Directory of Electric Companies in the United States
Company Name | Company Location | Utility Type | Power Plants | EIA Annual Generation | EIA Latest Generation | FERC Lastest Date | FERC 2024Q4 Seller Transactions | FERC 2024Q4 Buyer Transactions |
---|---|---|---|---|---|---|---|---|
Musselshell Wind Project LLC | Independent Power Producer|Investor-Owned Utility | 2 | 54.0 GWh | Dec 2024 | - | |||
Montevue Lane Solar LLC | Commercial | 1 | 22.0 GWh | Dec 2024 | - | |||
MM Prince William Energy LLC | Independent Power Producer | 1 | 47.0 GWh | Dec 2023 | - | |||
Midlothian Energy LLC | Independent Power Producer | 1 | 6.9 TWh | Apr 2025 | - | |||
MF Mesa Lane LLC | Independent Power Producer | 1 | 3.5 GWh | Dec 2024 | - | |||
MEC Holdings LLC | Independent Power Producer | 1 | 3.0 TWh | Dec 2024 | - | |||
Massachusetts WTR Rauth-Deer I | Winthrop, MA | Political Subdivision | 1 | 37.9 GWh | Apr 2025 | - | ||
Mendocino Forest Products | Windsor, CA | Commercial | 1 | 121.6 GWh | Apr 2025 | - | ||
MC1 Solar Farm, LLC | Williamston, NC | Independent Power Producer | 1 | 9.4 GWh | Dec 2024 | - | ||
Maryland Environmental Service | Westover, MD | State-Owned Utility | 1 | 4.2 GWh | Apr 2025 | - | ||
Marlboro Mushroom | West Grove, PA | Commercial | 1 | 1.3 GWh | Dec 2024 | - | ||
Monument Generating Station, LLC | Washington, DC | - | - | - | Apr 2025 | $41.75k | ||
Montpelier Generating Station, LLC | Washington, DC | - | - | - | Apr 2025 | $1.87M | ||
MFT Energy US Power LLC | Washington, DC | - | - | - | Mar 2025 | $2.04M | ||
Madison Ess, LLC | Wakefield, MA | - | - | - | Mar 2025 | $361.23k | ||
Madison BTM, LLC | Wakefield, MA | - | - | - | Mar 2025 | $48.23k | ||
MM Tulare Energy LLC | Visalia, CA | Independent Power Producer | 1 | 10.4 GWh | Dec 2023 | - | ||
Madison Energy Investments LLC | Vienna, VA | Independent Power Producer | 29 | 63.5 GWh | Jan 2025 | - | ||
Markum Solar Farm, LLC | Valley Mills, TX | Independent Power Producer | 1 | 144.8 GWh | Apr 2025 | - | ||
Mesquite Solar 5, LLC | Valhalla, NY | - | - | - | Apr 2025 | $2.23M | ||
Mesquite Solar 4, LLC | Valhalla, NY | - | - | - | Apr 2025 | $1.14M | ||
Marco DM Holdings, L.L.C. | Valhalla, NY | - | - | - | Mar 2025 | $18.20M | $18.20M | |
Madera DP 2, LLC | Valencia, CA | Independent Power Producer | 1 | 12.9 GWh | Dec 2024 | - | ||
Midamerican Energy Co | Urbandale, IA | Investor-Owned Utility | 62 | 42.6 TWh | Apr 2025 | Apr 2025 | $221.46M | $16.35M |
Montville Power LLC | Uncasville, CT | Independent Power Producer | 1 | 26.9 GWh | Dec 2024 | Mar 2025 | $4.44M | |
Madison Energy Holdings LLC | Tysons, VA | Independent Power Producer | 52 | 129.0 GWh | Dec 2024 | - | ||
Marco Power Inc | Twin Falls, ID | Independent Power Producer | 1 | 2.5 GWh | Oct 2024 | - | ||
MRP San Joaquin Energy LLC. | Tracy, CA | Independent Power Producer | 3 | 1.0 TWh | Apr 2025 | Apr 2025 | $37.57M | |
Minnesota Solar CSG 9, LLC | Toronto | Independent Power Producer | 1 | 8.3 GWh | Dec 2024 | - | ||
