Panda Sherman Power Station
510 Progress Drive, Sherman, TX 75092Plant Summary Information
Panda Sherman Power Station is ranked #44 out of 726 power plants in Texas in terms of total annual net electricity generation.
Panda Sherman Power Station is comprised of 3 generators and generated 904.0 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Panda Sherman Power Station |
---|---|
Utility Name | PPG - O&M Panda Sherman Power LLC |
Location | Grayson County, TX |
Initial Operation Date | August 2014 |
Last Update | Feb 2024 |
Annual Generation | 3.4 TWh |
Annual Consumption | 25.2 M MMBtu |
Ranked #370 out of 11,455 Power Plants Nationwide | |
Ranked #210 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #44 out of 726 Texas Power Plants | |
Ranked #33 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Panda Sherman Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Panda Sherman Power Station.
Monthly Net Generation for Panda Sherman Power Station
Panda Sherman Power Station Details
Summary Information | |
---|---|
Plant Name | Panda Sherman Power Station (58005) |
Plant Address | 510 Progress Drive Sherman, TX 75092 |
Utility | PPG - O&M Panda Sherman Power LLC (57379) |
Latitude, Longitude | 33.58257, -96.61789 |
Generation Dates on File | Aug 2014 to Feb 2024 |
Initial Operation Date | August 2014 |
Annual Generation | 3.4 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lake Texoma |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | GULF CROSSING PL LLC |
Natural Gas Storage | No |
Generator CTG-1 Details Operating August 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PANDA_S_CT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PANDA_S_CC1 |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 199 MW |
Winter Capacity | 224 MW |
Minimum Load | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-2 Details Operating August 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PANDA_S_CT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PANDA_S_CC1 |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 199 MW |
Winter Capacity | 224 MW |
Minimum Load | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG-1 Details Operating August 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | PANDA_S_ST1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PANDA_S_CC1 |
Nameplate Capacity | 339.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 287 MW |
Winter Capacity | 316 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Panda Sherman Power Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#200 | Jack Fusco Energy Center | Thompsons, TX | 3.6 TWh |
#201 | Hinds Energy Facility | Jackson, MS | 3.6 TWh |
#202 | Birdsboro Power | Birdsboro, PA | 3.6 TWh |
#203 | Lost Pines 1 Power Project | Bastrop, TX | 3.5 TWh |
#204 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 3.5 TWh |
#205 | Carville Energy LLC | St Gabriel, LA | 3.5 TWh |
#206 | Marshall (NC) | Terrell, NC | 7.6 TWh |
#207 | ANP Bellingham Energy Project | Bellingham, MA | 3.5 TWh |
#208 | McWilliams | Gantt, AL | 3.5 TWh |
#209 | Gateway Generating Station | Antioch, CA | 3.4 TWh |
#211 | Bear Garden | New Canton, VA | 3.4 TWh |
#212 | Empire Generating Co LLC | Rensselaer, NY | 3.4 TWh |
#213 | Harding Street | Indianapolis, IN | 3.4 TWh |
#214 | Los Medanos Energy Center | Pittsburg, CA | 3.4 TWh |
#215 | Red Oak Power LLC | Sayreville, NJ | 3.4 TWh |
#216 | Colusa Generating Station | Maxwell, CA | 3.4 TWh |
#217 | Port Westward | Clatskanie, OR | 3.3 TWh |
#218 | Carty Generating Station | Boardman, OR | 3.3 TWh |
#219 | Magic Valley Generating Station | Edinburg, TX | 3.3 TWh |
#220 | Wansley Unit 9 | Franklin, GA | 3.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Panda Sherman Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BT Cooke Solar, LLC | Gainsville, TX | 132.6 GWh | 32.4 mi |
Butterfield Solar Farm | Durant, OK | 4.6 GWh | 28.7 mi |
Choctaw Nation Solar Farm | Calera, OK | 10.9 GWh | 28.7 mi |
Coniglio Solar | Wolfe City, TX | 226.9 GWh | 33.2 mi |
CoServ Community Solar Station | Aubrey, TX | 2.3 GWh | 30 mi |
Denison | Denison, TX | 93.9 GWh | 16.5 mi |
G.S.E. One LLC | Bonham, TX | 178.1 GWh | 27.7 mi |
Highway 56 Solar | Sherman, TX | 8.0 GWh | 4.7 mi |
Leon Solar | Greenville, TX | 22.4 GWh | 36.4 mi |
North Gainesville Solar | Gainesville, TX | 9.8 GWh | 31 mi |
WAL202 | Frisco, TX | 80.0 MWh | 34.9 mi |
WAL2883 | Plano, TX | 250.0 MWh | 35.1 mi |
WAL3777 | Frisco, TX | 169.5 MWh | 31.8 mi |
WAL5211 | McKinney, TX | 230.7 MWh | 29.7 mi |
WAL5311 | Mckinney, TX | 252.3 MWh | 26.2 mi |
WAL947 | Sherman, TX | 294.0 MWh | 6.3 mi |
West Moore Solar II | Sherman, TX | 7.7 GWh | 2.5 mi |
Whitesboro Solar | Whitesboro, TX | 11.7 GWh | 14.6 mi |
Whitesboro Solar II | Whitesboro, TX | 10.8 GWh | 14.7 mi |
Whitewright Solar | Whitewright, TX | 20.6 GWh | 14.9 mi |