Rhode Island Hospital
593 Eddy Street, Providence, RI 2903Plant Summary Information
Rhode Island Hospital is ranked #27 out of 99 power plants in Rhode Island in terms of total annual net electricity generation.
Rhode Island Hospital is comprised of 4 generators and generated 6.0 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Rhode Island Hospital |
|---|---|
| Utility Name | Rhode Island Hospital |
| Location | Providence County, RI |
| Initial Operation Date | October 1974 |
| Last Update | Nov 2025 |
| Annual Generation | 9.8 GWh |
| Annual Consumption | 561.9 k MMBtu |
| Ranked #6,195 out of 12,574 Power Plants Nationwide | |
| Ranked #1,597 out of 2,244 Natural Gas Power Plants Nationwide | |
| Ranked #27 out of 99 Rhode Island Power Plants | |
| Ranked #8 out of 8 Rhode Island Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 89.6% Residual Fuel Oil : 10.4% |
Map of Rhode Island Hospital
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rhode Island Hospital.
Monthly Net Generation for Rhode Island Hospital
Rhode Island Hospital Details
| Summary Information | |
|---|---|
| Plant Name | Rhode Island Hospital (52024) |
| Plant Address | 593 Eddy Street, Providence, RI 2903 |
| Utility | Rhode Island Hospital (16001) |
| Latitude, Longitude | 41.8103, -71.41 |
| Generation Dates on File | Jan 2001 to Nov 2025 |
| Initial Operation Date | October 1974 |
| Annual Generation | 9.8 GWh |
| Fuel Types | Natural Gas : 89.6% Residual Fuel Oil : 10.4% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Hospitals (622) |
| Sector | Commercial CHP (5) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | The Narragansett Electric Co (13214) RI |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | NARRAGANSETT ELECTRIC CO GAS DIV RI |
| Pipeline Name | ILLINOIS GAS TRANSMISSION |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator GEN2 Details Operating October 1974
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1974 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 1.75 MW |
| Net Winter Capacity With Natural Gas | 1.75 MW |
| Net Summer Capacity With Oil | 1.75 MW |
| Net Winter Capacity With Oil | 1.75 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Other Limits | Yes |
Generator GEN4 Details Operating October 1974
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1974 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 1.75 MW |
| Net Winter Capacity With Natural Gas | 1.75 MW |
| Net Summer Capacity With Oil | 1.75 MW |
| Net Winter Capacity With Oil | 1.75 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Other Limits | Yes |
Generator NEW1 Details Operating December 1993
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3.5 MW |
| Winter Capacity | 3.5 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1993 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 3.5 MW |
| Net Winter Capacity With Natural Gas | 3.5 MW |
| Net Summer Capacity With Oil | 3.5 MW |
| Net Winter Capacity With Oil | 3.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Other Limits | Yes |
Generator NEW3 Details Operating September 1993
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3.5 MW |
| Winter Capacity | 3.5 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1993 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 3.5 MW |
| Net Winter Capacity With Natural Gas | 3.5 MW |
| Net Summer Capacity With Oil | 3.5 MW |
| Net Winter Capacity With Oil | 3.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Other Limits | Yes |
Rhode Island Hospital Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1587 | Hancock | Commerce Twp, MI | 9.2 GWh |
| #1588 | Connecticut College | New London, CT | 9.1 GWh |
| #1589 | Kyocera International Inc.(San Diego) | San Diego, CA | 9.1 GWh |
| #1590 | CSL Behring LLC | Bradley, IL | 9.1 GWh |
| #1591 | SEMASS Resource Recovery | West Wareham, MA | 568.7 GWh |
| #1592 | Redlands Community Hospital | Redlands, CA | 9.0 GWh |
| #1593 | El Cajon Energy Center | El Cajon, CA | 9.0 GWh |
| #1594 | Ivanpah 3 | Nipton, CA | 237.9 GWh |
| #1595 | Roll Delano | Delano, CA | 8.9 GWh |
| #1596 | Agua Mansa Power Plant | Colton, CA | 8.8 GWh |
| #1598 | NHH003 Clarkson Fuel Cell | Brooklyn, NY | 8.8 GWh |
| #1599 | FLEX Gibraltar | Milpitas, CA | 8.7 GWh |
| #1600 | Ripon Generation Station | Ripon, CA | 8.7 GWh |
| #1601 | CalTech - Pasadena (PPA) | Pasadena, CA | 8.7 GWh |
| #1602 | Kaiser Downey | Downey, CA | 8.7 GWh |
| #1603 | CST001 McCarthy Fuel Cell | Milpitas, CA | 8.7 GWh |
| #1604 | Caltech Central | Pasadena, CA | 8.7 GWh |
| #1605 | Tulare BioMAT Fuel Cell | Tulare, CA | 13.7 GWh |
| #1606 | Dick's Creek | Monroe, OH | 8.7 GWh |
| #1607 | Georgia LFG Oak Grove Plant | Winder, GA | 38.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rhode Island Hospital.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Central Power Plant | Cranston, RI | 18.8 GWh | 5.2 mi |
| Forbes Street Solar | East Providence, RI | 3.6 GWh | 4.5 mi |
| GD Johnson Scituate I, LLC | Cranston, RI | 5.7 GWh | 4.9 mi |
| Green Providence Wind I, LLC | Providence, RI | 1.6 GWh | 1.9 mi |
| Green Providence Wind II, LLC | Providence, RI | 3.8 GWh | 2.1 mi |
| ISM Solar Cranston CSG | Cranston, RI | 4.1 GWh | 5.9 mi |
| Johnston LFG Turbine Plant | Johnston, RI | 170.8 GWh | 5.9 mi |
| Kearsarge East Providence | East Providence, RI | 3.1 GWh | 2.6 mi |
| Kilvert | Warwick, RI | 8.4 GWh | 6.1 mi |
| Little Bay | Providence, RI | 1.6 GWh | 1.5 mi |
| Manchester Street | Providence, RI | 1.9 TWh | 0.5 mi |
| NBC Field's Point Wind Farm | Providence, RI | 7.2 GWh | 1.5 mi |
| North Providence | North Providence, RI | 3.5 GWh | 5.4 mi |
| Orbit Energy RI | Johnston, RI | 144.0 MWh | 5.4 mi |
| Rhode Island State Energy Center | Johnston, RI | 3.4 TWh | 5.6 mi |
| Ridgewood Providence Power | Johnston, RI | 1.5 GWh | 6.2 mi |
| WED Green Hill, LLC | Johnston, RI | 6.9 GWh | 6.2 mi |
| WED Plainfield III, LLC | Johnston, RI | 6.1 GWh | 6.3 mi |
| WED Plainfield, LLC | Johnston, RI | 6.0 GWh | 6.6 mi |
| WED Shun II, LLC | Johnston, RI | 6.5 GWh | 6.5 mi |