Directory of Power Plants in Illinois
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Granite City Works | United States Steel Granite City Works | Granite City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 446.0 GWh | May 2010 | Jun 2026 | Purchased Steam : 49.2% Natural Gas : 46.2% Blast Furnace Gas : 4.6% |
| Old Trail Wind Farm | Old Trail Wind Farm LLC | Ellsworth, IL | PJM Interconnection, LLC (PJM) | 570.5 GWh | Nov 2007 | Jun 2026 | Wind |
| MPH Elwood | MPH Elwood, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 1999 | May 2026 | Natural Gas |
| Top Hat Wind | Appalachian Power Co | Beason, IL | PJM Interconnection, LLC (PJM) | 215.5 GWh | Nov 2025 | Feb 2026 | Wind |
| McLeansboro | City of McLeansboro - (IL) | McLeansboro, IL | Midcontinent Independent System Operator, Inc. (MISO) | 42.0 MWh | Nov 1950 | Dec 2025 | Distillate Fuel Oil |
| Elba Solar LLC | Elba Solar LLC | Williamsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2023 | Dec 2025 | Solar |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2025 | Solar |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Sep 2023 | Dec 2025 | Solar |
| Five Oaks Gas Recovery | WM Renewable Energy LLC | Taylorville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 23.7 GWh | Jan 2008 | Dec 2025 | Landfill Gas |
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2025 | Solar |
| Kankakee 2 | Kankakee Solar 2 LLC | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2022 | Dec 2025 | Solar |
| Amazon MDW7 Solar Project | Solar Star Prime 6, LLC | Monee, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Oct 2022 | Dec 2025 | Solar |
| IL Sidney Project1 | IL Sidney Project1, LLC | Sidney, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Mar 2021 | Dec 2025 | Solar |
| Clay FC | Clay FC, LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Jun 2021 | Dec 2025 | Solar |
| IL West Hallock Project1 | IL West Hallock Project1, LLC | Edelstein, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Jul 2021 | Dec 2025 | Solar |
| Solar Star Urbana Landfill East | Solar Star Urbana Landfill East, LLC | Urbana, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Sep 2021 | Dec 2025 | Solar |
| Solar Star Urbana Landfill Central | Solar Star Urbana Landfill Central, LLC | Urbana, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Oct 2021 | Dec 2025 | Solar |
| OE IL Solar 3 | OE IL Solar 3, LLC | Oregon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Feb 2022 | Dec 2025 | Solar |
| French Road Solar II | French Road Solar II, LLC | Burlington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Feb 2022 | Dec 2025 | Solar |
| Rockford Solar | Rockford Solar, LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2021 | Dec 2025 | Solar |
| Altamont | City of Altamont - (IL) | Altamont, IL | Midcontinent Independent System Operator, Inc. (MISO) | 75.0 MWh | Dec 2001 | Dec 2025 | Distillate Fuel Oil |
| Industrial Park | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 838.0 MWh | Jun 2001 | Dec 2025 | Distillate Fuel Oil |
| Briscoe 1A | 7th Road Solar 1, LLC (Briscoe 1A) | Tonica, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jan 2023 | Dec 2025 | Solar |
| Briscoe 2A | 7th Road Solar 2, LLC (Briscoe 2A) | Lostant, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jan 2023 | Dec 2025 | Solar |
| Avenue A Generator Sets | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 224.0 MWh | Aug 2000 | Dec 2025 | Distillate Fuel Oil |
| Alsey | Prairie Power, Inc | Alsey, IL | Midcontinent Independent System Operator, Inc. (MISO) | 34.7 GWh | May 1999 | Dec 2025 | Natural Gas : 99.8% |
| Tilton | Tilton Energy LLC | Tilton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 53.8 GWh | May 1999 | Dec 2025 | Natural Gas |
| Interstate | City of Springfield - (IL) | Springfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 57.5 GWh | Aug 1997 | Dec 2025 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Pearl Station | Prairie Power, Inc | Pearl, IL | Midcontinent Independent System Operator, Inc. (MISO) | 64.0 MWh | May 1973 | Dec 2025 | Distillate Fuel Oil |
| Winnetka | Village of Winnetka - (IL) | Winnetka, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Dec 1947 | Dec 2025 | Natural Gas : 90.3% Distillate Fuel Oil : 9.7% |
| Waterloo | City of Waterloo - (IL) | Waterloo, IL | Midcontinent Independent System Operator, Inc. (MISO) | 751.0 MWh | May 1946 | Dec 2025 | Natural Gas : 73.6% Distillate Fuel Oil : 26.4% |
| Gooseberry Solar, LLC | Reactivate | Ford Heights, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Oct 2024 | Dec 2025 | Solar |
| Monee Solar 1, LLC | Reactivate | Peotone, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Mulberry Solar, LLC | Reactivate | Granite City, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Oct 2024 | Dec 2025 | Solar |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Oct 2024 | Dec 2025 | Solar |
| N Baker Road 2 | Greenbacker Renewable Energy Corporation | Lena, IL | PJM Interconnection, LLC (PJM) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| N Baker Road | Greenbacker Renewable Energy Corporation | Lena, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Mar 2025 | Dec 2025 | Solar |
| N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Oct 2024 | Dec 2025 | Solar |
| Tully 1 | Greenbacker Renewable Energy Corporation | Morris, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2025 | Dec 2025 | Solar |
| Lobelia 1 | Greenbacker Renewable Energy Corporation | Harvard, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Cedarville (IL) | Generate Capital | Freeport, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Apr 2024 | Dec 2025 | Solar |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Jul 2024 | Dec 2025 | Solar |