Minnesota Solar CSG 8, LLC | Toronto | Independent Power Producer | 1 | 5.1 GWh | Dec 2024 | - | ||
Minnesota Solar CSG 4, LLC | Toronto | Independent Power Producer | 1 | 5.3 GWh | Dec 2024 | - | ||
Minnesota Solar CSG 21, LLC | Toronto | Independent Power Producer | 1 | 4.0 GWh | Dec 2024 | - | ||
Minnesota Solar CSG 19, LLC | Toronto | Independent Power Producer | 1 | 8.7 GWh | Dec 2024 | - | ||
Minnesota Solar CSG 1, LLC | Toronto | Independent Power Producer | 1 | 5.4 GWh | Dec 2024 | - | ||
Moraine Sands Wind Power, LLC | Toronto, ON | Independent Power Producer | 1 | 676.7 GWh | Apr 2025 | Apr 2025 | $4.22M | |
McHenry Battery Storage | Toronto, ON | Independent Power Producer | 1 | - | Nov 2023 | Apr 2025 | $280.68k | |
Matador Power Marketing, Inc. | Toronto, ON | - | - | - | Mar 2025 | $385.77k | ||
Mesquite Solar 3, LLC | Tonopah, AZ | Investor-Owned Utility | - | - | Dec 2017 | Apr 2025 | $4.94M | |
Mesquite Solar 2, LLC | Tonopah, AZ | Investor-Owned Utility | - | - | Dec 2017 | Apr 2025 | $3.17M | |
Mesquite Solar 1, LLC | Tonopah, AZ | - | - | Dec 2017 | Apr 2025 | $11.36M | ||
Morris Energy Operations Company, LLC | The Woodland, TX | Independent Power Producer | 2 | 64.4 GWh | Dec 2024 | - | ||
MS Sunflower Project Company, LLC | The Woodlands, TX | - | - | - | Mar 2025 | $205.94k | ||
Mass Solar, LLC | The Woodlands, TX | Independent Power Producer | 4 | 20.3 GWh | Dec 2024 | - | ||
McCallum Enterprises I LP | Stratford, CT | Independent Power Producer | 1 | 25.2 GWh | Dec 2024 | - | ||
Missouri Basin MUNI Power AGNY | Sioux Falls, SD | Political Subdivision | 1 | 5.5 GWh | Dec 2024 | Apr 2025 | $3.74M | |
Michigan Sugar Company | Sebewaing, MI | Industrial | 2 | 604.9 MWh | Mar 2025 | - | ||
Mountain Wind Power LLC | Scottsdale, AZ | Independent Power Producer | 1 | 151.0 GWh | Apr 2025 | Mar 2025 | $1.83M | |
Mountain Wind Power II LLC | Scottsdale, AZ | Independent Power Producer | 1 | 188.7 GWh | Apr 2025 | Mar 2025 | $2.46M | |
Morgan Community Solar | Scottsdale, AZ | Independent Power Producer | 1 | 5.3 GWh | Dec 2024 | - | ||
Moore Solar, LLC | Scottsdale, AZ | Independent Power Producer | 1 | 9.0 GWh | Dec 2024 | - | ||
Moapa Southern Paiute Solar, LLC | Scottsdale, AZ | - | - | - | Mar 2025 | $11.01M | ||
Meadowlark Solar, LLC | Scottsdale, AZ | Independent Power Producer | 1 | 9.9 GWh | Dec 2024 | - | ||
Mapleton Community Solar | Scottsdale, AZ | Independent Power Producer | 1 | 5.2 GWh | Dec 2024 | - | ||
MSC-Rice01 LLC | Scotch Plains, NJ | Independent Power Producer | 1 | 1.8 GWh | Dec 2024 | - | ||
MSC-Chisago01 LLC | Scotch Plains, NJ | Independent Power Producer | 1 | 1.8 GWh | Dec 2024 | - | ||
Morristown Solar II, LLC | Schenectady, NY | Independent Power Producer | 1 | 8.6 GWh | Dec 2024 | - | ||
MN CSG 2019-38 De LLC | Schenectady, NY | Independent Power Producer | 1 | 2.4 GWh | Dec 2024 | - | ||
MN CSG 2019-16 LLC | Schenectady, NY | Independent Power Producer | 1 | 2.1 GWh | Dec 2024 | - | ||
