Directory of Power Plants in Illinois
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Mulligan Solar, LLC | Mulligan Solar | Broadwell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 145.5 GWh | Jun 2022 | May 2026 | Solar |
| USS Goodrich Solar | Standard Solar | Bonfield, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Jul 2022 | Dec 2025 | Solar |
| Big River Solar | Big River Solar, LLC | Norris City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 313.2 GWh | Jul 2022 | May 2026 | Solar |
| Kankakee 2 | Kankakee Solar 2 LLC | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2022 | Dec 2025 | Solar |
| Amazon MDW7 Solar Project | Solar Star Prime 6, LLC | Monee, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Oct 2022 | Dec 2025 | Solar |
| DePue Holdings, LLC | DePue Holdings, LLC | DePue, IL | Midcontinent Independent System Operator, Inc. (MISO) | 35.0 GWh | Jan 2023 | Dec 2025 | Solar |
| Elba Solar LLC | Elba Solar LLC | Williamsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2023 | Dec 2025 | Solar |
| Briscoe 1A | 7th Road Solar 1, LLC (Briscoe 1A) | Tonica, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jan 2023 | Dec 2025 | Solar |
| Briscoe 2A | 7th Road Solar 2, LLC (Briscoe 2A) | Lostant, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jan 2023 | Dec 2025 | Solar |
| Invenergy Nelson Expansion LLC | Invenergy Services LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 863.1 GWh | Mar 2023 | May 2026 | Natural Gas |
| Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 584.0 GWh | Apr 2023 | May 2026 | Wind |
| Ahern Community Solar I, LLC | Ahern Community Solar I, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 3.1 GWh | Apr 2023 | Dec 2025 | Solar |
| CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 6.5 TWh | May 2023 | May 2026 | Natural Gas |
| SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG Barrass Farms II LL | SV CSG Barrass Farms II LLC | Marion, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2025 | Solar |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Sep 2023 | Dec 2025 | Solar |
| Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 300.2 GWh | Sep 2023 | May 2026 | Wind |
| High Point Solar LLC | Acciona Energy USA Global, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 170.6 GWh | Oct 2023 | May 2026 | Solar |
| Prairie Creek Solar | Sol Systems | Jacksonville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 57.8 GWh | Oct 2023 | May 2026 | Solar |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 3.2 GWh | Oct 2023 | Dec 2025 | Solar |
| Midland Wind | Avangrid Power LLC | Kewane, IL | PJM Interconnection, LLC (PJM) | 350.9 GWh | Nov 2023 | May 2026 | Wind |
| Moraine Sands Wind Power | Moraine Sands Wind Power, LLC | Mason City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 562.0 GWh | Nov 2023 | May 2026 | Wind |
| River Ferry Solar 1 | River Ferry Solar 1, LLC | West Union, IL | PJM Interconnection, LLC (PJM) | 309.1 GWh | Nov 2023 | May 2026 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 2023 | Dec 2025 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Dec 2023 | Dec 2025 | Solar |
| S-Pulaski Solar | SoCore Energy LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Jan 2024 | Dec 2025 | Solar |
| Earp Solar, LLC | Birch Creek Power, LLC | Monmouth, IL | Midcontinent Independent System Operator, Inc. (MISO) | 76.3 GWh | Mar 2024 | May 2026 | Solar |
| Cedarville (IL) | Generate Capital | Freeport, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Apr 2024 | Dec 2025 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2024 | Dec 2025 | Solar |
| DG Harlem Solar | DG Harlem, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Apr 2024 | Dec 2025 | Solar |
| Marion Solar 4b LLC | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Putnam Solar 1 | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Apr 2024 | Dec 2025 | Solar |
| Kankakee Solar 1 | Pivot Energy | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Apr 2024 | Dec 2025 | Solar |
| Sand Prairie Solar | DG Sand Prairie, LLC | Green Valley, IL | PJM Interconnection, LLC (PJM) | 3.2 GWh | Apr 2024 | Dec 2025 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | May 2024 | Dec 2025 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2024 | Dec 2025 | Solar |
| Putnam Solar 1B | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2024 | Dec 2025 | Solar |
| St. Clair Solar 3 | Pivot Energy | Washington Park, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | May 2024 | Dec 2025 | Solar |
| N Solon Road (North) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | May 2024 | Dec 2025 | Solar |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Jul 2024 | Dec 2025 | Solar |
| Trinity Freeport | Generate Capital | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2024 | Dec 2025 | Solar |
| Pontiac 1A | Solar DG IL 3 LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Jul 2024 | Dec 2025 | Solar |
| USS Lowe Solar | SRC Partnership 15 LLC | Kankakee, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Breezewood | SunStrong Management, LLC | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Galt | SunStrong Management, LLC | Sterling, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Hickory Solar | Hickory Solar LLC | Jerseyville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 254.8 GWh | Aug 2024 | May 2026 | Solar |