| 9521 US 14 SOLAR 1, LLC | Generate Capital | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | May 2024 | Dec 2025 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2024 | Dec 2025 | Solar |
| Trinity Freeport | Generate Capital | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2024 | Dec 2025 | Solar |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Breezewood | SunStrong Management, LLC | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Galt | SunStrong Management, LLC | Sterling, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Towanda | Dimension Energy LLC | Shirley, IL | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Lawrence Solar 1 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG Plato Solar 1 LLC | SunVest Solar LLC | Elgin, IL | PJM Interconnection, LLC (PJM) | 2.5 GWh | Jul 2025 | Dec 2025 | Solar |
| SV CSG Bishop 1 LLC | SunVest Solar LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 106.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Schmidt CSG 1 | SunVest Solar LLC | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| DeKalb Taylor LLC | SunVest Solar LLC | DeKalb, IL | PJM Interconnection, LLC (PJM) | 538.0 MWh | Oct 2025 | Dec 2025 | Solar |
| SV CSG German Valley 1 LLC | SunVest Solar LLC | German Valley, IL | PJM Interconnection, LLC (PJM) | 2.3 GWh | May 2025 | Dec 2025 | Solar |
| SV CSG Wagner A LLC | SunVest Solar LLC | Sparta, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG Wagner B LLC | SunVest Solar LLC | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| IL Joliet 1101 Cherry Hl Rd | Catalyze Joliet 1101 Cherry Hill Road Microgrid, LLC | Joliet, IL | PJM Interconnection, LLC (PJM) | 64.0 MWh | Nov 2025 | Dec 2025 | Solar |
| IL Rochelle 975 S. Caron Rd | Catalyze Rochelle Wiscold Drive Microgrid, LLC | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.4 GWh | May 2025 | Dec 2025 | Solar |
| Vermilion Solar II LLC CSG | AES Clean Energy | Pontiac, IL | PJM Interconnection, LLC (PJM) | 357.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Vermilion Solar I LLC CSG | AES Clean Energy | Pontiac, IL | PJM Interconnection, LLC (PJM) | 200.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Triple S Solar I LLC CSG | AES Clean Energy | Kansas, IL | Midcontinent Independent System Operator, Inc. (MISO) | 381.0 MWh | Sep 2025 | Dec 2025 | Solar |
| AES Bend Solar II, LLC CSG | AES Clean Energy | Rockford, IL | PJM Interconnection, LLC (PJM) | 609.0 MWh | Sep 2025 | Dec 2025 | Solar |
| AES Bend Solar I, LLC CSG | AES Clean Energy | Rockford, IL | PJM Interconnection, LLC (PJM) | 369.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2024 | Dec 2025 | Solar |
| DG Harlem Solar | DG Harlem, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Apr 2024 | Dec 2025 | Solar |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 3.2 GWh | Oct 2023 | Dec 2025 | Solar |
| Reynolds | City of Springfield - (IL) | Springfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 179.0 MWh | Oct 1970 | Dec 2025 | Distillate Fuel Oil |
| Abel Solar | SoCore Energy LLC | Morrison, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2021 | Dec 2025 | Solar |
| Bunker Hill Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Oct 2021 | Dec 2025 | Solar |
| DPC York | SoCore Energy LLC | Thomson, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jul 2019 | Dec 2025 | Solar |
| Harmony Solar Project | SoCore Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Illinois PV Knox 1B | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2024 | Dec 2025 | Solar |
| Macomb 2A | SoCore Energy LLC | Macomb, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| Rockford Plant | SoCore Energy LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Round Grove 1 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Oct 2021 | Dec 2025 | Solar |
| Round Grove 2 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Illinois PV Knox 1A | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Aug 2024 | Dec 2025 | Solar |
| Unity Solar Project (IL) | SoCore Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 2023 | Dec 2025 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Dec 2023 | Dec 2025 | Solar |
| South Main Street | Rochelle Municipal Utilities - (IL) | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 1967 | Dec 2025 | Distillate Fuel Oil |
| Red Bud | City of Red Bud - (IL) | Red Bud, IL | Midcontinent Independent System Operator, Inc. (MISO) | 262.0 MWh | Feb 1959 | Dec 2025 | Distillate Fuel Oil |
| Princeton (IL) | City of Princeton - (IL) | Princeton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 813.0 MWh | Jun 1953 | Dec 2025 | Natural Gas : 99.8% |
| Marion Solar 4b LLC | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Putnam Solar 1 | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Apr 2024 | Dec 2025 | Solar |
| Putnam Solar 1B | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2024 | Dec 2025 | Solar |
| Marshall (IL) | City of Marshall - (IL) | Marshall, IL | Midcontinent Independent System Operator, Inc. (MISO) | 167.0 MWh | Mar 2002 | Dec 2025 | Distillate Fuel Oil |
| Kankakee Solar 1 | Pivot Energy | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Apr 2024 | Dec 2025 | Solar |
| Des Plaines 7-SLCHI819 | Prologis Logistics Services Incorporated | Des Plaines, IL | PJM Interconnection, LLC (PJM) | 709.0 MWh | May 2025 | Dec 2025 | Solar |
| NL IL - Kiwi | Standard Solar | Pinckneyville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | May 2025 | Dec 2025 | Solar |
| Medanos Solar LLC | Dimension Energy LLC | Homer, IL | Midcontinent Independent System Operator, Inc. (MISO) | 96.0 MWh | Nov 2025 | Dec 2025 | Solar |
| South Belleville Solar, LLC | Dimension Energy LLC | Smithton Township, IL | Midcontinent Independent System Operator, Inc. (MISO) | 385.0 MWh | Oct 2025 | Dec 2025 | Solar |