Room 220 Power Plant, Ames, IA 50011Plant Summary Information
Iowa State University is ranked #10 out of 50 natural gas power plants in Iowa in terms of total annual net electricity generation.
Iowa State University is comprised of 3 generators and generated 20.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Iowa State University |
|---|---|
| Utility Name | Iowa State University |
| Location | Story County, IA |
| Initial Operation Date | October 1960 |
| Last Update | Mar 2026 |
| Annual Generation | 75.7 GWh |
| Annual Consumption | 2.5 M MMBtu |
| Ranked #3,746 out of 12,332 Power Plants Nationwide | |
| Ranked #968 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #105 out of 274 Iowa Power Plants | |
| Ranked #10 out of 50 Iowa Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 97.8% Distillate Fuel Oil : 2.2% |
Map of Iowa State University
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iowa State University.
Monthly Net Generation for Iowa State University
Monthly Plant Fuel Consumption for Iowa State University
Iowa State University Details
| Summary Information | |
|---|---|
| Plant Name | Iowa State University (54201) |
| Plant Address | Room 220 Power Plant, Ames, IA 50011 |
| Utility | Iowa State University (9434) |
| Latitude, Longitude | 42.0275, -93.6394 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | October 1960 |
| Annual Generation | 75.7 GWh |
| Fuel Types | Natural Gas : 97.8% Distillate Fuel Oil : 2.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Ames - (IA) (554) IA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | INTERSTATE POWER AND LIGHT COMPANY |
| Natural Gas Storage | No |
Generator GEN5 Details Operating March 1970
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 11.5 MW |
| Winter Capacity | 11.5 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 1970 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | No |
| Subcritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating September 1978
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 13.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 13.3 MW |
| Winter Capacity | 13.3 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1978 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | No |
| Subcritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating May 2005
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 15.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 15.1 MW |
| Winter Capacity | 15.1 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2005 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | No |
| Subcritical Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Iowa State University Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #958 | DeRidder Mill | DeRidder, LA | 402.4 GWh |
| #959 | Port Comfort Power LLC | Point Comfort, TX | 76.1 GWh |
| #960 | Biron Mill | Wisconsin Rapids, WI | 95.7 GWh |
| #961 | UMCP CHP Plant | College Park, MD | 84.4 GWh |
| #962 | Pouch | Staten Island, NY | 75.9 GWh |
| #963 | Berry NMW Cogens | Bakersfield, CA | 75.4 GWh |
| #964 | Suwannee River | Live Oak, FL | 76.0 GWh |
| #965 | Boise Cascade International Falls | International Falls, MN | 334.5 GWh |
| #966 | Dan E Karn | Essexville, MI | 80.4 GWh |
| #967 | R M Schahfer | Wheatfield, IN | 1.4 TWh |
| #969 | Lawrence Energy Center | Lawrence, KS | 1.5 TWh |
| #970 | Baconton Power Plant | Baconton, GA | 74.0 GWh |
| #971 | NCSU Cates Cogeneration Plant | Raleigh, NC | 75.4 GWh |
| #972 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 171.2 GWh |
| #973 | Anheuser-Busch Jacksonville | Jacksonville, FL | 73.4 GWh |
| #974 | CP Kelco San Diego Plant | San Diego, CA | 73.1 GWh |
| #975 | LSU Cogen | Baton Rouge, LA | 72.9 GWh |
| #976 | James River Power Station | Springfield, MO | 84.1 GWh |
| #977 | Warren F Sam Beasley Generation Station | Smyrna, DE | 88.4 GWh |
| #978 | Riverside Energy Resource Center | Riverside, CA | 71.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iowa State University.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ames Electric Services Power Plant | Ames, IA | 305.6 GWh | 1.6 mi |
| Ames GT | Ames, IA | 420.0 MWh | 2.9 mi |
| Fareway Customer Hosted 1 MW Solar | Boone, IA | 1.1 GWh | 11.4 mi |
| FPL Energy Story Wind LLC | Zearing, IA | 533.9 GWh | 19.6 mi |
| Garden Wind LLC | Zearing, IA | 336.9 GWh | 19.3 mi |
| Great Pathfinder Wind | Stratford, IA | 738.6 GWh | 17.7 mi |
| IA - City of Ames - Airport Road | Ames, IA | 3.1 GWh | 2 mi |
| ISU Customer Hosted 1MW Solar Project | Ames, IA | 1.6 GWh | 3.4 mi |
| Michelangelo Wind 1 LLC | Huxley, IA | 7.9 GWh | 10.2 mi |
| Michelangelo Wind 3 LLC | Huxley, IA | 8.6 GWh | 6.5 mi |
| Michelangelo Wind 4 LLC | Ames, IA | 10.4 GWh | 4.6 mi |
| NCAH Central Utility Plant | Ames, IA | 983.1 MWh | 3.3 mi |
| Optimum Wind 3 LLC | Nevada, IA | 10.4 GWh | 6.5 mi |
| Optimum Wind 4 LLC | Nevada, IA | 10.5 GWh | 6.4 mi |
| Optimum Wind 5 LLC | Nevada, IA | 9.0 GWh | 6.3 mi |
| Optimum Wind 6 LLC | Nevada, IA | 8.7 GWh | 6.1 mi |
| Optimum Wind 7 LLC | Nevada, IA | 11.0 GWh | 10.7 mi |
| POET Biorefining - Jewell | Jewell, IA | 21.7 GWh | 20.8 mi |
| Story City | Story City, IA | 97.0 MWh | 11.1 mi |
| Story City Wind Project | Story City, IA | 5.1 GWh | 12.6 mi |