Milford Pepes Farm Road Solar LLC | Schenectady, NY | Independent Power Producer | 1 | 2.5 GWh | Dec 2024 | - | ||
Medin 2 Community Solar LLC | Schenectady, MD | Independent Power Producer | 1 | 1.9 GWh | Dec 2024 | - | ||
Middlesex County Utilities Authority | Sayerville, NJ | Municipally-Owned Utility | 1 | 115.6 GWh | Apr 2025 | - | ||
May Shannon Solar, LLC | Santa Monica, CA | Independent Power Producer | 1 | 4.2 GWh | Dec 2024 | - | ||
Macbeth Solar, LLC | Santa Monica, CA | Independent Power Producer | 1 | 39.7 GWh | Dec 2024 | - | ||
Moyer Solar, LLC | San Francisco, CA | Independent Power Producer | 1 | 10.5 GWh | Dec 2024 | - | ||
Mount Hope Solar 2 LLC | San Francisco, CA | Independent Power Producer | 1 | 3.9 GWh | Dec 2024 | - | ||
Mount Hope Solar 1 LLC | San Francisco, CA | Independent Power Producer | 1 | 3.6 GWh | Dec 2023 | - | ||
Moraine Solar, LLC | San Francisco, CA | Independent Power Producer | 1 | 5.2 GWh | Dec 2024 | - | ||
Minisink Solar LLC | San Francisco, CA | Independent Power Producer | 1 | 3.7 GWh | Dec 2024 | - | ||
Minisink Solar 2 LLC | San Francisco, CA | Independent Power Producer | 1 | 382.0 MWh | May 2024 | - | ||
Minisink Solar 1 LLC | San Francisco, CA | Independent Power Producer | 1 | 3.8 GWh | Dec 2024 | - | ||
Mililani I Solar LLC | San Francisco, CA | Independent Power Producer | 1 | 67.3 GWh | Apr 2025 | - | ||
Mesquite Star Special LLC | San Francisco, CA | Independent Power Producer | 1 | 1.3 TWh | Apr 2025 | - | ||
Maricopa West Solar PV, LLC | San Francisco, CA | Independent Power Producer | - | - | - | Mar 2025 | $215.06k | |
Maple Street Solar 1, LLC | San Francisco, CA | Independent Power Producer | 1 | 5.9 GWh | Dec 2023 | - | ||
Ma CS Ware West, LLC | San Francisco, CA | Independent Power Producer | 1 | 2.5 GWh | Dec 2024 | - | ||
Ma CS Uxbridge, LLC | San Francisco, CA | Independent Power Producer | 1 | 7.6 GWh | Dec 2024 | - | ||
MRP Pacifica Marketing LLC | San Diego, CA | - | - | - | Mar 2025 | $1.87M | $1.14M | |
Mountain Air Projects, LLC | San Diego, CA | Independent Power Producer | 6 | 388.6 GWh | Dec 2024 | - | ||
Milligan 1 Wind, LLC | San Diego, CA | Independent Power Producer | 1 | 1.2 TWh | Apr 2025 | Apr 2025 | $7.90M | |
Midway Peaking LLC | San Diego, CA | Independent Power Producer | - | - | Dec 2013 | Mar 2025 | $3.68M | |
Maverick Solar LLC | San Diego, CA | Independent Power Producer | 2 | 413.4 GWh | Apr 2025 | Apr 2025 | $2.20M | |
Maverick Solar 7, LLC | San Diego, CA | Independent Power Producer | 1 | 335.3 GWh | Apr 2025 | Apr 2025 | $1.81M | |
Maverick Solar 6, LLC | San Diego, CA | Independent Power Producer | 1 | 265.6 GWh | Apr 2025 | Apr 2025 | $2.22M | |
Maverick Solar 4, LLC | San Diego, CA | Independent Power Producer | 1 | 265.9 GWh | Apr 2025 | Apr 2025 | $2.67M | |
Malaga Power, LLC | San Diego, CA | - | - | - | Mar 2025 | $4.94M | ||
Morris Ridge Solar Energy Center, LLC | San Diego,, CA | Independent Power Producer | 1 | 94.4 GWh | Apr 2025 | Mar 2025 | $894.13k | |
