atlantic Wind Farm | Leeward Asset Management, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 19.1 GWh | Feb 2006 | Sep 2025 | Wind |
| West Deptford Energy Station | West Deptford Energy LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 534.9 GWh | Sep 2014 | Sep 2025 | Natural Gas |
| Bayonne Energy Center | Bayonne Energy Center LLC | Bayonne, NJ | New York Independent System Operator (NYIS) | 924.9 GWh | May 2012 | Sep 2025 | Natural Gas |
| Woodbridge Energy Center | Woodbridge Energy Center | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 3.5 TWh | Sep 2015 | Sep 2025 | Natural Gas |
| Newark Energy Center | Hartree Partners LP | Newark, NJ | PJM Interconnection, LLC (PJM) | 2.6 TWh | Aug 2015 | Sep 2025 | Natural Gas |
| Princeton University Cogeneration | Trustees of Princeton University | Princeton, NJ | PJM Interconnection, LLC (PJM) | 69.2 GWh | Sep 1996 | Sep 2025 | Natural Gas : 67.0% Solar : 31.8% Distillate Fuel Oil : 1.2% |
| Howell Solar | MN8 Energy LLC | Howell, NJ | PJM Interconnection, LLC (PJM) | 8.3 GWh | Feb 2016 | Sep 2025 | Solar |
| Raritan Solar | MN8 Energy LLC | Ringoes, NJ | PJM Interconnection, LLC (PJM) | 11.9 GWh | Mar 2016 | Sep 2025 | Solar |
| Bordentown Solar | MN8 Energy LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 2015 | Sep 2025 | Solar |
Browse Power Plants By New Jersey Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Salem County, NJ | # 1 | 8 | 27.4 TWh |
| Union County, NJ | # 2 | 21 | 11.0 TWh |
| Middlesex County, NJ | # 3 | 71 | 9.8 TWh |
| Essex County, NJ | # 4 | 27 | 3.3 TWh |
| Bergen County, NJ | # 5 | 11 | 3.0 TWh |
| Gloucester County, NJ | # 6 | 24 | 1.2 TWh |
| Hudson County, NJ | # 7 | 27 | 1.1 TWh |
| Ocean County, NJ | # 8 | 23 | 590.3 GWh |
| Camden County, NJ | # 9 | 21 | 344.0 GWh |
| Burlington County, NJ | # 10 | 41 | 326.4 GWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Cumberland County, NJ | # 11 | 23 | 306.6 GWh |
| Mercer County, NJ | # 12 | 27 | 228.1 GWh |
| Monmouth County, NJ | # 13 | 30 | 217.8 GWh |
| Atlantic County, NJ | # 14 | 23 | 167.2 GWh |
| Hunterdon County, NJ | # 15 | 19 | 158.9 GWh |
| Somerset County, NJ | # 16 | 24 | 107.4 GWh |
| Morris County, NJ | # 17 | 16 | 78.2 GWh |
| Passaic County, NJ | # 18 | 6 | 56.7 GWh |
| Sussex County, NJ | # 19 | 11 | 33.7 GWh |
| Cape May County, NJ | # 20 | 5 | 6.6 GWh |