Broken Bow Wind II, LLC
80339 Rd 444, Broken Bow, NE 68822Plant Summary Information
Broken Bow Wind II, LLC is ranked #26 out of 123 power plants in Nebraska in terms of total annual net electricity generation.
Broken Bow Wind II, LLC generated 46.3 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Broken Bow Wind II, LLC |
|---|---|
| Utility Name | Consolidated Edison Development Inc. |
| Location | Custer County, NE |
| Initial Operation Date | October 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 253.6 GWh |
| Annual Consumption | 951.3 k MMBtu |
| Ranked #2,214 out of 12,613 Power Plants Nationwide | |
| Ranked #670 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #26 out of 123 Nebraska Power Plants | |
| Ranked #14 out of 34 Nebraska Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Broken Bow Wind II, LLC (2013 to 2018) Consolidated Edison Development Inc. (2019 to 2024) |
Map of Broken Bow Wind II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broken Bow Wind II, LLC.
Monthly Net Generation for Broken Bow Wind II, LLC
Monthly Plant Fuel Consumption for Broken Bow Wind II, LLC
Broken Bow Wind II, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Broken Bow Wind II, LLC (58981) |
| Plant Address | 80339 Rd 444, Broken Bow, NE 68822 |
| Utility | Consolidated Edison Development Inc. (56769) |
| Latitude, Longitude | 41.32389, -99.32306 |
| Generation Dates on File | Oct 2014 to Dec 2024 |
| Initial Operation Date | October 2014 |
| Annual Generation | 253.6 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-54 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 14-65 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nebraska Public Power District (13337) NE |
| Grid Voltage | 120.00 kV |
| Energy Storage | No |
Generator BBII Details Operating October 2014
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 73.1 MW |
| Summer Capacity | 73.1 MW |
| Winter Capacity | 73.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 43 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.7-100 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Broken Bow Wind II, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #660 | Cassadaga Wind Farm | Cherry Creek, NY | 256.6 GWh |
| #661 | Criterion | Oakland, MD | 256.6 GWh |
| #662 | Apple Blossom Wind Farm | Pigeon, MI | 256.3 GWh |
| #663 | Pheasant Run Wind LLC | Pigeon, MI | 256.2 GWh |
| #664 | San Roman Wind I, LLC | Los Fresnos, TX | 255.7 GWh |
| #665 | Hancock County Wind Energy Center | Garner, IA | 255.5 GWh |
| #666 | Brookfield | Pigeon, MI | 254.9 GWh |
| #667 | Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh |
| #668 | Red Barn Energy | Montfort, WI | 253.7 GWh |
| #669 | Campbell Hill Windpower | Glenrock, WY | 253.7 GWh |
| #671 | Sigel Wind Park | Harbor Beach, MI | 253.4 GWh |
| #672 | Stillwater Wind, LLC | Reed Point, MT | 252.7 GWh |
| #673 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
| #674 | Borderlands Wind, LLC | Quemado, NM | 252.1 GWh |
| #675 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #676 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 251.4 GWh |
| #677 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #678 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #679 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
| #680 | San Juan Mesa Wind Project LLC | Elida, NM | 250.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broken Bow Wind II, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Airport 009239 SCS Lexington, LLC | Lexington, NE | 2.2 GWh | 43.8 mi |
| Ansley | Ansley, NE | 22.0 MWh | 4.1 mi |
| Broken Bow | Broken Bow, NE | 67.0 MWh | 17.3 mi |
| Broken Bow Wind LLC | Broken Bow, NE | 205.7 GWh | 15.6 mi |
| Burwell | Burwell, NE | 32.0 MWh | 33 mi |
| C W Burdick | Grand Island, NE | 4.8 GWh | 58.8 mi |
| Canaday | Lexington, NE | 35.7 GWh | 47.8 mi |
| City of Lexington | Lexington, NE | 6.5 GWh | 44.6 mi |
| Jeffrey | Brady, NE | 86.3 GWh | 61.3 mi |
| Johnson 1 | Elwood, NE | 55.8 GWh | 50.6 mi |
| Johnson 2 | Lexington, NE | 69.3 GWh | 49.4 mi |
| Kearney | Kearney, NE | 416.0 MWh | 44.4 mi |
| Kearney NPPD Solar Project | Kearney, NE | 8.6 GWh | 44.1 mi |
| Monroe 009452 SCS Cozad, LLC | Cozad, NE | 4.7 GWh | 46.2 mi |
| Museum Drive East Solar | Grand Island, NE | 22.0 MWh | 59.5 mi |
| Ord | Ord, NE | 106.0 MWh | 28.2 mi |
| Platte | Grand Island, NE | 358.8 GWh | 60.2 mi |
| Sargent | Sargent, NE | 9.0 MWh | 22.1 mi |
| Spalding | Spalding, NE | 4.0 MWh | 55.3 mi |
| St. Paul-Howard Greeley | St. Paul, NE | 2.4 GWh | 46.2 mi |