Monterey CNTY Water Res Agency | Salinas, CA | Municipally-Owned Utility | 1 | 18.2 GWh | Dec 2024 | - | ||
Morgan Solar 4, LLC | Safety Harbor, FL | Independent Power Producer | 1 | 3.9 GWh | Dec 2024 | - | ||
Morgan Solar 2, LLC | Safety Harbor, FL | Independent Power Producer | 1 | 3.8 GWh | Dec 2024 | - | ||
McDonough Solar 1, LLC | Safety Harbor, FL | Independent Power Producer | 1 | 3.9 GWh | Dec 2024 | - | ||
Marlow Solar, LLC | Safety Harbor, FL | Independent Power Producer | 1 | 4.5 GWh | Dec 2024 | - | ||
Masser Farms Realty Ltd | Sacramento, PA | Independent Power Producer | 1 | 1.2 GWh | Dec 2024 | - | ||
Midwest Power Partners LLC | Ruthton, MN | Independent Power Producer | 8 | 53.1 GWh | Dec 2024 | - | ||
Moon Lake Electric Assn Inc | Roosevelt, UT | Cooperative | 2 | 7.0 GWh | Dec 2024 | - | ||
Materials Innovation Recycling Authority | Rocky Hill, CT | Political Subdivision | 1 | 1.2 GWh | Dec 2024 | - | ||
Morton Salt Inc | Rittman, OH | Industrial | 1 | 14.6 GWh | Dec 2024 | - | ||
MEVS Dot, LLC | Renton, WA | Independent Power Producer | 1 | 4.0 GWh | Dec 2024 | - | ||
Mammoth Three LLC | Reno, NV | - | - | - | Mar 2025 | $1.24M | ||
Mammoth One LLC | Reno, NV | - | - | - | Mar 2025 | $2.38M | ||
Microsoft Energy LLC | Redmond, WA | - | - | - | Mar 2025 | $1.68M | $14.53M |
Top Power Plants in United States
Plant | Location | Annual Generation | Initial Operation Date | Last Update | Fuel Types |
---|---|---|---|---|---|
Arkansas Nuclear One | Russellville, Arkansas | 15 TWh | Nov 1974 | Apr 2025 | Nuclear |
Barry | Bucks, Alabama | 15 TWh | Jan 1954 | Apr 2025 | Natural Gas : 93.7% Bituminous Coal : 6.3% |
Beaver Valley | Shippingport, Pennsylvania | 15 TWh | Aug 1976 | Apr 2025 | Nuclear |
Braidwood Generation Station | Braceville, Illinois | 20 TWh | Jun 1988 | Apr 2025 | Nuclear |
Browns Ferry | Decatur, Alabama | 29 TWh | Jul 1974 | Apr 2025 | Nuclear |
Brunswick Nuclear | Southport, North Carolina | 16 TWh | Oct 1975 | Apr 2025 | Nuclear |
Byron Generating Station | Byron, Illinois | 19 TWh | Aug 1985 | Apr 2025 | Nuclear |
Calvert Cliffs Nuclear Power Plant | Lusby, Maryland | 15 TWh | Apr 1975 | Apr 2025 | Nuclear |
Catawba | York, South Carolina | 19 TWh | May 1985 | Apr 2025 | Nuclear |
Comanche Peak | Glen Rose, Texas | 19 TWh | Jul 1990 | Apr 2025 | Nuclear |
Crystal River | Crystal River, Florida | 15 TWh | Sep 1966 | Apr 2025 | Natural Gas : 78.9% Bituminous Coal : 21.0% |
Diablo Canyon | Avila Beach, California | 18 TWh | Apr 1985 | Apr 2025 | Nuclear |
Donald C Cook | Bridgman, Michigan | 18 TWh | Jul 1975 | Apr 2025 | Nuclear |
Dresden Generating Station | Morris, Illinois | 15 TWh | Jul 1970 | Apr 2025 | Nuclear |
Edwin I Hatch | Baxley, Georgia | 14 TWh | Nov 1975 | Apr 2025 | Nuclear |
Gavin Power, LLC | Cheshire, Ohio | 12 TWh | Sep 1974 | Apr 2025 | Bituminous Coal : 99.5% Distillate Fuel Oil : 0.5% |
Ghent | Ghent, Kentucky | 11 TWh | Jan 1974 | Apr 2025 | Bituminous Coal : 99.9% |
