Black Mesa Solar, LLC
E Substation Rd, King Hill, ID 83633Plant Summary Information
Black Mesa Solar, LLC is ranked #37 out of 141 power plants in Idaho in terms of total annual net electricity generation.
Black Mesa Solar, LLC generated 24.4 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Black Mesa Solar, LLC |
|---|---|
| Utility Name | Black Mesa Solar, LLC |
| Location | Elmore County, ID |
| Initial Operation Date | June 2023 |
| Last Update | Oct 2025 |
| Annual Generation | 90.7 GWh |
| Annual Consumption | 331.2 k MMBtu |
| Ranked #3,512 out of 12,553 Power Plants Nationwide | |
| Ranked #848 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #37 out of 141 Idaho Power Plants | |
| Ranked #5 out of 13 Idaho Solar Power Plants | |
| Fuel Types | Solar |
Map of Black Mesa Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Black Mesa Solar, LLC.
Monthly Net Generation for Black Mesa Solar, LLC
Black Mesa Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Black Mesa Solar, LLC (66569) |
| Plant Address | E Substation Rd, King Hill, ID 83633 |
| Utility | Black Mesa Solar, LLC (65526) |
| Latitude, Longitude | 42.90741, -115.18154 |
| Generation Dates on File | Jun 2023 to Oct 2025 |
| Initial Operation Date | June 2023 |
| Annual Generation | 90.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Idaho Power Company (IPCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Idaho Power Co (9191) ID |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator BMSA Details Operating June 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 40 MW |
| Summer Capacity | 40 MW |
| Winter Capacity | 40 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 54 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Black Mesa Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #838 | Five Points Solar Park | Five Points, CA | 93.3 GWh |
| #839 | Citrus Ridge Solar | Bay Lake, FL | 93.1 GWh |
| #840 | Millington Solar Farm | Millington, TN | 92.9 GWh |
| #841 | Vancourt Solar Interconnections | La Feria, TX | 92.6 GWh |
| #842 | Lake Hancock Solar | Bartow, FL | 92.6 GWh |
| #843 | Brightside | Beeville, TX | 91.3 GWh |
| #844 | Camino Solar Hybrid | Rosamond, CA | 91.2 GWh |
| #845 | Monroe Solar Facility | Monroe, NC | 91.2 GWh |
| #846 | BT Signal Ranch | Quinlan, TX | 91.1 GWh |
| #847 | Gulf Coast Solar Center III | Bellview, FL | 91.1 GWh |
| #849 | Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh |
| #850 | Edwards Sanborn S4 | Mojave, CA | 89.6 GWh |
| #851 | Beacon Solar Plant Site 5 | Cantil, CA | 89.7 GWh |
| #852 | Highest Power Solar, LLC | Louisburg, NC | 89.7 GWh |
| #853 | Nevada Solar One | Boulder City, NV | 90.4 GWh |
| #854 | Stanly Solar, LLC | Albemarle, NC | 89.4 GWh |
| #855 | Sumrall I Solar Farm | Sumrall, MS | 89.1 GWh |
| #856 | Louise Solar | Taopi, MN | 89.0 GWh |
| #857 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 88.9 GWh |
| #858 | Edwards Sanborn S3 | Mojave, CA | 84.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Black Mesa Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bliss (ID) | Bliss, ID | 332.6 GWh | 5.6 mi |
| Camp Reed | Glenns Ferry, ID | 69.4 GWh | 9.4 mi |
| Cassia Gulch | Hagerman, ID | 37.0 GWh | 8.6 mi |
| Cassia Wind | Hagerman, ID | 18.2 GWh | 8.5 mi |
| Cold Springs Windfarm | Glenns Ferry, ID | 55.6 GWh | 13.9 mi |
| Fossil Gulch | Hagerman, ID | 24.5 GWh | 12.2 mi |
| Hammett Hill Windfarm | Glenns Ferry, ID | 62.2 GWh | 15.8 mi |
| High Mesa | King Hill, ID | 83.3 GWh | 7.6 mi |
| Lower Malad | Hagerman, ID | 102.0 GWh | 14.2 mi |
| Lower Salmon | Hagerman, ID | 232.0 GWh | 14.8 mi |
| Mainline Windfarm | Glenns Ferry, ID | 61.7 GWh | 15.2 mi |
| Oregon Trail Wind Park | Hagerman, ID | 40.6 GWh | 10.8 mi |
| Payne's Ferry | Hagerman, ID | 67.8 GWh | 10.3 mi |
| Pilgrim Stage Wind Park | Hagerman, ID | 34.3 GWh | 12 mi |
| Sawtooth Wind Project | Glenns Ferry, ID | 60.3 GWh | 11.9 mi |
| Thousand Springs Wind Park | Hagerman, ID | 34.1 GWh | 11.1 mi |
| Tuana Gulch Wind Park | Hagerman, ID | 29.3 GWh | 11.8 mi |
| Tuana Springs | Hagerman, ID | 29.3 GWh | 8.4 mi |
| Upper Malad | Hagerman, ID | 58.3 GWh | 15.3 mi |
| Yahoo Creek | Hagerman, ID | 68.4 GWh | 13.6 mi |