| Illinois PV Knox 1B | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2024 | Dec 2025 | Solar |
| Illinois PV Knox 1A | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Aug 2024 | Dec 2025 | Solar |
| Kimmel Road Solar, LLC | Birch Creek Power, LLC | Du Quoin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 110.5 GWh | Sep 2024 | May 2026 | Solar |
| Maple Flats | Invenergy Services LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 503.5 GWh | Oct 2024 | May 2026 | Solar |
| Double Back Diamond | Double Back Diamond Solar Power, LLC | Virden, IL | Midcontinent Independent System Operator, Inc. (MISO) | 961.4 GWh | Oct 2024 | May 2026 | Solar |
| Gooseberry Solar, LLC | Reactivate | Ford Heights, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Oct 2024 | Dec 2025 | Solar |
| Monee Solar 1, LLC | Reactivate | Peotone, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Mulberry Solar, LLC | Reactivate | Granite City, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Oct 2024 | Dec 2025 | Solar |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Oct 2024 | Dec 2025 | Solar |
| N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Oct 2024 | Dec 2025 | Solar |
| Walldog | SunStrong Management, LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 210.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Wolf Run Solar | Wolf Run Solar LLC | Chapin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 305.3 GWh | Oct 2024 | May 2026 | Solar |
| Kankakee Solar 3 | Pivot Energy | Manteno, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Oct 2024 | Dec 2025 | Solar |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Crawford 1 Solar | SRC Partnership 14 LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Hoppe Nitzberg Solar 1 | SRC Partnership 14 LLC | Kingston, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Hoppe Nitzberg Solar 1A | SRC Partnership 14 LLC | Kingston, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Engel Solar 1A | SRC Partnership 14 LLC | Sandwich, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Oct 2024 | Dec 2025 | Solar |
| Lobelia 1 | Greenbacker Renewable Energy Corporation | Harvard, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Nov 2024 | Dec 2025 | Solar |
| 9521 US 14 SOLAR 1, LLC | Generate Capital | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Dakota | SunStrong Management, LLC | Rock City, IL | PJM Interconnection, LLC (PJM) | 82.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Lawrence Solar 1 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Schmidt CSG 1 | SunVest Solar LLC | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG Wagner A LLC | SunVest Solar LLC | Sparta, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG Wagner B LLC | SunVest Solar LLC | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Harmony Solar Project | SoCore Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Macomb 2A | SoCore Energy LLC | Macomb, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| Rockford Plant | SoCore Energy LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Unity Solar Project (IL) | SoCore Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Coffeen Solar BESS | Vistra Corp | Coffeen, IL | Midcontinent Independent System Operator, Inc. (MISO) | 92.6 GWh | Nov 2024 | May 2026 | Solar |
| Baldwin Solar BESS | Vistra Corp | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 146.6 GWh | Nov 2024 | May 2026 | Solar |
| Armstrong 1 | Greenbacker Renewable Energy Corporation | Greenwood, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Machesney Park | Solar DG IL 1 LLC | Machesney Park, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Boomtown Renewable Energy Center | Union Electric Co - (MO) | Carmi, IL | Midcontinent Independent System Operator, Inc. (MISO) | 289.9 GWh | Nov 2024 | May 2026 | Solar |
| Cass County Renewable Energy Center | Union Electric Co - (MO) | Beardstown, IL | Midcontinent Independent System Operator, Inc. (MISO) | 305.9 GWh | Nov 2024 | May 2026 | Solar |
| Illinois PV Knox 3A | SoCore Energy LLC | Galesburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Illinois PV Knox 3B | SoCore Energy LLC | Galesburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Mound City Solar | Mound City Solar PV | Mound City, IL | PJM Interconnection, LLC (PJM) | 8.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Pope Creek Solar PV | Pope Creek Solar, LLC | Aledo, IL | PJM Interconnection, LLC (PJM) | 9.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Briscoe Solar 1 | SRC Partnership 14 LLC | Tonica, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Clark Solar 1 | SRC Partnership 14 LLC | San Jose, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Clark Solar 1A | SRC Partnership 14 LLC | San Jose, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Heinsohn Solar 2 | SRC Partnership 14 LLC | Kingston, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Nov 2024 | Nov 2025 | Solar |
| Heinsohn Solar 2A | SRC Partnership 14 LLC | Kingston, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Nov 2024 | Dec 2025 | Solar |
| USS Vermilion Solar 1 LLC (Vermilion 1) | SRC Partnership 15 LLC | Fithian, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2024 | Dec 2025 | Solar |