Grand Coulee | Grand Coulee, Washington | 16 TWh | Feb 1941 | Apr 2025 | Water |
Grand Gulf | Port Gibson, Mississippi | 11 TWh | Jun 1985 | Apr 2025 | Nuclear |
Greensville County Power Station | Emporia, Virginia | 12 TWh | Nov 2018 | Apr 2025 | Natural Gas |
Guernsey Power Station | Byesville, Ohio | 12 TWh | Jan 2023 | Apr 2025 | Natural Gas |
H Allen Franklin Combined Cycle | Smiths, Alabama | 12 TWh | May 2002 | Apr 2025 | Natural Gas |
Hines Energy Complex | Bartow, Florida | 12 TWh | Mar 1999 | Apr 2025 | Natural Gas |
Jack McDonough | Smyrna, Georgia | 17 TWh | Apr 1971 | Apr 2025 | Natural Gas |
James H Miller Jr | Quinton, Alabama | 19 TWh | Sep 1978 | Apr 2025 | Subbituminous Coal : 99.1% Natural Gas : 0.9% |
Joseph M Farley | Columbia, Alabama | 15 TWh | Nov 1977 | Apr 2025 | Nuclear |
Labadie | Labadie, Missouri | 15 TWh | May 1970 | Apr 2025 | Subbituminous Coal : 99.9% |
LaSalle Generating Station | Marseilles, Illinois | 20 TWh | Dec 1983 | Apr 2025 | Nuclear |
Limerick | Sanatoga, Pennsylvania | 20 TWh | Jan 1986 | Apr 2025 | Nuclear |
McGuire | Huntersville, North Carolina | 19 TWh | Aug 1981 | Apr 2025 | Nuclear |
Millstone | Waterford, Connecticut | 17 TWh | Nov 1975 | Apr 2025 | Nuclear |
Monroe (MI) | Monroe, Michigan | 15 TWh | Oct 1969 | Apr 2025 | Subbituminous Coal : 74.5% Bituminous Coal : 15.8% Petroleum Coke : 9.6% |
Nine Mile Point Nuclear Station | Lycoming, New York | 16 TWh | Nov 1969 | Apr 2025 | Nuclear |
North Anna | Mineral, Virginia | 16 TWh | May 1978 | Apr 2025 | Nuclear |
Oak Grove (TX) | Franklin, Texas | 12 TWh | Mar 2010 | Apr 2025 | Lignite Coal : 98.0% Natural Gas : 2.0% |
Oconee | Seneca, South Carolina | 22 TWh | Jun 1973 | Apr 2025 | Nuclear |
Palo Verde | Wintersburg, Arizona | 32 TWh | Dec 1985 | Apr 2025 | Nuclear |
Peach Bottom | Delta, Pennsylvania | 22 TWh | Jun 1974 | Apr 2025 | Nuclear |
PSEG Salem Generating Station | Hancocks Bridge, New Jersey | 18 TWh | May 1971 | Apr 2025 | Nuclear |
Quad Cities Generating Station | Cordova, Illinois | 15 TWh | Nov 1972 | Apr 2025 | Nuclear |
Robert Moses Niagara | Lewiston, New York | 15 TWh | Dec 1960 | Apr 2025 | Water |
South Texas Project | Wadsworth, Texas | 21 TWh | Jul 1988 | Apr 2025 | Nuclear |
St Lucie | Jensen Beach, Florida | 16 TWh | Apr 1976 | Apr 2025 | Nuclear |
Surry | Surry, Virginia | 13 TWh | Nov 1972 | Apr 2025 | Nuclear |
TalenEnergy Susquehanna | Berwick, Pennsylvania | 20 TWh | May 1983 | Apr 2025 | Nuclear |
Turkey Point | Homestead, Florida | 21 TWh | Mar 1967 | Apr 2025 | Nuclear : 66.2% Natural Gas : 33.8% |
Vogtle | Waynesboro, Georgia | 35 TWh | Apr 1987 | Apr 2025 | Nuclear |
W A Parish | Thompsons, Texas | 14 TWh | May 1958 | Apr 2025 | Subbituminous Coal : 82.6% Natural Gas : 17.4% |
Watts Bar Nuclear Plant | Spring City, Tennessee | 15 TWh | Apr 1996 | Apr 2025 | Nuclear |
West County Energy Center | Loxahatchee, Florida | 19 TWh | Jul 2009 | Apr 2025 | Natural Gas : 99.9% |